|
|
Criado por dina hossam
mais de 10 anos atrás
|
|
| Questão | Responda |
| Under & Over applied overhead | 1- Budgeted overhead. 2- Applied Overhead. 3- Actual overhead. the Comparison is between (Applied & Actual) Overapplied overhead: 1-when activity level is higher than expected( volume Variance). 2-Actual overhead is lower than expected. |
Quer criar seus próprios Flashcards gratuitos com GoConqr? Saiba mais.