LEAN Six Sigma

Question 1 of 80

1

The Lean system that enables us to recognize the standard and any deviation from it, thus corrective actions can be taken immediately is called:

Select one of the following:

  • Hoshin Planning'

  • Kaikaku

  • Visual Management

  • TRIZ

Explanation

Question 2 of 80

1

Successful Control Plans utilize which of the following type action

Select one of the following:

  • Compensating

  • Reactive

  • Preventive

Explanation

Question 3 of 80

1

Select the proper sequence of the steps in the IMPROVE Phase

Select one of the following:

  • Pilot test, Select a solution, Implement full-scale, Generate creative solution idea

  • Implement full-scale, Pilot test, Generate creative solution idea, Select a solution

  • Generate creative solution ideas, Select a solution, Pilot test, Implement full-scale

  • Select a solution, Generate creative solution ideas, Implement full-scale, Pilot test

Explanation

Question 4 of 80

1

In the improved FMEA, select the factor that its rating can be changed only by the customer.

Select one of the following:

  • Failure

  • Severity

  • Occurence

Explanation

Question 5 of 80

1

Kanban is a Lean "Push" device that allows an efficient means to transfer parts from one department to another and automatically reorder products using minimum/maximum inventory levels.

Select one of the following:

  • True
  • False

Explanation

Question 6 of 80

1

Quality at the Source is an approach to quality that places the responsibility for preventing or detecting errors in the hands of suppliers.

Select one of the following:

  • True
  • False

Explanation

Question 7 of 80

1

Select the correct definition for External Elements of Machine Changeover.

Select one of the following:

  • Operations that must be performed while the machine/process is stopped.

  • Operations that can be performed while the machine/process is running.

Explanation

Question 8 of 80

1

The Single Minute Exchange of Die process focuses on converting INTERNAL to EXTERNAL activities and creating more machine run time.

Select one of the following:

  • True
  • False

Explanation

Question 9 of 80

1

The Lean term that refers to using ingenuity to create devices that allow us to do our job 100% error free 100% of the time is

Select one of the following:

  • Kanban

  • Mistake-Proofing (or Poka-Yoke)

  • Kaizen

  • Heijunka

Explanation

Question 10 of 80

1

Calculate the Overall Equipment Effectiveness Index of a machine which is available at 80% of the time, its performance efficiency is 90%, and produces at 100% First Pass Yield.

Select one of the following:

  • 0.90

  • 0.72

  • 0.80

  • 0.89

Explanation

Question 11 of 80

1

Select the proper term for Continuous Incremental improvement.

Select one of the following:

  • Kaikaku

  • Kaizen

  • Muri

  • Poka-Yoke

Explanation

Question 12 of 80

1

Changeover time is the time elapsed between when the first good piece of product A comes off and the first good piece of product B starts.

Select one of the following:

  • True
  • False

Explanation

Question 13 of 80

1

In a value stream that includes a Push system, resources are provided to the consumer based on

Select one of the following:

  • Forecasts or schedules

  • Controlling the flow of resources by replacing only what has been consumed

  • Customer orders

Explanation

Question 14 of 80

1

In Hoshin Planning, the term "Catchball" means communication and socializing ideas.

Select one of the following:

  • True
  • False

Explanation

Question 15 of 80

1

In a value stream that includes a Pull system, resources are provided to the Customer based on

Select one of the following:

  • Forecasts or schedules

  • Controlling the flow of resources by replacing only what has been consumed

Explanation

Question 16 of 80

1

We can decide what type of control chart to use based on: 1) The types of data we have 2) What is counted (Defects, Defectives, Individuals, Rational Subgroups).

We have Variable Data and we count Individuals, what control chart can we use

Select one of the following:

  • X-bar & R chart

  • Individuals and Moving Range chart

  • X-bar and S chart

Explanation

Question 17 of 80

1

We can decide what type of control chart to use based on: 1) The types of data we have 2) What is counted (Defects, Defectives, Individuals, Rational Subgroups).

If we have Attribute Data and we count Defects, what two potential control charts can we use

Select one of the following:

  • c chart or u chart

  • u chart or p chart

  • u chart or np chart

  • c chart or np chart

  • c chart or p chart

Explanation

Question 18 of 80

1

In an FMEA analysis, the severity rating is 9, the occurrence rating is 3, and the detection rating is 3.

Calculate the Risk Priority Number (RPN).

Select one of the following:

  • 15

  • 81

  • 3

  • 9

  • 5

  • 27

Explanation

Question 19 of 80

1

The 5 Whys is a question-asking technique used to explore the root cause of a defect or problem.

Select one of the following:

  • True
  • False

Explanation

Question 20 of 80

1

At what single point in our Value Stream will we schedule production

Select one of the following:

  • The Pacemaker

  • At the End (as near as close to the Customer)

  • At the Beginning (as near as close to the Supplier)

Explanation

Question 21 of 80

1

The place to start introducing Continuous (or SINGLE-PIECE) Flow is usually at the beginning of the "pacemaker" Process in final assembly, from which the product can flow straight through to shipping.

Select one of the following:

  • True
  • False

Explanation

Question 22 of 80

1

When we analyze the Value Stream for improvement opportunities, one typical question is whether we will be producing directly to Shipping, or we will be producing to a finished goods Supermarket.

In order to build directly to Supermarket, select the one factor that is NOT part of the considerations.

Select one of the following:

  • The product is of very high value

  • Customer demand varies widely

  • The product is small enough and cheap enough to store cost effectively

  • The range of finished part numbers requiring changeovers in the Product Family is small

Explanation

Question 23 of 80

1

When we analyze the Value Stream for improvement opportunities, one typical question is whether we will be producing directly to Shipping, or we will be producing to a finished goods Supermarket.

In order to build directly to Shipping, select the one factor that is NOT part of the considerations.

Select one of the following:

  • The product has many custom features

  • The product is of very high value

  • The product is small enough and cheap enough to store cost effectively

  • The product is very bulky, or is subject to spoiling

Explanation

Question 24 of 80

1

Hoshin Planning translates the strategic vision into tangible and measurable objectives for achieving the breakthrough.

Select one of the following:

  • True
  • False

Explanation

Question 25 of 80

1

In order to improve the capability of a process, the FIRST action we must take is:

Select one of the following:

  • Start adjusting the process around

  • Put the process On Target (Center it around the Mean)

  • Reduce the Variation

Explanation

Question 26 of 80

1

Cause and Effects (C&E) Matrix is a tool used to emphasize importance of Customer Requirements.

Select one of the following:

  • True
  • False

Explanation

Question 27 of 80

1

Relations Diagram, Cause & Effect Diagram, Cause and Effects (C&E) Matrix are generally used in Process Mapping.

Select one of the following:

  • True
  • False

Explanation

Question 28 of 80

1

Statistically, we can do many more potentially useful forms of analysis with continuous data versus discrete.

Select one of the following:

  • True
  • False

Explanation

Question 29 of 80

1

Most processes in the world result in a "Normal" Distribution

Select one of the following:

  • True
  • False

Explanation

Question 30 of 80

1

In a Normal Distribution, roughly 95% of the data are within a distance of HOW MANY standard deviations on either side of the mean.

Select one of the following:

  • 1

  • 3

  • 2

  • 6

Explanation

Question 31 of 80

1

Actual Process Variation is made up of the Observed Process Variation and the Measurement Variation.

Select one of the following:

  • True
  • False

Explanation

Question 32 of 80

1

To address actual process variability, the variation due to the measurement system must first be identified and separated from that of the process.

Select one of the following:

  • True
  • False

Explanation

Question 33 of 80

1

Cost of Poor Quality (COPQ) is a major measurement of the hidden factory.

Hidden Factory losses could contribute to what additional percentage of COPQ?

Select one of the following:

  • 15-20%

  • 1-5%

  • 5-10%

  • 10-15%

Explanation

Question 34 of 80

1

Process Mapping is a graphical illustration of the steps of the actual transactional or manufacturing process.

A Rectangle is used to show which of the following on a Process Map?

Select one of the following:

  • Decision Point

  • Start Point

  • Connector

  • Activity

Explanation

Question 35 of 80

1

Process Mapping is a graphical illustration of the steps of the actual transactional or manufacturing process.

A Rhombus is used to show which of the following on a Process Map

Select one of the following:

  • Decision Point

  • Activity

  • End Point

  • Connector

Explanation

Question 36 of 80

1

Waste is "anything other than the minimum amount of equipment, materials, parts, space, and worker's time which are absolutely essential to add value to the product [or service]."

Select the statement that best describes the MOTION type of waste.

Select one of the following:

  • Making more or faster than is needed

  • Extraneous, unnecessary actions or having to make repetitive, unnecessary movements

  • Redoing, Reworking, Repairing, or Scrapping the product or service just provided

  • Excessive movement and handling

  • People, material, and machines waiting for one another

Explanation

Question 37 of 80

1

Workplace Organization or 5S's is:

Select one of the following:

  • Spring Cleaning

  • Only to be done in manufacturing

  • A safe, clean, neat, arrangement of the workplace which provides a specific location for everything, and eliminates anything not required

  • Cleaning the facility every time a customer comes

  • Taking key items away from people which are used frequently

Explanation

Question 38 of 80

1

The phase of 5S (Workplace Organization) when "There should be a place for everything and everything should be in its place" is

Select one of the following:

  • Set in order

  • Sustain

  • Shine

  • Standardize

  • Sort

Explanation

Question 39 of 80

1

Physical Flow is used to give a quick visual representation for the movement of a part or associate (operator).

It is also referred to as a Spaghetti Diagram.

Select one of the following:

  • True
  • False

Explanation

Question 40 of 80

1

The phase of 5S (Workplace Organization) when "We Make it the Culture" is

Select one of the following:

  • Set in order

  • Shine

  • Standardize

  • Sustain

  • Sort

Explanation

Question 41 of 80

1

In Eliyahu M. Goldratt's Theory of Constraint concept, a process is faster than its smallest bottleneck.

Select one of the following:

  • True
  • False

Explanation

Question 42 of 80

1

According to The SIX SIGMA WAY, one of the critical elements to the closed-loop business (Six Sigma) system is finding out which X variables have the most influence on the Y variables.

Select one of the following:

  • True
  • False

Explanation

Question 43 of 80

1

The Problem/Opportunity Definition must include a COMPLETE and DETAILED description of the problem that needs to be solved or a potential opportunity that needs to be exploited, and SHOULD also contain causes or solutions.

Select one of the following:

  • True
  • False

Explanation

Question 44 of 80

1

Having well defined Project Boundaries (BEGIN & END points) is not an important aspect of any Lean Six Sigma project.

Select one of the following:

  • True
  • False

Explanation

Question 45 of 80

1

There are three sequential steps in a process. The first pass yield at each step is as follows:

Step 1: 90%

Step 2: 80%

Step 3: 100%

The Rolled Throughput Yield (RTY) for this process is:

Select one of the following:

  • 270%

  • 90%

  • 72%

  • 100%

  • 80%

Explanation

Question 46 of 80

1

A Value Stream Map is based on engineering standards or old information.

Select one of the following:

  • True
  • False

Explanation

Question 47 of 80

1

Which of the following is NOT an objective of Values Stream Mapping?

Select one of the following:

  • To see across the functional boundaries over which a product's value stream flows

  • To understand the linkage between the information flow and material flow

  • It ties together LEAN concepts and techniques

  • Improves customer response times and customer satisfaction

  • Promotes "cherry picking" and gut feel improvement initiatives

Explanation

Question 48 of 80

1

The Check (Tally) Sheet tool is used to

Select one of the following:

  • Monitor a process against its historical performance

  • Display variable data so that the pattern of variation can be identified

  • Identify relationships between two process variables

  • Provide an easy way to keep track of the frequency of occurrences

Explanation

Question 49 of 80

1

The Histogram tool is used to

Select one of the following:

  • Display variable data so that the pattern of variation can be identified

  • Provide and easy way to keep track of the frequency of occurrences

  • Monitor a process against its historical performance

  • Identify relationships between two process variables

Explanation

Question 50 of 80

1

The Scatter Diagram tool is used to

Select one of the following:

  • Identify relationships between two process variables

  • Provide an easy way to keep track of the frequency of occurrences

  • Display variable data so that the pattern of variation can be identified

  • Monitor a process against its historical performance

Explanation

Question 51 of 80

1

The Control Chart tool is used to

Select one of the following:

  • Monitor a process against its historical performance

  • Identify relationships between two process variables

  • Provide an easy way to keep track of the frequency of occurrences

  • Display variable data so that the pattern of variation can be identified

Explanation

Question 52 of 80

1

A bi-modal or multi-modal distribution is almost always a sign of a special cause of variation in the process or in the data collection technique.

Select one of the following:

  • True
  • False

Explanation

Question 53 of 80

1

Identify which of these flows is NOT part of a Value Stream

Select one of the following:

  • The FLOWCHART

  • The INFORMATION flow

  • The MATERIAL flow

  • The PRODUCTION (TRANSFORMATION) flow

Explanation

Question 54 of 80

1

For a specific Value Stream, the available time per day is 800 minutes and the Customer Demand is 200 units.

Then, the Takt Time at the Pacemaker step is:

Select one of the following:

  • 1000

  • 4

  • 0.25

  • 160,000

  • 600

Explanation

Question 55 of 80

1

The Project Charter should be created as part of the DEFINE phase and remain unchanged for the life of the project.

Select one of the following:

  • True
  • False

Explanation

Question 56 of 80

1

Realistic goals must be SMART.

Select the word which is NOT part of what "SMART" stands for.

Select one of the following:

  • Aggressive

  • Specific

  • Timely

  • Relevant

  • Attainable

  • Measurable

Explanation

Question 57 of 80

1

Brainstorming is a way of generating radical ideas.

Select one of the following:

  • True
  • False

Explanation

Question 58 of 80

1

A Pareto Chart proves 80% of the problems cause 20% of the impact.

Select one of the following:

  • True
  • False

Explanation

Question 59 of 80

1

The Control Plan describes the actions required at each step in the process to assure that all process outputs will be in state of control.

Select one of the following:

  • True
  • False

Explanation

Question 60 of 80

1

Visual Management and Workplace Organization (5S) go hand-in-hand.

Select one of the following:

  • True
  • False

Explanation

Question 61 of 80

1

Force Field Analysis specifically can help us determine if a proposed change can get needed support.

Select one of the following:

  • True
  • False

Explanation

Question 62 of 80

1

The correct sequence of the steps in the Dr. Deming's Cycle is

Select one of the following:

  • Plan, Do, Check/Study, Act

  • Do, Plan, Act, Check/Study

  • Do, Plan, Check/Study, Act

  • Act, Plan, Check/Study, Do

Explanation

Question 63 of 80

1

Which company has had the fastest implementation of Six Sigma

Select one of the following:

  • Raytheon

  • Honeywell

  • Motorola

  • General Electric

  • Toyota

Explanation

Question 64 of 80

1

Six Sigma focuses on both the External and Internal Customers

Select one of the following:

  • True
  • False

Explanation

Question 65 of 80

1

The Six Sigma Improvement Methodology helps us identify and reduce/eliminate sources of variation.

Select one of the following:

  • True
  • False

Explanation

Question 66 of 80

1

Which one of James Womack's of LEAN Principles are we required to conduct FIRST?

Select one of the following:

  • Continuously improve in pursuit of perfection

  • Identify value stream and eliminate waste

  • Make value flow

  • Specify value in the eyes of the customer

  • Allow the customer to pull

Explanation

Question 67 of 80

1

LEAN is an umbrella program to create value to the customer by eliminating waste.

Select one of the following:

  • True
  • False

Explanation

Question 68 of 80

1

Variation characterized as normal "bouncing around" of any process is due to which cause?

Select one of the following:

  • Special or Assignable

  • Common or Controlled

  • None

Explanation

Question 69 of 80

1

In the concept of LEAN, SYNCHRONIZATION means

Select one of the following:

  • Ready capability to adapt to new, different or changing requirements in time and rate

  • The measure or beat of movement

  • A smooth uninterrupted movement

  • Arrange so that one set of elements exactly equals another

  • To cause to operate with exact coincidence

Explanation

Question 70 of 80

1

In the "4P" Model of the Toyota Production System, which statement best describes the PHILOSOPHY of the system?

Select one of the following:

  • The Heart and Soul of the Toyota Way

  • Add Value to Customers and Society

  • The Dynamic of the Toyota Way

  • Eliminate Waste through Flow and Standardization

Explanation

Question 71 of 80

1

In the "4P" Model of the Toyota Production System, which statement best describes the PROCESS of the system?

Select one of the following:

  • The Dynamic of the Toyota Way

  • Eliminate Waste through Flow and Standardization

  • The Heart and Soul of the Toyota Way

  • Add Value to Customers and Society

Explanation

Question 72 of 80

1

In the "4P" Model of the Toyota Production System, which statement best describes the PEOPLE and PARTNERS of the system?

Select one of the following:

  • Add Value to Customers and Society

  • The Dynamic of the Toyota Way

  • The Heart and Soul of the Toyota Way

  • Eliminate Waste through Flow and Standardization

Explanation

Question 73 of 80

1

In the "4P" Model of the Toyota Production System, which statement best describes the PROBLEM SOLVING of the system?

Select one of the following:

  • Add Value to Customers and Society

  • The Heart and Soul of the Toyota Way

  • The Dynamic of the Toyota Way

  • Eliminate Waste through Flow and Standardization

Explanation

Question 74 of 80

1

In the Concept of LEAN, FLEXIBILITY means

Select one of the following:

  • A smooth uninterrupted movement

  • Ready capability to adapt to new, different or changing requirements in time and rate

  • Arrange so that one set of elements exactly equals another

  • To cause to operate with exact coincidence

  • The measure or beat of movement

Explanation

Question 75 of 80

1

The focus of Six Sigma is on improving the MEAN of the process under study

Select one of the following:

  • True
  • False

Explanation

Question 76 of 80

1

There is a significant increase in defects when the Sigma number increases

Select one of the following:

  • True
  • False

Explanation

Question 77 of 80

1

Identify the one criterion that is NOT part of the criteria for Project Selection outlined in The SIX SIGMA WAY.

Select one of the following:

  • Results or Business

  • Certification

  • Organizational Impact

  • Feasibility

Explanation

Question 78 of 80

1

Who is considered the "Father of Six Sigma"

Select one of the following:

  • Bill Smith

  • Mikel Harry

  • Dr. Edward Deming

  • Jack Welch

Explanation

Question 79 of 80

1

Who is considered the Creator of the DMAIC Process and Deployment tactics ("Belts")

Select one of the following:

  • Dr. Edward Deming

  • Jack Welch

  • Mikel Harry

  • Bill Smith

Explanation

Question 80 of 80

1

From the list below, identify the one case when an Affinity Diagram is NOT essential.

Select one of the following:

  • Facts or thoughts are certain

  • Facts or thought need to be organized

  • Unity within a team needs to be created

  • Ideas need to be clarified

Explanation