SAB7#43_SCOPE_LEVELS
  1. Activity
    1. PMI considers an activity to be a particular piece of work scheduled for the project.
    2. Work package
      1. The work package is the lowest level on a WBS, the higher levels are used to categorize the work packages.
      2. Control account
        1. Tool that allows for the analysis of work performance data regarding costs, schedule, and scope. Control accounts provide a way to manage and control costs, schedule, and scope at a higher level than the work package.
        Show full summary Hide full summary

        Similar

        Study Plan
        mlanders
        CHEMISTRY C1 6
        x_clairey_x
        OCR AS Biology
        joshbrown3397
        Mind Maps with GoConqr
        Manikandan Achan
        Creating Mind Maps with GoConqr
        Andrea Leyden
        The Circulatory System
        Shane Buckley
        New GCSE Maths required formulae
        Sarah Egan
        The GoConqr Guide to End of Term Exams
        Sarah Egan
        1PR101 2.test - Část 10.
        Nikola Truong
        MAPA CONCEPTUAL DE PROCESOS PSICOLÓGICOS BÁSICOS
        Ximena Paz
        Fractions and percentages
        Karen Jones