PDD Short Quiz 4

Descripción

ARCH PDD Test sobre PDD Short Quiz 4, creado por M. A. el 05/01/2022.
M. A.
Test por M. A., actualizado hace más de 1 año
M. A.
Creado por M. A. hace más de 2 años
1
0

Resumen del Recurso

Pregunta 1

Pregunta
Which water distribution system may be more susceptible to piping freezing?
Respuesta
  • Upfeed system
  • Downfeed system
  • Both systems
  • None of the above

Pregunta 2

Pregunta
An architecture firm is in the programming phase of a small residential project. Which cost estimating method would be most appropriate to use at this stage?
Respuesta
  • Area method
  • Order of Magnitude
  • Volume method
  • Assembly method

Pregunta 3

Pregunta
Which of the following beams is the heaviest?
Respuesta
  • W 27 x 178, 20’ long
  • W 24 x 104, 40’ long
  • W 21 x 147, 30’ long
  • W 18 x 119, 35’ long

Pregunta 4

Pregunta
Which of the following construction materials has the highest coefficient of linear thermal expansion?
Respuesta
  • Cast Iron
  • Concrete
  • Limestone
  • Brick

Pregunta 5

Pregunta
What is true regarding the simplified parapet detail shown below?
Respuesta
  • Dimension A should be 3” (or higher)
  • Dimension C should be, at least, twice the value of dimension A
  • Dimension B should be 12” (or higher)
  • Dimension C should be 17” (or higher)

Pregunta 6

Pregunta
The thrust of an arch on its abutments is ____________ to the rise.
Respuesta
  • Equivalent
  • Proportional
  • Inversely proportional
  • Equal

Pregunta 7

Pregunta
According to the 2018 IBC, how must a handrail extend beyond the bottom of a single-run ramp?
Respuesta
  • continue to slope a minimum of 12 inches
  • continue to slope a minimum of 12 inches + extend horizontally a minimum of 12 inches
  • extend horizontally a minimum of 12 inches
  • continue to slope a minimum of 11 inches

Pregunta 8

Pregunta
Which sprinkler system should one use in a data center building in Springfield, FL?
Respuesta
  • Wet Pipe
  • Deluge
  • Pre-action
  • Dry Pipe

Pregunta 9

Pregunta
The Wright family wants to build a new museum in Phoenix. This new space is almost identical to another museum built 4 years ago in Chicago by the same Wright Foundation, for a total cost of $3,123,000. If the construction cost indexes of Chicago and Phoenix are 104 and 92, respectively, and assuming an annual inflation of 2%, how much will the new museum cost?
Respuesta
  • $2,990,385
  • $3,821,362
  • $3,372,840
  • $2,983,666

Pregunta 10

Pregunta
Which of the following cable distribution systems would be the most appropriate for an office area where flexibility and the use of displacement ventilation are the most important driving factors?
Respuesta
  • Raised Access Floor system
  • Poke-through system
  • Floor-to-ceiling raceway poles
  • Floor integrated raceway

Pregunta 11

Pregunta
Which of the following Best Management Practices – BMPs – would you recommend for a 4-acre civic center site with large surface-parking areas? Cost and reliability of water-pollutants removal are the driving factors that should take precedent.
Respuesta
  • Stormwater wetlands
  • Wet Ponds
  • Extended detention ponds
  • Multiple Pond System

Pregunta 12

Pregunta
What elements are typically drawn in a reflected ceiling plan? Select all that apply.
Respuesta
  • Doors
  • Pendant luminaires
  • Grid lines
  • Soffit materiality / joints
  • Elevation AFF
  • Electrical drivers

Pregunta 13

Pregunta
Charlie is designing a medium-sized spec office building with a 6” metal deck floor (including finished floor) and a steel structural system with 22” deep beams. The owner’s main wish is to maximize rentable area, but she also requested that the glazing height must be tall enough to provide reasonable daylight penetration. The building is set to have a floor-wide above-ceiling horizontal distribution of services, hidden in a plenum that extends all the way to the façade’s spandrel panels. If the building height is limited to 100’, what is the correct number of floors that satisfies the client’s needs?
Respuesta
  • 5 floors
  • 6 floors
  • 7 floors
  • 8 floors

Pregunta 14

Pregunta
A __________ is designed to resist only the tendency of one member to slide past the other.
Respuesta
  • Shear connection
  • Moment connection
  • Shear wall
  • Fully welded connection

Pregunta 15

Pregunta
Per the 2018 CSI MasterFormat, in which of the following sections are located the Instructions to Bidders?
Respuesta
  • 01 21 16
  • 00 21 13
  • 00 01 15
  • 01 22 16

Pregunta 16

Pregunta
During the construction phase of a multifamily housing project, the construction manager notices that the contract documents do not show control joints on a 500-ft long masonry wall. She decides to send you an RFI. How would you respond to the RFI if the wall is 14-ft tall and has a dozen 5-ft wide windows spaced evenly? Choose 3 that apply.
Respuesta
  • Use one control joint every 200 feet along the unbroken length of the wall
  • Use one control joint per every change in wall thickness
  • Use control joints at all the corners
  • Use one control joint every 100 feet along the unbroken length of the wall
  • Use two control joints per opening (one on each side of the opening)
  • Use one control joint per each wall intersection

Pregunta 17

Pregunta
Which of the following sentences are incorrect? Select 2.
Respuesta
  • The resisting moment of a beam is an internal moment
  • Vertical shearing stress has its maximum value at the outer surfaces
  • The bending moment of a beam is an external moment
  • Bending stress has its maximum value at the surface farthest from the neutral axis
  • The resisting moment of a beam is equal and opposite to its modulus of elasticity
  • Vertical shearing stress has its maximum value at the neutral axis

Pregunta 18

Pregunta
Per the US National CAD Standards, which of the following is not represented by any of the symbols below? Select all that apply.
Respuesta
  • Elevation indicator
  • Boring indicator
  • Elevation indicator, finish
  • Monument indicator
  • Property corner indicator (existing)
  • Temporary ground point indicator (new)

Pregunta 19

Pregunta
If the specifications of a given project are organized per the 2018 CSI MasterFormat, what would you most likely find in Division 09?
Respuesta
  • Gypsum Board Assemblies
  • Operable Wall Louvers
  • Interior Planters
  • Elevator Equipment

Pregunta 20

Pregunta
Select three options that apply. Hardwoods are made from…
Respuesta
  • Seasonal trees
  • Evergreens
  • Deciduous trees
  • Conifers
  • Trees with fast growth
  • Trees with slow growth
Mostrar resumen completo Ocultar resumen completo

Similar

BANDERAS de EUROPA...
JL Cadenas
Tablas de multiplicar
Carmen Giralda
Arte Prerromano
maya velasquez
INGLES PRONOMBRES 73
Pedro Fernández
ORGANIGRAMA
Sebastian Valencia
Clasificación de estrategias didácticas
Karolaim Gutiérr
Salud Pública
Daniela Peña
PARASITOLOGÍA
Juanxito Sardine
Historia del Consejo de Normas Internaciones de Contabilidad
Karime Toledo Estudillo
mapa conceptual
giovanny toro