Zusammenfassung der Ressource
Frage 1
Frage
Select the main principles of JIT
Antworten
-
Pull production, single piece flow, Takt time
-
Levelling, Sequencing
-
Takt time, Poke-Yoke, Sequencing
-
Single piece production, quality, OTD, autonomation
Frage 2
Frage
Select TWO main purposes of Lean Tools
Antworten
-
Impress plant leaders
-
Quantify & track waste
-
Eliminate waste
-
Identify waste
-
Apply Takt to Heijunka
Frage 3
Frage
What are the 3 elements of Standard Work?
Antworten
-
Takt time, Work Sequence, Standard WIP
-
Standard tools, operation routes, engineering drawings
-
Kaizen, empowerment and innovation
-
Heijunka, Jidoka, JIT
Frage 4
Frage
Calculate the TAKT TIME
Gross available time per shift (8 hours x 3600 seconds) = 28,800 secs
1 breaktime per shift (30 minutes x 60 seconds) = 1,800 secs
Customer demand = 200 units/shift
TAKT Time = [blank_start]135[blank_end] secs
Frage 5
Frage
Creating a shared need, Shaping vision, Mobilising Committment, Making change last & Monitoring Progress are all important processes in which model?
Frage 6
Frage
Monuments can be defined as... (select all that apply)
Antworten
-
Being excessively large for their purpose
-
Drive batch production
-
Being Right Sized Equipment
-
Prohibitively expensive to relocate
Frage 7
Frage
Calculate SWIP
Processing time: 25 sec
Takt time: 50 sec
Frage 8
Frage
Which is NOT a principle of Jidoka?