Systems 3 - Secondary

Descripción

SRO (Practice Exams) Nuclear Operations Test sobre Systems 3 - Secondary , creado por Lauren Neuburger el 28/10/2016.
Lauren Neuburger
Test por Lauren Neuburger, actualizado hace más de 1 año
Lauren Neuburger
Creado por Lauren Neuburger hace más de 7 años
2
0

Resumen del Recurso

Pregunta 1

Pregunta
Which of the following describes the operation of the Circulating Water System?
Respuesta
  • A. A reduction in Squaw Creek Reservoir temperature decreases main turbine efficiency.
  • B. Starting of a circulating water pump is delayed until the discharge valve is 55 degrees open.
  • C. A pump stop signal is delayed until the discharge valve is 55 degrees from the fully open position.
  • D. Circulating water pump will automatically stop if the discharge valve goes to 35 degrees from the fully open position.
Mostrar resumen completo Ocultar resumen completo

Similar

Using GoConqr to teach French
Sarah Egan
Using GoConqr to teach science
Sarah Egan
Using GoConqr to teach English literature
Sarah Egan
Using GoConqr to teach Maths
Sarah Egan
Using GoConqr to study geography
Sarah Egan
Using GoConqr to study Economics
Sarah Egan
Using GoConqr to study English literature
Sarah Egan
Using GoConqr to learn French
Sarah Egan
Using GoConqr to learn German
Sarah Egan
Using GoConqr to study Maths
Sarah Egan
Using GoConqr to study science
Sarah Egan