Risk management - part 4

Descripción

Test sobre Risk management - part 4, creado por Prof. Ruppert el 13/04/2020.
Prof. Ruppert
Test por Prof. Ruppert, actualizado hace más de 1 año
Prof. Ruppert
Creado por Prof. Ruppert hace alrededor de 4 años
437
0

Resumen del Recurso

Pregunta 1

Pregunta
Risk diversification is an important strategy to handle risks: Can you fill in the right terms?
Respuesta
  • shift
  • avoid
  • endure
  • reduce
  • endure
  • avoid
  • shift
  • reduce
  • competitive
  • compensation
  • cooperative
  • internal
  • insurance
  • inacceptable
  • enhance
  • endure
  • extrapolate
  • reinforcements
  • recalls
  • reserves

Pregunta 2

Pregunta
We divide risk measurement into "quantitative" and "qualitative" methods. Can you fill in the right terms?
Respuesta
  • minimum loss
  • maximum loss
  • variation of loss
  • value at risk
  • estimation
  • quick and dirty
  • scoring model

Pregunta 3

Pregunta
FMEA is a risk management method in the product development process. Can you define it?
Respuesta
  • FMEA := Falsification Method in Engineering Analytics
  • FMEA := Failure Method in Engineering Analysis
  • FMEA := Failure Mode and Effect Analysis
  • FMEA := Failure Method and Effect Analytics

Pregunta 4

Pregunta
Within the FMEA method, the calculation and evaluation of the RPN (Risk Priority Number) is crucial. Are you able to check if the following statements are true (or false)?
Respuesta
  • RPN helps the responsible risk management team to prioritize risks.
  • RPN is calculated by multiplying Severity (S), Occurrence (O), and Detection (D).
  • Severity (S): A high severity ranking indicates severe risk.
  • Occurrence (O): A low occurrence rank reflects high failure occurrence potential.
  • Detection (D): A high detection rank reflects high detection capability.
  • Detection (D): A high detection rank reflects low detection capability.
  • Occurrence (O): A high occurrence rank reflects high failure occurrence potential.
  • Severity (S): A low severity ranking indicates severe risk.
  • The maximum value of RPN is 10x10x10 = 1000.

Pregunta 5

Pregunta
Let's bring risk management to the context of strategical procurement. Can you fill in the missing text?
Respuesta
  • complexity
  • globalization
  • volume
  • politics & laws
Mostrar resumen completo Ocultar resumen completo

Similar

Revolución Francesa
Diego Santos
Reported Speech
María Escobar
SISTEMA INMUNOLÓGICO
deisyj_200
Fechas clave de la Historia de España
maya velasquez
Elementos de la música
martha.celorio
ANATOMIA DE LA PELVIS
may RODRIGUEZ
MAPA LITERATURA PRECOLOMBINA
Sharit Romero Bolaño
TRIBUNALES DE JURADO
juanbanogranell
TEORÍAS DEL COMERCIO INTERNACIONAL
Yuleni Fkgeghtrhrqwergw
Pasapalabra Ganado por David Leo
Diego Santos
Mapa mental Comercio Internacional
Carlos Morales