SAB9#48_Validate_scope

edith.labastida.
Mind Map by edith.labastida., updated more than 1 year ago
edith.labastida.
Created by edith.labastida. about 4 years ago
20
0

Description

Mind Map on SAB9#48_Validate_scope, created by edith.labastida. on 02/20/2016.

Resource summary

SAB9#48_Validate_scope

Annotations:

  •  The Validate Scope process actually involves frequent, planned meetings with the customer or sponsor to gain formal acceptance of deliverables during project monitoring and controlling.
1 Requirements documentation
2 Traceability matrix
3 Deliverables

Annotations:

  • These are verified deliverables, which means they’ve been through Perform Quality Control.
4 Work performance data

Annotations:

  • As per the PMBOK Guide, the work performance data is “the raw observations and measurements identified during activities performed to carry out the project work; e.g. actual cost, actual duration, and percent of work physically completed.”
5 Group decisionmaking techniques
5.1 Once the stakeholders have inspected the deliverables, they’ll need to decide whether or not the deliverables can be accepted
5.2 This is where the stakeholders actually look closely at the what the team did and make sure that every single piece of work was completed.
6 Verified deliverables
6.1 If the team did the work right, then the stakeholders will formally accept the deliverables (which means they do it in writing).
7 Change requests
8 Project document updates
9 Work performance information

Annotations:

  • As per the PMBOK Guide, the work performance information is “the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas; e.g. status of deliverables, and forecasted estimates to complete, etc.”
10 Relationship between validate scope and control quality
Show full summary Hide full summary

Similar

Cell Structure
daniel.praecox
Ionic Bondic Flashcards.
anjumn10
IB Economics SL: Microeconomics
Han Zhang
Conceptos Generales De Robótica
fede ramos
ICT Key Terms Quiz - Part 1
Mr Mckinlay
AS Psychology Unit 1 - Memory
Asterisked
All AS Maths Equations/Calculations and Questions
natashaaaa
med chem 2 final exam
lola_smily
Testing for ions
Joshua Rees
How the European Union Works
Sarah Egan
10 good study habits every student should have
Paras Garg