A new bulk system is to be installed at a local hospital; therefore, new wiring from the local panel on the bulk must be run underground to the entry point of the facility. At a minimum, how many sets of wires for each signal are allowable between the initiating device at the bulk and junction box located in the facility?
Wähle eine der folgenden: