10 Important Points to Remember After Completing Cargo Operations on Tankers

Beschreibung

UAC J. Saray Ramos Palencia
s4ro10
Mindmap von s4ro10, aktualisiert more than 1 year ago
s4ro10
Erstellt von s4ro10 vor fast 9 Jahre
16
0

Zusammenfassung der Ressource

10 Important Points to Remember After Completing Cargo Operations on Tankers
  1. 1.Check Loaded Quantity: when the loading operations , the amount of charge of the tankers ends must be reviewed by a responsible officer and by a representative on the shore. and the amount should be reported to the master and immediate authority .
    1. 2. Inform Engine Room: notify the engine department the discharging is finished and wait for the inspector to issue the "Dry tank certificate and Empty Tank Certificate "
    2. 3. Keep The Logbook Updated: update loading times and discharging operations are recorded in the logbook office and main points in the Deck logbook.
      1. 4.. Close All Valves: after completion of the loading and unloading operations , all valves must be closed. the ground control valves are closed first tanker valves .
        1. 5. Remove the Cargo Hoses By Avoiding Oil Spill: After verifying that the valves are closed , charging hoses they must be removed. this is to prevent the oil spill
          1. 6. Check Breather Valve: the vent valves must be verified and evaluated to maintain the pressure inside the tank.
            1. 7. Change the Flange Position: change the position of the mounting flange showing the blank side to isolate the line and prevent overflow
              1. 8. Close tank openings: all tank openings must be closed after completion of loading and unloading. This was carried out by a pump- man or bosun under the direction of chief officer responsible .
                1. 9. Remove Linking Cables Earth : the union of Earth Cables should be taken after charging hoses are disconnected.
                  1. 10. Open Drain Cocks: tanks and valves in land should be closed , and the taps in the collector tank must be opened to allow drainage of cargo in fixed tanks drains or portable drip trays
      Zusammenfassung anzeigen Zusammenfassung ausblenden

      ähnlicher Inhalt

      American Dream
      luisepeters
      Teil B, Kapitel 1.3, Handelsregister
      Stefan Kurtenbach
      Einstufungstest Englisch
      SprachschuleAktiv
      Statistik und Differenzialgleichungen
      barbara91
      Themenübersicht (Analysis)
      Honolulu
      Proteinbiosynthese
      Cornelius Ges
      Unsere Erde - Sonnensystem, Klima, Erdschichten etc.
      rezension1
      Wortschatz Französisch 1. Angaben zur Person
      l_u_n_a_19
      Vetie Radiologie 2013
      Péroline de Gail
      Onlinequiz zu MS-4.2 kapitel II
      Deborah Büscher
      Repro 2016 Vetie
      Julia To