Zusammenfassung der Ressource
Environmental Aspects
- Solutions mitigating air pollution
- reduce dust
- concrete breaking
- wet concrete
surface
- alternative
techniques
- hydraulic splitter
- coring
- wire-sawing
- chemical breaking
- soil surface
- continuous spraying
water on surface
- pave with
concrete/ hardcore
- temporary
soil heave
- cover with
plastic cover
- spread of dust
- hoarding of
adequate height
- wash the
wheels of trucks
- X use compressed
air to clean dusty
roads/surfaces
- material hoist covered
with plastic sheets
- material easily blown away
- store indoor/ enclose
- eliminate fumes
generated in
electric-arc welding
- use bolt-and-nut
connection
- reduce smoke
- open burning prohibited
(special permission
from EPD)
- indoor air quality
control (maintenance
& repair works)
- extract air pollutants
- exhaust fan
- -ve pressure
maintained indoor
- Solutions mitigating
noise pollution
- percussive
(displacement) piling
- use bored piles
- add sound
-absorbing enclosure
around head of pile
- use noise-
reduction resilient
packing at pile head
- use hydraulic
/vibratory pile driving
- general works
- stricter control on
- Specified powered
mechanical
equipment
- hand-held
percussive breaker
- concrete lorry
truck, dump truck
- bulldozer
- vibratory poker
- prescribed
construction work
- erection/dismantling
of formwork
- handling of steel bars
- hammering
- add acoustic barriers/
machinery enclosures
- break concrete using
alternative techniques
- use plastic refuse chute
- scrabble of concrete at
stop-ends & construction joints
- replaced by
metal stop-ends
- locate the noise
generating works away
from sensitive users
- water pumping station
- concrete batching plant
- repair and maintenance
works in occupied buildings
- use concrete crushing machine
- hoarding - noise enclosure
- work time suit building use
- phasing of works
- treatment of sewage
- waste water filtered
and sediment before
discharge
- recycle and reuse of
wastewater
- waste water in truck
washing system
- open channels to
collect waste water
- silt traps
- construction &
demolition waste
- policy implemented
- trip-ticket
system
- user-pay
policy/ waste
charge scheme
- waste management
plan for public works
- waste reduction
- Building design
- slim construction design
- balanced cut and-fill design
- Formwork
- coupler (reinforcement
bar lapping at connection)
- use of reusable and
durable material
- metal formwork/ scaffolding
& gondola/ hoarding
(timber/bamboo/timber)
- high density
overlaid plywood
- polymer resin
coating on plywood
formwork
- Pecaform
- laminating a layer of
polyethylene to both
sides of a high tensile
steel wire mesh
- Concrete work
- re-use of
concrete/masonry waste
as recycled aggregate
- paving bricks
- concrete curbs
- concrete blocks
- Dry wall (concrete
block wall)
- galvanized steel stud frame
lined with fibre cement
sheets+ lightweight concrete
- PFA concrete
- Mansory work
- spraying mortar
- Demolition
- sequential
demolition
- material
management
- proper storage of
materials at site
- onsite control
of materials