All of the following are true about reflected ceiling plans EXCEPT?
Shows a view of the ceiling as though it were reflected onto a mirror on the floor
Shows partitions that extend to the ceiling and those that extend through the ceiling
Shows power sources and outlets
Shows ceiling materials
When are mechanical, electrical, and plumbing details developed and coordinated with the interior drawings?
Preliminary design to prevent conflicts
For presentation to show the client that the design solution will "work"
During construction drawings
During design development
Specifications are made most concise by..
Using descriptive specs
Using reference standard specs
Using phrases instead of complete sentences
Avoiding the use of works like a, the, and all
According to standard drawing convention, how would a set of construction drawings produced by an interior designer be organized?
Title and index, fire protection drawings, mechanical, electrical, floor plans, reflected ceiling plans, elevations, details
title and index, architectural, electrical, fire protection, interiors, mechanical, plumbing, structural
Title and index, architectural, interiors, mechanical, electrical, structural, plumbing, fire protection
Title and index, floor plans, reflected ceiling plans, elevations, details, mechanical, electrical, fire protection
Which type of specification is a statement setting criteria and results required for the item being specified?
Performance Specification
Base-bid specification
Reference standard specification
Technical specification
Which of the following is the best way to show finish placement for a project with spaces that have 2 finishes, such as paint and wallcovering?
Schedule a meeting to walk through the finishes with the general contractor
Use wall finish tag symbols that coordinate with the schedule
Use a finish schedule and label the finishes N, S, E, W on the plan
Use a combination of lines, symbols, and elevations on a finish plan
In which type of drawing would you NEVER find furniture?
Reflected ceiling plan
Parti drawing
Section
Elevation
Which plan is sometimes aligned with the electrical and power/communication plans, because the exact location of many of these outlets is directly related?
Accessories
Furniture
Furnishings
Finishes
Which type of schedule would be LEAST likely to be found in a set of interior design drawings?
Window schedule
Millwork schedule
Equipment schedule
Finish schedule
Which type of drawing meets the requirements of either design intent, constraints, function, or constructability?
RCP
Detail drawing
Shop drawing
Which of the following would NOT typical be the responsibility of the interior designer to show on a Reflected Ceiling Plan?
Height of dados and ceiling finishes
Exit signs and sprinkler locations
Full height wall partitions extending through the plenum to the concrete slab above
Switching and circuiting for lighting fixtures
Which of the following would an interior designer put into a schedule?
Hardware
Door/Window
Finish
All of the above
Which is the best lighting system to use in a graphic designer's office if the designer's goal is to provide a flexible and cost effective lighting system that creates a pleasant work environment?
Direct/Indirect
Task/Ambient
Recessed
Indirect
All of the following are true about wood structural systems EXCEPT?
Typically not used in residential construction
Is strong in both compression and tension
Typically used in small commercial construction
Is inexpensive and plentiful
What is NOT allowed in a return-air plenum?
Water supply pipes
Wood blocking
Electrical cable
Fire dampers
Which would you use to separate a building into 2 different construction types?
Fire barrier
Fire partition
2 hour fire rated partition
Firewall
___________ Loads in a building are the permanent material weights of the building components, equipment, and other fixed elements.
Gravity
Dead
Dynamic
Horizontal
Which ceiling system would you use to accommodate acoustic ceiling tile, light fixtures, supply and return air grilles, fire sprinklers, and partitions attached in a consistent, unified way?
Suspended ceiling
demountable ceiling system
Grid ceiling system
Integrated ceiling system
Which of the following is true about solid-core doors?
Used as acoustical barriers
Are made with a variety of core types depending on the functional requirements of the door
All of these are true
Available with fire ratings of 20 minutes, 45 minutes, and 90 minutes
Which of the following would be used to improve the acoustical properties of a wall by isolating the wallboard from rigid attachment to framing?
Resilient channels
Wood furring strips
Insulation
Hat shaped furring channels
Which Is the best method to minimize noise and acoustic problems when planning a space?
Maximize common wall contact between spaces
Use acoustic ceiling tile
Stagger the placement of doorways
Use white noise to mask unwanted sounds
Which of the following would you most likely find on a reflected ceiling plan?
A
B
C
D
Which scale would you typically draw small and complex construction details in?
1/2"=1'0"
3"=1'0"
3/16"=1'0"
1/8"=1'0"
The dotted line in the exhibit shown below allocates:
Full height partitioning
Existing construction to be removed
Demising wall partition
Awning windows
In the exhibit, the top number inside each symbol refers to what in a set of working construction documents?
Indicates the sequential drawing number
Indicates the drawing sheet
Indicates the amount of views are shown
Indicates the number of drawings included
In the following door schedule, the frame of door 108A is made of what material?
Steel
Existing
Aluminum
Hollow metal
What would be the best scale to use if you were drawing a very complex elevation?
1/4"=1:50
1/2"=1:20
1 1/2"=1:100
3"=1:5
Which of the following hatch patterns represent batt insulation in a wall type?
Which of the following scales should NEVER be used for interior design construction drawings?
1"=1'0"
3/4"=1'0"
Water conservation is a primary goal for the current project that you are working on. You could use all of the following to reach this goal EXCEPT..
Use high efficiency toilets
Appropriate plant selection
Increase the use of potable(drinkable) water
Use low flow shower heads and faucets
Choose all that are components of the programming report
Programming concepts
Appendices
Executive summary
Goals and objectives of report
Summary of space needs
Space adjacencies
Code requirements
Design concept
Analysis of existing space
Budget and schedule requirements