Big Gate

Descripción

Fichas sobre Big Gate, creado por Jake U el 20/09/2015.
Jake U
Fichas por Jake U, actualizado hace más de 1 año
Jake U
Creado por Jake U hace más de 8 años
18
1

Resumen del Recurso

Pregunta Respuesta
Big Gate (word for word) Step 1 Safely dismount the apparatus wearing all PPE carrying a radio
Step 2 Remove the hydrant gate from the rear of the apparatus
Step 3 Wrap 125mm hose around the hyrdant
Step 4 Stand on the hose and signal small gate when ready
Step 5 When the apparatus is stopped or when it is safe to do so, remove steamer cap from hyrdant
Step 6 Inspect the barrel of the hydrant and connect gate
Step 7 Ensure that the drain valve is in open position
Step 8 Radio or signal driver or sector officer that you are ready to turn on the hydrant
Step 9 Open hydrant when ordered by driver or sector officer, close drain valve
Step 10 Gather tools, remove kinks in hose, and report to your officer for reassignment
Mostrar resumen completo Ocultar resumen completo

Similar

Rank Structure Policies
Jake U
Water supply and hydraulics Part 1
Jake U
Water supply and hydraulics part 2
Jake U
Fire behavior (50 cards)
Jake U
Small gate
Jake U
Animales y sus Características
LariSa
Inglés para Selectividad
Diego Santos
Enseñando con Mapas Mentales
Diego Santos
Clase Invertida paso a paso
Diego Santos
Aprender y enseñar con las TIC: expectativa, realidad y potencialidades (César Coll)
Calu Amieva
CUADRO SINÓPTICO DE LOS TRASTORNOS DE LA PERSONALIDAD EN EL AMBIENTE ESCOLAR
Taly Contreras