SAB7#20_Pre-project conditions
  1. Constraints
    1. Assumptions
      1. Constraints limit the team's options
        1. Boundaries or parameters will the project have to function within
        2. Assumptions that are assumed to be true or reliable
          1. Part or the risk management process
            1. Things we believe but we don't have proof or data
            2. Define project Scope
              1. Those have to be identify and review them for validity during life's project
                1. The Project management plan may need to change
                  Zusammenfassung anzeigen Zusammenfassung ausblenden

                  ähnlicher Inhalt

                  Teil B, Kapitel 3, Entscheidungsgrundlagen bei der Wahl der Rechtsform
                  Stefan Kurtenbach
                  Öff. Recht - Streitigkeiten Verwaltungsrecht AT
                  myJurazone
                  Zivilrecht - Handelsrecht Streitigkeiten
                  myJurazone
                  Was darf mit ins Flugzeug?
                  B G
                  Spanische Verben
                  barbara91
                  Deutsch Partizip Perfekt - unregelmäßige Verben
                  Claus Lenz
                  Thermodynamik I/II
                  K G
                  Φαρμακολογια 1 Ε
                  Lampros Dimakopoulos
                  Vetie - AVO 2018
                  Schmolli Schmoll
                  Vetie Spezielle Pathologie 2022
                  Alessandro Bertino