Work Breakdown Structure

  1. Outputs

    • Proyect document (updates)
      • Requirements documentation
    • Scope baseline
      • Basis for many other processes like budget, risk, activities definition, procurement
      • Monitored, verified, and controlled throughout the project
      • WBS dictionary
      • WBS
      • Approved detailed scope statement
        • Product scope description
        • Project deliverables
        • Product user acceptance criteria
    • WBS Dictionary
      • Supporting Document for WBS
      • Has detailed description of the compnents in the WBS
        • Code of account identifier
        • Description of work
        • Responsible organization
        • List of schedule milestones
        • Associated schedule activities
        • Resources required
        • Cost estimates
        • Quality requirements
        • Acceptance criteria
        • Technical references
        • Contract information
    • WBS
      • Deliverable-oriented hierarchical descomposition od the work
        • Each descending level represents an increasingly detailed definition of the project work
      • Tied up with
        • Control Account
          • Management control point where scope, cost and schedule are integrated and compared
          • May include one or more work packages
      • Work packages
        • Planned work contained within the lowest level WBS components
        • Can be scheduled, cost estimated, monitored and controlled
        • WBS level at which the cost and activity durations for the work can be reliably, estimated and managed
        • Must be associated with only one control account
      • Executed by the project team
        • To acomplish the project objectives and create the required deliverables
  2. Inputs

    • Project scope statement
    • Requirements documentation
    • Organizational process assets
  3. Definition

    • Process of subdividing project delivverable and proyect work into smaller, more manageable components
  4. Scope

    • Tools and techniques
      • Descomposition
        • Subdivision of project deliverables into smoller, more manageable components until the work and deliverables are defined to the work package level

Información

Descripción
Mapa Mental sobre Work Breakdown Structure, creado por Liam Jaden el 13/09/2017.
Creado por
Liam Jaden
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?