Test Indirect Material Creation

Beschreibung

Indirect Material Creation in SAP
Gaby Jiménez
Quiz von Gaby Jiménez, aktualisiert more than 1 year ago
Gaby Jiménez
Erstellt von Gaby Jiménez vor etwa 7 Jahre
15
0

Zusammenfassung der Ressource

Frage 1

Frage
All Material Indirect Request must be validated by:
Antworten
  • Coding Brazil
  • AP Maintenance
  • P-Hub Team
  • Brazil Tax Compliance team

Frage 2

Frage
Some of the following information is required in the Worksheet Indirect Material Creation template:
Antworten
  • Description, Material Usage, Material Group
  • Purchasing Group, Plant name, PRODCOM no.
  • Mat. CFOP category, Control Code, Profit Center
  • Valuation Class, Valuation Category, Currency

Frage 3

Frage
T-Code for Masive extension using QTP is MM02
Antworten
  • True
  • False

Frage 4

Frage
Options selected in the image attached for create a new material are correct:
Antworten
  • True
  • False

Frage 5

Frage
Views that do not need to be selected are Basic Data 2, General Plant 3 and Additional Data 1
Antworten
  • True
  • False

Frage 6

Frage
Languages used for MM creation are:
Antworten
  • English, French, Spanish
  • Portuguese, French, English
  • Spanish and English
  • Spanish, English and Portuguese

Frage 7

Frage
If you need to purchase a Router, Z001 must be entered in the Serial no. Profile, at Plant data / stor. 2
Antworten
  • True
  • False

Frage 8

Frage
For attaching the Template form in the MM, you can user T-code MM02
Antworten
  • True
  • False

Frage 9

Frage
Materials must be extended to all Brazil plants, while only one plant requested the creation.
Antworten
  • True
  • False

Frage 10

Frage
A Material Extension by using Quicktest Tool requires:
Antworten
  • Use a separate laptop
  • Synchronize with Kofax Markview
  • Close the session and open a new one in TR2
  • Synchronize with the first SAP session

Frage 11

Frage
For checking that MM has been extended to all required plants, go to T-Code MM03
Antworten
  • True
  • False

Frage 12

Frage
A MM extension can be made manually or by using QTP
Antworten
  • True
  • False

Frage 13

Frage
Additional Data 3 informs the Material Valuation Class
Antworten
  • True
  • False

Frage 14

Frage
Base Unit of measure will be EA for all materials
Antworten
  • True
  • False

Frage 15

Frage
If a template contains incomplete information, you:
Antworten
  • Complete it and create the material
  • Reject the request and replay back to requestor in order to complete it.
  • Search for a similar material, complete and attach the template to MM.
  • Request to user the pendant information in order to complete the MM creation
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Das erste Jahr an der Uni
JohannesK
Verben mit Präpositionen
Gamze Ü
PRINT WS16/17 Uni Wien
Cecilie von Heintze
Vetie - Tierzucht & Genetik - S VI
Fioras Hu
WIRK - 2.0
stelly Welly
Baustoffkunde TU DARMSTADT
Selcuk Karkaoglu
Jour Gesko WS 18/19
Adrienne Tschaudi
Parasitologie 2019
Peter Christian Ponn
AVO & Klinische Pharmakologie 2013
Schmolli Schmoll
Tierseuchenbekämpfung 2017
Birte Schulz
Vetie Parasitologie 2020
Sophia Klemme