Tolerate, treat, transfer and terminate
  1. The 4Ts of hazard management
    1. Significant risks
      1. Board level of risk
        1. Risk Treatment
          1. ISO 31000 BS31100
        2. Tolerate risk
          1. Comfortable zone
            1. Legal or regulatory
              1. Detective control
              2. Treat risk
                1. cost effective treatment
                  1. Inherent level
                    1. Corrective control
                    2. Transfer risk
                      1. Insurance
                        1. Joint ventures
                          1. Contractual agreement
                            1. Directive control
                              1. Risk financing
                              2. Terminate risk
                                1. Preventative controls
                                  1. Unacceptable level of risk
                                    1. Elimination may not be possible
                                      1. Public sector
                                      2. Project and Strategic responses
                                        1. The 4As of project management
                                          1. Contractual arrangements
                                            1. contingency plans
                                              1. Avoid high risks
                                              2. The 4E of strategy
                                                1. risk and reward
                                                  1. Joint ventures