You have been asked to install and configure a new switch in a customer network. Use the
console access to the existing and new switches to configure and verify correct device
configuration.
You are connecting the New_Switch to the LAN topology; the switch has been partially configured
and you need to complete the rest of configuration to enable PC1 communication with PC2. Which
of the configuration is correct?
Selecciona una de las siguientes respuestas posibles: