EMEA Summit Quiz 1

Beschreibung

EMEA Summit Training overview. Quiz from content of Training calls 1-4. MANDATORY completion by all OMLPS after reviewing all training content and prior to Summit.
Lucy Eggleston
Quiz von Lucy Eggleston, aktualisiert more than 1 year ago
Lucy Eggleston
Erstellt von Lucy Eggleston vor fast 8 Jahre
10
0

Zusammenfassung der Ressource

Frage 1

Frage
Select the main principles of JIT
Antworten
  • Pull production, single piece flow, Takt time
  • Levelling, Sequencing
  • Takt time, Poke-Yoke, Sequencing
  • Single piece production, quality, OTD, autonomation

Frage 2

Frage
Select TWO main purposes of Lean Tools
Antworten
  • Impress plant leaders
  • Quantify & track waste
  • Eliminate waste
  • Identify waste
  • Apply Takt to Heijunka

Frage 3

Frage
What are the 3 elements of Standard Work?
Antworten
  • Takt time, Work Sequence, Standard WIP
  • Standard tools, operation routes, engineering drawings
  • Kaizen, empowerment and innovation
  • Heijunka, Jidoka, JIT

Frage 4

Frage
Calculate the TAKT TIME Gross available time per shift (8 hours x 3600 seconds) = 28,800 secs 1 breaktime per shift (30 minutes x 60 seconds) = 1,800 secs Customer demand = 200 units/shift TAKT Time = [blank_start]135[blank_end] secs
Antworten
  • 135
  • 82
  • 153
  • 144

Frage 5

Frage
Creating a shared need, Shaping vision, Mobilising Committment, Making change last & Monitoring Progress are all important processes in which model?
Antworten
  • Moving lines
  • Change Acceleration Process
  • Chaku Chaku
  • Toyota Production System
  • Poke-Yoke

Frage 6

Frage
Monuments can be defined as... (select all that apply)
Antworten
  • Being excessively large for their purpose
  • Drive batch production
  • Being Right Sized Equipment
  • Prohibitively expensive to relocate

Frage 7

Frage
Calculate SWIP Processing time: 25 sec Takt time: 50 sec
Antworten
  • 2
  • 1
  • 25

Frage 8

Frage
Which is NOT a principle of Jidoka?
Antworten
  • Operators must watch over machines
  • Do not produce defects
  • Stop at abnormalities
  • Build intelligence into machines
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Rockar.
Tomas K.
Bend Staff
Kirk Walker
Laborgeräte
Stefan Pw
Faust I
barbara91
Purchase -to -Pay Geschäftsprozess
zok42.com
GPSY ALPS
jennifertittmann
EVA - Vorbereitung MC Teil
hans urst
Säuren und Basen
Maxima Mehner
Vetie Allgemeine Pathologie Altfragen 2016
Nele Unger
Msm-4 Foliensatz 3 Kapitel 3
Rabia Erdogan
Vetie: Geflügelkrankheiten Fragen aus den Vorlesungen
Johanna Tr