3DX7X Volume 2 URE

Beschreibung

Quiz am 3DX7X Volume 2 URE, erstellt von Evelyn Hernandez am 15/06/2016.
Evelyn Hernandez
Quiz von Evelyn Hernandez, aktualisiert more than 1 year ago
Evelyn Hernandez
Erstellt von Evelyn Hernandez vor fast 8 Jahre
80
2

Zusammenfassung der Ressource

Frage 1

Frage
Which deployment planning process develops predetermined responses to potential crises, determines forces required to achieve objectives, prepares deployment plans, and continually evaluates selected courses of action (COA)?
Antworten
  • Deliberate planning.
  • Crisis action planning.
  • Mobilization planning.
  • Force rotational planning.

Frage 2

Frage
Which War and Mobilization Plan (WMP) volume provides a consolidated reference source for general policies and guidance for mobilization planning and the support of combat forces in time of war?
Antworten
  • Volume 1.
  • Volume 2.
  • Volume 3.
  • Volume 4.

Frage 3

Frage
Who initiates the requirements or deployment sourcing process?
Antworten
  • Air Force Personnel Center (AFPC) Aerospace Expeditionary Forces (AEF) Center.
  • Installation Deployment Officer (IDO).
  • Unit Deployment Monitor (UDM).
  • Joint Staff.

Frage 4

Frage
Which type of Joint Expeditionary Tasking (JET) tasking is a service providing a force or capability in place of another service’s core mission?
Antworten
  • Standard unit type code (UTC).
  • Joint force/capability.
  • In-lieu-of (ILO).
  • Ad hoc.

Frage 5

Frage
Which of these is not an area measured and reported by Status of Resources and Training System (SORTS)?
Antworten
  • Training.
  • Personnel.
  • Facility condition.
  • Equipment condition.

Frage 6

Frage
Which of the following is not a readiness category measured by Air and Space Expeditionary Force Reporting Tool (ART)?
Antworten
  • Training.
  • Personnel.
  • Home station mission.
  • Equipment condition.

Frage 7

Frage
The Governing guidance for Air and Space Expeditionary Force Reporting Tool (ART) reporting is AFI
Antworten
  • 10–201.
  • 10–244.
  • 10–401.
  • 10–403.

Frage 8

Frage
Which document provides detailed information and instructions on Designated Operational Capability (DOC) statements?
Antworten
  • AFI 10–201.
  • AFI 10–244.
  • AFI 10–401.
  • AFI 10–403.

Frage 9

Frage
Who develops logistics details (LOGDETS) to allow for 30 days of sustainment for unit type codes (UTC)?
Antworten
  • Pilot Units
  • Joint Planners.
  • Logistics Readiness Squadron.
  • Each unit is responsible for building its own LOGDET.

Frage 10

Frage
Which is not an initial capability of the open the airbase force module?
Antworten
  • Force protection.
  • Airfield operations.
  • Force accountability.
  • Explosive Ordinance Disposal (EOD).

Frage 11

Frage
The key capabilities for establishing control in the Command and Control module are
Antworten
  • force protection and logistics.
  • intelligence and force protection.
  • secure communications and intelligence.
  • secure communications and force accountability.

Frage 12

Frage
Which force module facilitates integration of open the airbase and command and control force module capabilities to enable the airfield to generate air support to accomplish its assigned mission?
Antworten
  • Robust the airbase.
  • Operate the airbase.
  • Establish the airbase
  • Generate the mission.

Frage 13

Frage
Within how many days after open the airbase does the operate the airbase force module arrive, and when is delivery estimated to be complete?
Antworten
  • 2 days, 7 days.
  • 2 days, 14 days
  • 7 days, 14 days.
  • 14 days, 30 days.

Frage 14

Frage
Which force module contains support forces that would generally not arrive until 30 days after the deployed location is established?
Antworten
  • Generate the mission.
  • Establish the airbase.
  • Operate the airbase.
  • Robust the airbase

Frage 15

Frage
The Contingency Response Wing headquarters is located at
Antworten
  • Scott AFB, IL.
  • Travis AFB, CA.
  • Peterson AFB, CO.
  • Joint Base McGuire-Dix-Lakehurst, NJ.

Frage 16

Frage
What is the typical pay grade of the deployed Contingency Response Group commander?
Antworten
  • O–4
  • O–5.
  • O–6.
  • O–7.

Frage 17

Frage
Which force module supported by Theater Deployable Communications (TDC) is established within 48 hours and supports 50 to150 users in a café environment?
Antworten
  • Command and control.
  • Operate the airbase.
  • Robust the airbase.
  • Open the airbase.

Frage 18

Frage
In the operate the air base module, what is the maximum distance an extended site can be located from the base Network Control Center Deployed (NCC-D)?
Antworten
  • 2 kilometers (km).
  • 4 km.
  • 8 km.
  • 16 km

Frage 19

Frage
Which is not a division of the Air and Space Operations Center?
Antworten
  • Strategy.
  • Combat plans.
  • Combat support.
  • Combat operations.

Frage 20

Frage
Which of the following is categorized as a small unmanned aerial system (UAS)?
Antworten
  • MQ–9 Reaper.
  • RQ-11B Raven
  • MQ–1B Predator.
  • RQ–4B Global Hawk.

Frage 21

Frage
Which of the following is not a career field assigned to engineering installation units?
Antworten
  • 3D0X3, Cyber Surety
  • 3D1X2, Cyber Transport Systems.
  • 3D1X3, RF Transmission Systems.
  • 3D1X7, Cable and Antenna Systems.

Frage 22

Frage
Which Engineering Installation (EI) unit has the only flight assigned that supports a 72 hour rapid response force during crisis providing specialized engineering support in telecommunications and electromagnetic spectrum field analysis?
Antworten
  • 38 Engineering Squadron (ES).
  • 38 Contracting Squadron (CONS).
  • 38 Operations Support Squadron (OSS).
  • 85 Engineering Installation Squadron (EIS)

Frage 23

Frage
All armed forces broadcasting affiliates merged under the American Forces Network (AFN) in
Antworten
  • 1942.
  • 1954.
  • 1988.
  • 1998.

Frage 24

Frage
What Methods and Procedures Technical Order (MPTO) defines project management as the application of knowledge, skills, tools, and techniques to project activities to meet project objectives?
Antworten
  • MPTO 00–33A–1001.
  • MPTO 00–33A–1002.
  • MPTO 00–33A–2001.
  • MPTO 00–33A–2002.

Frage 25

Frage
The five phases of Project Management are initiate,
Antworten
  • funding, execute, close, and control.
  • plan, execute, monitor, and control.
  • plan, execute, close, and control
  • plan, control, close, and support.

Frage 26

Frage
What does the project manager provide in the Initiate Phase?
Antworten
  • Funding.
  • Technical solution.
  • Requirements management plan.
  • Answers, guidance, and education.

Frage 27

Frage
What are the source documents that define a needed cyberspace infrastructure capability called?
Antworten
  • Processes.
  • Priorities.
  • Requirements.
  • Technical solutions.

Frage 28

Frage
Which of these items is contained in the Project Plan?
Antworten
  • Cost management plan.
  • Allied support plan.
  • Technical plan.
  • Material plan.

Frage 29

Frage
The desired outcome, product, or service of a project is referred to as
Antworten
  • the status.
  • a milestone.
  • a deliverable.
  • the final result.

Frage 30

Frage
Which of the following is a type of change request used to correct a portion of the project not meeting requirement specifications?
Antworten
  • Status request.
  • Defect repairs.
  • Preventive action.
  • Corrective action.

Frage 31

Frage
What document marks the end of a project and validates the successful installation of a communications system?
Antworten
  • AFTO Form 745.
  • AFTO Form 747
  • AFTO Form 749.
  • AF Form 1747.

Frage 32

Frage
Exceptions that could prevent a system from meeting specified operational requirements are termed
Antworten
  • major.
  • minor.
  • major and minor.
  • major and critical.

Frage 33

Frage
What is critical to controlling and ensuring the overall project progresses accordingly, regardless of the phase?
Antworten
  • Follow-up.
  • Controlling.
  • Organization.
  • Documenting.

Frage 34

Frage
Changes are requested during a project using an
Antworten
  • AF Form 1146.
  • AF Form 1747.
  • AFTO Form 46.
  • AFTO Form 47.

Frage 35

Frage
Who implements a technical solution for a base?
Antworten
  • Project monitor.
  • Project manager.
  • Communication squadron.
  • Implementing organization.

Frage 36

Frage
What title is given to anyone assigned to assist the program manager in fulfilling program management duties?
Antworten
  • Project monitor.
  • Project manager.
  • Program action officer.
  • Program action monitor.

Frage 37

Frage
The five key stages of the Information Technology Infrastructure Library (ITIL) service life cycle are service strategy,
Antworten
  • service design, service transition, service plan, and continual service improvement.
  • service plan, service transition, service operation, and continual service improvement.
  • service design, service transition, service operation, and continual service improvement.
  • service design, service disposition, service operation, and continual service improvement.

Frage 38

Frage
In what Information Technology Infrastructure Library (ITIL) stage do you determine the underlying principles used for developing the policies, objectives, guidelines, and processes required throughout the Service Life Cycle?
Antworten
  • Service improvement.
  • Service transition.
  • Service strategy.
  • Service design.

Frage 39

Frage
In what Information Technology Infrastructure Library (ITIL) stage do you create the framework to ensure the designed service is effectively and efficiently implemented in the live environment?
Antworten
  • Service design.
  • Service strategy.
  • Service transition.
  • Service operation.

Frage 40

Frage
Engineering support for MAJCOMs is provided by Cyberspace Systems Integrator Tier
Antworten
  • 1.
  • 2.
  • 3.
  • 4.

Frage 41

Frage
Which guidance directs the use of Cyberspace Infrastructure Planning System (CIPS)?
Antworten
  • AFI 33–115.
  • AFI 33-150
  • TO 00–33D–3001.
  • TO 00–33D–3004.

Frage 42

Frage
Which Cyberspace Infrastructure Planning System (CIPS) functional area supports enhancements to current capabilities funded and accomplished at the base level generally in less than 30 days and in the form of a maintenance task order?
Antworten
  • Work orders.
  • Trouble tickets.
  • Infrastructure requirements.
  • Communications and Information Systems Installation Records (CSIR).

Frage 43

Frage
Which of the following funding options does the local communications squadron implement using base level support and resources?
Antworten
  • Organic.
  • Contract.
  • Inorganic.
  • Self-Help.

Frage 44

Frage
Where can you find a list of lead commands or system program offices (SPOs) for each major program?
Antworten
  • TO 00–33A–1001.
  • TO 00-33D-3003
  • Integrated Maintenance Data System (IMDS).
  • Cyberspace Infrastructure Planning System (CIPS).

Frage 45

Frage
As a minimum which of the following is not required to review and validate technical solutions?
Antworten
  • Base Communications Systems Officer.
  • Affected Work Center.
  • Base Civil Engineer.
  • Project Managers.

Frage 46

Frage
Which of the following is not a cause for requirements to be considered special?
Antworten
  • Requires services from outside agencies.
  • Mobility (deployment) equipment.
  • Requires additional manpower.
  • Requires additional funding.

Frage 47

Frage
In which type of plan do writers fully develop the mission, situation, and concept of operations for accomplishing assigned mission in the event of future situation, but only summarize the mobility and logistic requirements?
Antworten
  • Concept Plan.
  • Functional Plan.
  • Supporting Plan.
  • Operational Plan.

Frage 48

Frage
When tasked by the supported combatant commander which type of plan is prepared in support of the contingency plans?
Antworten
  • Concept Plan.
  • Functional Plan.
  • Supporting Plan.
  • Operational Plan.

Frage 49

Frage
If instructions are not detailed enough to warrant a separate annex, information on base functional area support is placed in the
Antworten
  • Programming Plan (PPLAN).
  • Program Action Directive (PAD).
  • Operations Plan (OPLAN) major paragraph.
  • Time Phased Force and Deployment Data (TPFDD).

Frage 50

Frage
What area of the Annex K is used to detail wartime procedures for maintaining the communications systems under contract during peacetime?
Antworten
  • Special Measures.
  • Administration.
  • Assumptions.
  • Logistics.

Frage 51

Frage
Which type of planning meeting identifies civil engineering projects including new construction, renovations, or demolitions of facilities, and relocations of organizations?
Antworten
  • Communications and Information (C&I) Systems Planning Forum.
  • Facilities Utilization Board.
  • Mission Briefings.
  • Informal Meeting.

Frage 52

Frage
The AF Form 1067 is used for defining, validating, and approving requirements for
Antworten
  • safety modifications.
  • T–1 temporary modifications.
  • T–2 temporary modifications.
  • all temporary and permanent notifications.

Frage 53

Frage
Which modification type evaluates, demonstrates, or exercises the technical performance, operational effectiveness, and/or the operational suitability of developmental and/or test materiel (hardware, firmware and software) capabilities?
Antworten
  • Safety modifications.
  • T–1 temporary modification.
  • T-2 temporary modifications.
  • All temporary and permanent modifications.

Frage 54

Frage
Which of the following is not a step required in the modification proposal process?
Antworten
  • Request for action and organization validation
  • Using command and lead command validation.
  • Work center manager certification and approval.
  • Program manager review and approval of technical requirements and solution.

Frage 55

Frage
Support agreements are documented on
Antworten
  • AF Form 1067.
  • DD Form 1067.
  • AF Form 1144.
  • DD Form 1144.

Frage 56

Frage
As a minimum, a support agreement must be reviewed how soon after its effective date?
Antworten
  • 6 months.
  • 1 year.
  • 2 years.
  • 3 years.

Frage 57

Frage
Which of the following is not an exception to the “full and open competition” stipulation of the Competition in Contracting Act?
Antworten
  • Unusual or compelling urgency.
  • Unit commander's interest.
  • National security interests.
  • Sole Source.

Frage 58

Frage
Within how many days of the delivery date must a fully researched, completed requirement for a fixed-price and cost reimbursement contract with a monetary value of $100,000 be submitted to the Base Contracting Office?
Antworten
  • 10 calendar days.
  • 30 calendar days.
  • 35 calendar days.
  • 50 calendar days.

Frage 59

Frage
Which type of contract acquires supplies or services based on direct labor hours at specified fixed hourly rates?
Antworten
  • Sole Source.
  • Firm Fixed Price.
  • Time and Material
  • Performance Based.

Frage 60

Frage
Which type of contract should only be used when it is impossible to accurately estimate the extent or duration of the work or anticipate costs with any reasonable degree of accuracy?
Antworten
  • Sole Source.
  • Firm Fixed Price.
  • Time and Material.
  • Performance Based.

Frage 61

Frage
Which type of contract is permissible when there is only one viable option to satisfy the requirement for supplies or services?
Antworten
  • Sole Source
  • Firm Fixed Price.
  • Time and Material.
  • Performance Based.

Frage 62

Frage
Which of the following is a simplified method of filling anticipated repetitive needs for supplies or services by establishing “charge accounts” with qualified sources of supply?
Antworten
  • Sole Source.
  • Time and Material
  • Indefinite Delivery.
  • Blanket Purchase Agreement

Frage 63

Frage
Who is responsible for establishing and maintaining the installation’s contract Quality Assurance Program?
Antworten
  • Contracting Officer Representative.
  • Functional Director/Commander.
  • Quality Assurance Evaluator.
  • Contracting Office

Frage 64

Frage
Who is responsible for assigning competent and capable functional experts as primary and alternate Contract Officer Representatives (COR)?
Antworten
  • Contracting Officer Representative.
  • Functional Director/Commander.
  • Quality Assurance Evaluator.
  • Contracting Office.

Frage 65

Frage
Who is responsible for providing training to Quality Assurance (QA) personnel and functional directors/commanders?
Antworten
  • Quality Assurance Program Coordinator
  • Contracting Officer Representative.
  • Quality Assurance Evaluator.
  • Unit Contract Monitor.

Frage 66

Frage
Who acts as the unit focal point to provide design support to and/or obtain base Civil Engineering (CE) support?
Antworten
  • Facility Manager.
  • Quality Assurance Evaluator.
  • Functional Director/Commander.
  • Unit plans, planning, and agreements section.

Frage 67

Frage
What must base Civil Engineering (CE) prepare and forward to MAJCOM for review and approval if major or minor construction is required?
Antworten
  • AF Form 332.
  • AF Form 1146.
  • DD Form 1144.
  • DD Form 1391.

Frage 68

Frage
Secretary of Defense and House and Senate Armed Services Committees authorization and appropriation are required for what type of construction projects?
Antworten
  • Major Construction.
  • Minor Construction.
  • All military construction.
  • None, construction projects do not require authorization and appropriation.

Frage 69

Frage
The cost threshold for a minor construction project not using Operation and Maintenance (O&M) funds is
Antworten
  • $750 thousand (K).
  • $1 million (M).
  • $1.5 M.
  • $5 M.

Frage 70

Frage
Who is responsible for inspecting all “real property” on an installation to ensure it meets applicable standards?
Antworten
  • Base Civil Engineering.
  • Gaining Work Center.
  • Contracting Office.
  • Quality Assurance.
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Wirtschaft
Céline Rüegg
Das Leben von Nelson Mandela
AntonS
Abiturvorbereitung (6 Monate)
AntonS
Einstufungstest Französisch B1.2
SprachschuleAktiv
Order-to-Cash Geschäftsprozess
zok42.com
Financial Accounting
zok42.com
Marketing-Mix
Marion Engel
Vetie - Radiologie - Wer wird Veterinär
Fioras Hu
Quiz MS-4.2 Foliensatz II_Teil 1
Bernd Leisen
Vetie: Geflügelkrankheiten 2020 (Matrikel 2015)
Ro F