SAB9#55_Estimate_Activity_Durations
1 one -Point Estimating

Annotations:

  • En el examen veras que se usa frecuentemente "one -Point Estimating" por actividad, ya que con este metodo podemos  mejorar la comprension de como encontrar rutas criticas y dibujar diagramas de red
2 Analogous Estimating (top-Down)
3 Parametric Estimating
3.1 Regression Analysis
3.2 Learning Curve
4 Three-point Estimating
4.1 Triangular Distribution (simple Average)

Annotations:

  • FORMULA  E=(P+O+M)/3P=PessimisticO=OptimisticM= Most LiKely
4.2 Beta Distribution (from the traditional PERT technique).

Annotations:

  • FORMULA  E = (O + 4M + P) / 6 P=PessimisticO=OptimisticM= Most LiKely
4.3 Monte Carlo Analysis

Annotations:

  • Software to simulate out come project based on the three-point Estimating
5 Schedule Management Plan
6 Group Decision-Making Techniques
7 Activity List
8 Activity Attributes
9 Risk Register
10 Activity Cost Estimates
11 Enterprise Environmental Factors (EEF)
12 Organizational Process Assets(OPAS)
13 Expert Judgment
14 Reserve Analysis
15 Activity Duration Estimates
16 Project Documents Updates
17 PADDING
Show full summary Hide full summary

Similar

The Cold War
dottydiva96
C1 - Formulae to learn
Tech Wilkinson
AS-Level Chemistry: Unit 1:The Atom
Daena Targaryen
GCSE Biology AQA
isabellabeaumont
Chemistry
Holly Bamford
GCSE French - The Environment
Abby B
Science Additional B3 - Animal and Plant Cells Flashcards
Stirling v
Business Studies Unit 1
emily.mckechnie
Roles of Education
Isobel Wagner
Repaso de Revalida Enfermeria 2015
Francisco Rivera
Tema 1: La filosofía presocrática
Jocelyn Abigail Garcia Reyna