O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

Chapter 10: Statistical Quality Control

Cam Ying Luo Inglês

Conteúdo do mapa

Chapter 10: Statistical Quality Control

  1. Introduction

    • Statistical Quality Control
      • use stat tech & sampling to monitor & test Q of goods & services
        • Acceptance Sampling: accept or reject a product
        • Stat process control: if process is operating within acceptable limits
      • Best company: design Q into process, reduce need for inspections
    • Inspection
      • appraisal of goods/services against standards
    • Phases of Q Control
      • least progressive: Acceptance sampling (inspection before & after production)
      • medium progressive: Statistical process control (corrective action during production)
      • most progressive: Continuous improvement & Six Sigma (Q built into process)
    • Stat Process Control Planning process
      • 1. DEFINE important Q characteristics & how to measure
      • 2. For each charact
        • a. determine Q control point
        • b. PLAN
          • i. HOW to inspect
          • ii. HOW MUCH to inspect
          • iii. WHERE centralized or on-site
        • c. plan the corrective action process
    • Inspection
      • How much/How often; Where/When; Centralized vs. On-site
      • Inputs (acceptance sampling) ==> Transformation (stat process control) ==> Outputs (acceptance sampling)
      • WHERE to inspect
        • raw materials & purchased parts
        • before costly operation; before irreversible process; before covering process
        • finished products
      • Inspection costs
        • GRAPH
      • Centralized vs. On-site
        • On-Site
          • immovable product; simple/handled measuring equip; automated inspection
        • In-Lab
          • specialized equip, skilled Q control inspectors; more favourable test env
  2. Statistical Process Control

    • def: stat evaluation of output of a process during production
      • 1. QC steps
      • 2. type of Variations
      • 3. control charts
      • 4. design control charts
      • 5. individual unit & moving range charts
      • 6. control charts for attributes
      • 7. using control charts
    • SPC steps
      • compare to predetermined limits
        • if OUTSIDE limits, stop process & take corrective action
        • if INSIDE limits, continue process
    • Control Chart
      • purpose: monitor process output to distinguish between random & assignable variation
      • def: time ordered plot of stat obtained from ongoing process
        • UCL & LCL define range of acceptable variation
      • Normal Distribution
        • Standard deviation
      • Control limits: dividing lines between random & nonrandom deviations from the process mean (+/- 2SD, 3SD)
        • out of control
        • abnormal V most likely due to assignable causes
        • normal V due to chance
        • Errors
          • Type I error: process has changed when it has not
            • e.g. assignable V is present when only random V is present ==> LOWER than LCL, producers risk
          • Type II error: process has not changed when it has
            • e.g. only random V is present when assignable V is present ==> HIGHER than UCL, consumers risk
          • CHART
    • types of variations
      • random V
        • natural V in output, created by countless minor factors
      • assignable V
        • V whose source can be identified
    • Design control chart
      • 1. determine a sample size
      • 2. obtain 20 to 25 samples
      • 3. establish & graph preliminary control limits
      • 4. plot sample stat values on control chart
      • 5. any points outside CL?
        • NO: assume no assignable cause
        • YES: investigate & correct
    • Control charts for attributes
      • variables: measured
        • sample mean
          • monitor mean of process & x-bar charts
        • sample range
          • monitor process dispersion & R charts
      • sample mean chart
        • FORMULAS & EXAMPLES
        • Alternative method
          • FORMULAS & EXAMPLES
      • sample range control chart
        • FORMULAS & EXAMPLES
      • variables: counted
        • p-chart: monitor proportion of defectives in process:
          • use: observations into 2 categories (e.g. good or bad); multiple samples of several observations each
            • FORMULAS
        • c-chart: monitor # of defects/unit
          • use: # of occurrences per unit of measure can be counted; non-occurrences can't be counted (e.g. breaks per unit of area)
            • FORMULAS
    • Choose right control chart
      • continuous measurement
        • n=1
          • individual unit & moving range charts
        • n>or=2
          • sample mean & range charts
      • discrete measurement
        • 2 types of results can be counted
          • p-chart
        • only occurrences can be counted
          • c-chart
      • QUESTIONS
  3. Process Capability

    • PC indices
      • process is centered ==> Cp
        • FORMULA
      • process is NOT centered ==> Cpk
        • FORMULA
    • EXAMPLES
    • PC analysis
      • < 1 = not capable
        • 1. redesign process; 2. use alternate; 3. more inspection; 4. relax specfication
      • > 1 = better than needed
        • charge more for better quality?
        • Cpk = 0.4253: produce a relatively high # of defects
        • many companies look for > 1.3; six-sigma looks for 2
    • terminology
      • design specifications / aka tolerances: range of acceptable values established by engineering design or customer requirements
      • process variability: natural variability in a process
      • process capability: process variability relative to specification
  4. Six Sigma Quality

Informações

Descrição
Mapa Mental sobre Chapter 10: Statistical Quality Control, criado por Cam Ying Luo em 06-11-2013.
Criado por
Cam Ying Luo
Visualizações
95
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?