Location Relief channel for River Thames in south-east England
Cost £330 million
Opened 2002
Weirs? 5
Reduces risk Maidenhead, Eton and Windsor
Why was it required Thames flood plain - low Protect Windsor Urbanisation caused flooding High property value Take overflow water
Issues - Social Some places have gained, less wealthy settlements have resulted in a higher flood risk
Issues - Economic Most expensive scheme, but after 1 year, weirs were damaged Small businesses will loose money
Issues - Environmental 2014 flooding downstream - fields were damaged and habitats disturbed Concrete weirs are ugly and algae collected behind them