SAB11#55_ESTIMATE_ACTIVITIES DURATIONS
  1. ESTIMATE ACTIVITY DURATIONS IS THE PROCESS OF ESTIMATING THE NUMBER OF WORK PERIODS NEEDED TO COMPLETE INDIVIDUAL ACTIVITIES WITH ESTIMATED RESOURCES
    1. ROLE OF THE PROJECT MANAGER IN ESTIMATING IS TO:
      1. 1. PROVIDE THE TEAM WITH ENOUGH INFORMATION TO PROPERLY ESTIMATE EACH ACTIVITY
        1. 2. LET THOSE DOING THE ESTIMATING KNOW HOW REFINED THEIR ESTIMATES MUST BE
          1. 3. COMPLETE A SANITY CHECK OF THE ESTIMATES
            1. 4. PREVENT PADDING.PADDING IS EXTRA TIME OR COST ADDED TO AN ESTIMATE BECAUSE THE ESTIMATOR DOES NOT HAVE ENOUGH INFORMATION
              1. 5. FORMULATE A RESERVE
                1. 6. MAKE ASSURE ASSUMPTIONS MADE DURING ETIMATING ARE RECORDED FOR LATER REVIEW
              2. 1. SHEDULE MANAGEMENT PLAN
                1. 2. ACTIVITY LIST
                  1. 3. ACTIVITY ATRIBUTESS
                    1. 4.ACTIVITY RESOURCES REQUIREMENTS
                      1. 5. RESOURCES CALENDARS
                        1. 6. PROJECT SCOPE STAMENTS
                          1. 7. RISK REGISTER
                            1. 8.RESOURCES BREAKDOWN
                              1. 9. ENTERRPRISE ENVIRONMENTAL FACTORS
                                1. 10. ORGANIZATIONAL PROCESS ASSETS
                                  1. 1. EXPERT JUDGMENTS. GUIDED BY HISTORICAL INFORMATION FROM SIMILAR PROJECTS
                                    1. 2. ANALOGOUS ESTIMATING. TO ESTIMATE COST OF AN ACTIVITY OF A PROJECT OF HISTORICAL DATA. USED WHEN THERE IS LIMITED INFORMATION. GENERALLY NOT AS ACCURATE AS OTHER ESTIMATING TECHIQUES
                                      1. 4. THREE POINT ESTIMATING. TRIANGULAR DISTRIBUTION AVERAGE (P+O+M)/3 P=PESSIMISTIC, O=OPTIMISTIC,M=MAS PROBABLE. TRIANGULAR DISTRIBUTION BETA (P+4M+O)/6 BETA ACTIVITY STANDARD DEVIATION =P-O/6
                                        1. 3.PARAMETRIC ESTIMATING. HISTORICAL RECORDS FROM PREVIOUS PROJECTS. USES AN STATISTICAL RELATIONSHIP BETWEEN HISTORICAL DATA AND OTHER VARIABLES
                                          1. 5. GROUP DECISION-MAKING TECNIQUES. USES BRAINSTORMING, AND DELPHI.
                                            1. 6. RESERVE ANALYSIS . TIMES RESERVES IN THE GLOBAL SCHEDULE F THE PROJECT.
                                              1. 1. ACTIVITY DURATION ESTIMATES
                                                1. 2. PROJECT DOCUMENTS UPDATES

                                                  Semelhante

                                                  COMO SE PREPARAR PARA CONCURSO PÚBLICO
                                                  Alessandra S.
                                                  Matemática - Triângulos
                                                  Alessandra S.
                                                  Figuras de Linguagem
                                                  Mah1408
                                                  Sala de Aula Invertida
                                                  GoConqr suporte .
                                                  7 Tendências Educacionais
                                                  GoConqr suporte .
                                                  SEGUNDO REINADO
                                                  Lucas Villar
                                                  Simulado 12 - Português - 5ºs anos
                                                  prof.garrido
                                                  FCE masterclass Unit 1 - seeing verbs
                                                  Rosana Cabral
                                                  Origem da Vida
                                                  Ariane Freitas
                                                  BENS PÚBLICOS I
                                                  Mateus de Souza
                                                  Nisto Cremos-Prova Capítulo 1-10
                                                  Aldeniz Silva