Pregunta 1
Pregunta
Large quantities of ____ are used to complete the foundations which must support the loads from the boiler and all of the auxillary equipment
Respuesta
-
steel
-
refractory
-
earth
-
cement
Pregunta 2
Pregunta
Tubes for boiler application are either hot-finished or _______drawn depending on the size, tolerance and finish desired.
Pregunta 3
Pregunta
_________ is used as heat protection for personnel and to stop the loss of heat from the boiler internal sections.
Respuesta
-
refractory
-
insulation
-
cladding
-
casing
Pregunta 4
Pregunta
Boiler tubes may be fabricated in a _____ form, or they may be welded
Respuesta
-
rolled
-
seamless
-
seamed
-
cast
Pregunta 5
Pregunta
A final test which is carried out in the manufacturers shop is a hydraulic or hydrostatic test (conducted according to the ASME Code Section I, PW-54) at a pressure of ____times the design pressure
Pregunta 6
Pregunta
Another method used to produce seamless tubes is known as _______
Respuesta
-
cold rolling
-
extrusion
-
polishing
-
casting
Pregunta 7
Pregunta
The boiler tubes themselves are used to support the top_____ in a bottom-supported boiler
Pregunta 8
Pregunta
When a manhole opening is made in a drum or shell, the area becomes _____ due to the amount of metal removed
Respuesta
-
stronger
-
weaker
-
flatter
-
rougher
Pregunta 9
Pregunta
The ASME Code Section ___ Specifies that the size of an elliptical manhole shall not be less than 280 mm by 380 mm or 250 mm by 410 mm.
Pregunta 10
Pregunta
For pressures up to _____ kPa and temperatures up to 454 deg C, handhole covers with gaskets are used and are bolted into place.