SAB7#20_Pre-project conditions
  1. Constraints
    1. Assumptions
      1. Constraints limit the team's options
        1. Boundaries or parameters will the project have to function within
        2. Assumptions that are assumed to be true or reliable
          1. Part or the risk management process
            1. Things we believe but we don't have proof or data
            2. Define project Scope
              1. Those have to be identify and review them for validity during life's project
                1. The Project management plan may need to change

                  Semelhante

                  ELETRICIDADE
                  Alessandra S.
                  8 Benefícios dos Mapas Mentais
                  Alessandra S.
                  Matemática - Triângulos
                  Felipe Perreira
                  Conjunções
                  Andre Medina
                  Conjuntos Numéricos
                  Laura Louis
                  Geometria Plana Triângulo
                  Luiz Antonio Lopes
                  Mapa Conceitual
                  Eduardo Morais
                  Quiz (Interpretação Textual) - T6s
                  Rodrigo de Freit9506
                  Uso da vírgula
                  Kekê Dantas
                  Investigação científica
                  Claudina Quintino
                  PLANEJAMENTO DE LÍNGUA PORTUGUESA 2017 - 1ª ETAPA
                  Adriana Marcia Couto Poletti