Intake8 BIM L7

Description

Quiz on Intake8 BIM L7, created by Stanley Chia on 16/03/2016.
Stanley Chia
Quiz by Stanley Chia, updated more than 1 year ago
Stanley Chia
Created by Stanley Chia about 8 years ago
366
4

Resource summary

Question 1

Question
The Integrated Model
Answer
  • is on a single authoring platform
  • is form by linking many models

Question 2

Question
The Federated Model
Answer
  • is on a single authoring platform
  • is form by linking many models

Question 3

Question
Types of CLASHES or ISSUES include:
Answer
  • Lack of detail
  • Not viable/constructible/cannot be installed
  • Inconsistency between trades
  • Code / headroom requirements
  • Structural connectivity
  • Aesthetics
  • Inter-trade interfacing
  • Geometric clash

Question 4

Question
Clashes are detected through:
Answer
  • Actual Modelling
  • Visual Checking
  • Automatic Clash Detection
  • Installing sensors in the building elements

Question 5

Question
Lean Coordination preaches Clash AVOIDANCE instead of Clash DETECTION
Answer
  • True
  • False
Show full summary Hide full summary

Similar

Spanish Adjectives (Describing People)
Niat Habtemariam
GRE Test - Overview
SAT Prep Group
BIOLOGY B1 2
x_clairey_x
Food Technology - Functions of ingredients
evie.daines
English Poetry Key Words
Oliviax
Crime and Punishment Flashcards - Edexcel GCSE Religious Studies Unit 8
nicolalennon12
Globalisation Case Studies
annie
Biology (B2)
Sian Griffiths
GCSE REVISION TIMETABLE
Sonia Christopher
1PR101 2.test - Část 18.
Nikola Truong
Specific Topic 7.2 Timber
T Andrews