A new bulk system is to be installed at a local hospital; therefore, new wiring from the local panel on the bulk must be run underground to the entry point of the facility. At a minimum, how many sets of wires for each signal are allowable between the initiating device at the bulk and junction box located in the facility?
Selecciona una de las siguientes respuestas posibles: