Bilateral Aid Case Study - Cahora Bassa Dam

Descripción

Development Gap
aedolphin
Apunte por aedolphin, actualizado hace más de 1 año
aedolphin
Creado por aedolphin hace casi 9 años
145
0

Resumen del Recurso

Página 1

Bilateral Aid Case Study - Cahora Bassa Dam (Mazambique) was built by the Portugese in the 1960s, but civil war prevented completion of it. However, only 1% of the homes have a direct electricity supply, and this HEP scheme has not changed this amount by very much. Most of the power is sold to South Africa, which boosts the economy but does not benefit citizens. It could meet most of the counties power needs.On the whole, the dam has increase the economy of the country, but it could produce more that is currently does. Also, it does not benefit the citizens of the country. River flow is very low because water is being held in reservoirs. The local shrimp industry has been destroyed. The local residents have has their livelihoods destroyed and they have not gained at all from the projects

Mostrar resumen completo Ocultar resumen completo

Similar

SISTEMA REPRODUCTOR HUMANO_2
sistemas.liceova
E S P A Ñ A
Ulises Yo
Elementos de la Inteligencia Emocional
Fernando Durán Z.
Fichas Verbos inglés presente, pasado y participio (131)
JOWANI BELLO MELO
ECOLOGÍA
chinaa25
Vocabularia prueba de aptitud academica - PAA
karemy_rmr
Lectura afectiva básica
Titigz
VOCABULARIO DE INGLÉS
Sandra Molina Garcia
ATMÓSFERA
Ulises Yo
Metodos de separacion de mezclas
elkin parada
Mapa mental Comercio Internacional
Carlos Morales