Chapter 8 GSCM

Beschreibung

Chapter 8
bball3r76
Quiz von bball3r76, aktualisiert more than 1 year ago
bball3r76
Erstellt von bball3r76 vor fast 9 Jahre
27
0

Zusammenfassung der Ressource

Frage 1

Frage
Material planning is concerned with answering which basic questions (choose 3)?
Antworten
  • Which planning version should the company choose?
  • What materials are required?
  • What is the shortest time required for completing the planning?
  • When are the materials required?
  • How many materials are required?

Frage 2

Frage
The proposals that material planning generates typically are in the form of (choose 2)
Antworten
  • A planning proposal
  • Planned orders
  • A material order list
  • Purchase requisitions
  • Purchase list

Frage 3

Frage
Which of the following are key organizational elements in materials planning? (choose 3)
Antworten
  • Company code
  • Shipping point
  • Plant
  • Storage location
  • Sales area

Frage 4

Frage
Which of the following are master data relevant to material planning? (choose 2)
Antworten
  • Storage location
  • Bills of material
  • Material master
  • Planning version
  • Production version

Frage 5

Frage
Which of the following statements about MRP and MPS are TRUE? (choose 2)
Antworten
  • MPS calculates requirements for all the levels of the BOM
  • MRP calculates requirements only for the first level items in the BOM
  • Both MRP and MPS calculate requirements based on historical data only
  • MRP calculates requirements for all levels of the BOM
  • MPS calculates requirements only for the first level in the BOM

Frage 6

Frage
Which of the following statements best represents what procurement type indicates?
Antworten
  • How a material is produced
  • Vendor's groups
  • All of the ways to procure a material the user will choose from when making a decision
  • Whether a material is produced in house, obtained externally, both or none
  • How a vendor will be chosen in the procurement process

Frage 7

Frage
Requirements that are calculated based on actual and forecasted sales are known as
Antworten
  • Planned independent requirements
  • Customer planned independent requirements
  • Integrated independent requirements
  • Forecast independent requirements
  • Customer independent requirements

Frage 8

Frage
Setup time, processing time, and interoperation time are elements of
Antworten
  • In house production time
  • Goods issue processing time
  • Planned delivery time
  • Goods receipt processing time
  • Planned shipping time

Frage 9

Frage
What does SOP stand for?
Antworten
  • Sales and operations planning
  • Strategic operations planning
  • Sales operations planner
  • Systems operations products
  • Sales operations projects

Frage 10

Frage
The most important reporting tool in material planning is the
Antworten
  • Planning result report
  • MRP list
  • Stock overview
  • Stock/requirements list
  • Strategies list
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Prep Like a Pro with GoConqr's Revision Timetable
Mike Nervo
Chapter 1 GSCM
bball3r76
Chapter 5 GSCM
bball3r76
Chapter 2 & 3 GSCM
bball3r76
Chapter 4 GSCM
bball3r76
Chapter 6 GSCM
bball3r76
Pengaruh Mobile App dari Zalora Terhadap Niat Pembelian Mahasiswa Jurusan Ilmu Komunikasi UPH
triggeredmoons
AS-Level Chemistry: Unit 1:The Atom
Daena Targaryen
20 Study Hacks To Improve Your Memory
jen.sch.ca
Study tips/hacks
Sarah Biswas
Study Plan
Kundai Gee Ganjani