SAB7#43_SCOPE_LEVELS
  1. Activity
    1. PMI considers an activity to be a particular piece of work scheduled for the project.
    2. Work package
      1. The work package is the lowest level on a WBS, the higher levels are used to categorize the work packages.
      2. Control account
        1. Tool that allows for the analysis of work performance data regarding costs, schedule, and scope. Control accounts provide a way to manage and control costs, schedule, and scope at a higher level than the work package.
        Show full summary Hide full summary

        Similar

        Geography Quiz - Tectonics
        oscartaylor
        Definitions to Learn in Music
        Rosa Brookes
        Dier (Onderdeel plant&dier toets)
        samanthabirdsall
        CHEMISTRY C1 6
        x_clairey_x
        Physics P1
        WrightW
        Biology B2.1
        Jade Allatt
        maths: ALGEBRA
        katie Dack
        GCSE Maths Symbols, Equations & Formulae
        livvy_hurrell
        Edexcel Additional Science Chemistry Topics 1+2
        Amy Lashkari
        PMP Formulas
        Krunk!
        Accounting I - UNIT 1 Fundamentals
        Kathleen Keller