SAB4#126 Contingency Types (risks)

Descripción

Rita 447-448
anesio.benna
Mapa Mental por anesio.benna, actualizado hace más de 1 año
anesio.benna
Creado por anesio.benna hace alrededor de 9 años
8
0

Resumen del Recurso

SAB4#126 Contingency Types (risks)
  1. Residual Risks
    1. These are the risks that REMAIN after risk response planning. So after you have done all recomended actions, some risks remain. Those residual risks that are passively accepted should be properly documented and reviewed throughout the project to see if their ranking has changed.
    2. Secondary Risks
      1. Any NEW risks CREATED by the implementation of selected risk resonses should also be analyzed as part of risk response planning. The discovery of secondary risks may require aditional risk response planning.
      Mostrar resumen completo Ocultar resumen completo

      Similar

      Los reyes católicos: La integración de las coronas
      maya velasquez
      Revolución Francesa
      Diego Santos
      ÁLGEBRA - De Mapa Mental
      JL Cadenas
      Arte Barroco
      juanmadj
      GED en Español: Todo lo que necesitas saber
      Diego Santos
      La transición a la democracia
      ignaciobll
      Introducción a la Biología
      Denisse Higareda
      Fichas de Inglés - Vocabulario Intermedio 2
      maya velasquez
      EDAD DE LOS METALES
      Roberto Vicente Rodriguez Blanco
      Currículum de la Educación Infantil
      Montserrat Gorrín Méndez
      Ejemplos de Preguntas de Pensamiento Analítico
      Wilson Henao Jimenez