CM 434 Lean Construction

Descripción

Mapa Mental sobre CM 434 Lean Construction, creado por Ruben De Leon el 31/05/2017.
Ruben De Leon
Mapa Mental por Ruben De Leon, actualizado hace más de 1 año
Ruben De Leon
Creado por Ruben De Leon hace casi 7 años
100
0

Resumen del Recurso

CM 434 Lean Construction
  1. LEAN SUPPLY CHAIN MANAGEMENT
    1. Attributes Construction Supply Chain (
      1. Push vs Pull
        1. Push
          1. Materials released on pre-determined schedule
            1. , cost is increased inventory
            2. Pull
              1. Downstream stakeholders
                1. Release triggered by customer(s
                2. Pull w/Bulk Materials
                  1. Kanban
                    1. Customer withdraws from “supermarket
                      1. supermarket then gets replenished by issuing production Kanban; largely visual
                    2. No shop drawings
                      1. Prevents Over Production
                        1. Allows tightly bounded inventory to build up between supplier and customer process
                        2. Material purchased from uniformly produced lots
                          1. → Generally need to have some on-site inventory
                            1. Costs association
                        3. Pull w/ ETO Products
                          1. Requirements
                            1. Lead time
                              1. Look ahead window
                              2. Shop Drawings
                                1. Increase Look Ahead window
                                  1. Easier to perform
                                  2. Reduce Lead time
                            2. Product Types
                              1. Bulk
                                1. MTO
                                  1. ETO
                                  2. Construction Companies generally do not control supply chain
                                    1. Local optimization is limitation of construction
                                      1. Material MGMT Factors
                                        1. space, price, planning (demand) reliability, lead time
                                    2. LEAN DESIGN
                                      1. Pull in Design
                                        1. Target Value Design (TVD)
                                          1. Integrated Design (IDP)
                                            1. Choose-by-advantage (CBA)
                                            2. INTEGRATED PROJECT DELIVERY
                                              1. Attributes
                                                1. Integrate Project Delivery
                                                  1. GMP vs EMP
                                                    1. Contractual Methods for Sharing Pain/Gain
                                                    2. ACTIVITY-BASED COSTING
                                                      1. Two goals of ABC
                                                        1. Mechanisms
                                                          1. Cost Drivers
                                                          Mostrar resumen completo Ocultar resumen completo

                                                          Similar

                                                          Ortografía 1. -SIGNOS DE PUNTUACIÓN-
                                                          Liliana Hernández
                                                          Deeper Learning
                                                          maya velasquez
                                                          Tablas (1) del 0, 1, 2, 3, 4, 5, 6, 7, 8, 9 y 10
                                                          Miguel Greciano
                                                          MAPAS CONCEPTUALES DIGITALES
                                                          Erika Chicaiza
                                                          Inglés
                                                          maya velasquez
                                                          MAPA MENTAL SERVICIO AL CLIENTE
                                                          Belfit Silva
                                                          Contenidos básicos contabilidad
                                                          Maria Fernanda Encalada
                                                          ESTRUCTURAS Y FUNCIONES DEL SISTEMA NERVIOSO
                                                          Paola Andrea Joya Ramirez
                                                          FACTORES QUE INTERVIENEN EN EL MARKETING
                                                          Juan Carlos Pimiento Lancheros
                                                          MAPA CONCEPTUAL DE NETIQUETA
                                                          Hayler Narvaez
                                                          MAPA CONCEPTUAL CAP 1 GERENCIA ESTRATEGICA
                                                          DAVID ARCE