Rémi ILLES
Quiz por , criado more than 1 year ago

PP1

159
0
0
Sem etiquetas
Rémi ILLES
Criado por Rémi ILLES mais de 2 anos atrás
Fechar

TEST 1

Questão 1 de 78

1

Based on which object does production with repetitive manufacturing take place?
Please choose the correct answer.

Selecione uma das seguintes:

  • Production order

  • Purchase requisition

  • Process order

  • Planned order

Explicação

Questão 2 de 78

1

The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Subcontracting

  • Stock transfer

  • Vendor consignment

  • In-house production

Explicação

Questão 3 de 78

1

What are the key aspects of SAP S/4HANA?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • SAP S/4HANA is built on SAP HANA

  • SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.

  • SAP S/4HANA has minor changes on data model.

  • SAP S/4HANA increases the data footprint.

Explicação

Questão 4 de 78

1

You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Top of Red

  • Top of Green

  • Top of Red Base

  • Top of Yellow

Explicação

Questão 5 de 78

1

How many files can you connect to a document info record?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • 2

  • 100

  • N

  • 50

Explicação

Questão 6 de 78

1

Which indicator in the material master determines if a material is relevant for advanced planning?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Advanced Planning indicator

  • MRP type of material

  • Individual/collective requirement

  • Availability check of the finished product

Explicação

Questão 7 de 78

1

Which chart types does the tabular planning table provide in SAP S/4HANA?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Orders (dispatched) chart

  • Work center capacities chart

  • Order (pool) chart

  • Capacity requirements chart

Explicação

Questão 8 de 78

1

What are major reasons for the SAP S/4HANA Enterprise Management system?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • It offers analytics with real-time data.

  • It includes CRM, SRM, and APO.

  • It provides a scalable infrastructure.

  • It is based on stable core ERP processes.

Explicação

Questão 9 de 78

1

Which time elements can be reduced by a reduction strategy?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Float after production

  • Move time

  • Goods receipt processing time

  • Queue time

  • Wait time

Explicação

Questão 10 de 78

1

In which of the following master data objects can you define the production order default storage location for a material component?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Work center, in the production supply area

  • Material master of the finished product

  • Routing, in the component allocation

  • BOM, in the item for the material

Explicação

Questão 11 de 78

1

Where do you maintain the work center that represents the production line for repetitive manufacturing?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Routing

  • Repetitive manufacturing profile

  • Production cost collector

  • Production version

Explicação

Questão 12 de 78

1

You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Specify a negative offset time in the strategy profile.

  • Specify a positive planning horizon in the strategy profile.

  • Specify a negative planning horizon in the strategy profile.

  • Specify a positive offset time in the strategy profile.

Explicação

Questão 13 de 78

1

With reference to GR, which statements are correct?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • With GR, the system updates the Delivered Quantity field in the production order.

  • The automatic GR can be posted only with final confirmation. With partial confirmation, automatic GR won't be posted.

  • GR can be manually or automatically posted for an order.

  • Confirmation is the prerequisite step before GR. You can post GR for the quantity you finally confirmed.

  • The Delivery Completed indicator in the Goods Receipt tab page of the production order is set after the GR for the full quantity is posted.

Explicação

Questão 14 de 78

1

The end user is working on a production order but can't post GI for the order, encountering error message Current order status does not allow goods withdrawals. The user then tried to confirm the order and again encountered an error. The Order is not released.
What is the next course of action the user should take?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Try to post GR, and the error may be resolved.

  • First, print the shop floor papers.

  • Delete the order because there are so many errors in it.

  • First, release the order.

Explicação

Questão 15 de 78

1

Which of the following belong to supply chain master data objects?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Vendor

  • Distribution center

  • Product cost collector

  • Account

Explicação

Questão 16 de 78

1

Which statements are correct for MRP Live?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • SAP S/4HANA simplifications eliminated planning file entries, so they aren't relevant for MRP Live.

  • Project planning and make-to-order planning for sales orders aren't optimized for MRP Live.

  • MRP Live creates MRP lists

  • All materials for all the plants can be planned.

Explicação

Questão 17 de 78

1

You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Scheduling working time only

  • Insert operation

  • Squeezing

  • Find slot

Explicação

Questão 18 de 78

1

Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • When alternate resources are used within one operation

  • When multiple production versions are maintained for one product

  • When multiple planned orders exist on one resource

  • When multiple operations are maintained for one product

Explicação

Questão 19 de 78

1

What are key benefits of SAP S/4HANA MRP Live?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Significantly higher data footprint leveraging SAP HANA

  • Runs on any device

  • Simultaneous capacity planning by default

  • Real-time analysis of disruptions in the material flow

Explicação

Questão 20 de 78

1

At which level does detailed scheduling (DS) heuristics plan?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Product

  • Resource

  • Vendor

  • Order

Explicação

Questão 21 de 78

1

How can you create a production order?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Based on a sales order

  • Based on a run schedule quantity

  • Based on a project

  • By planned order conversion

Explicação

Questão 22 de 78

1

What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Landscape transformation

  • System upgrade

  • New implementation

  • System activation

  • System conversion

Explicação

Questão 23 de 78

1

Which materials have a negative quantity in a bill of materials or in a recipe?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Co-products

  • Bulk materials

  • Waste products

  • Continuous flow materials

  • By-products

Explicação

Questão 24 de 78

1

The method in which a production order is credited or debited depends on the variant of cost object controlling (COC). What basis can be used to carry this out?
There are 2 correct answers to this question

Selecione uma ou mais das seguintes:

  • Order-related

  • Cost-related

  • Milestone-related

  • Product-related

Explicação

Questão 25 de 78

1

For planning strategy 40 (planning with final assembly), if you don't maintain the consumption parameters, what happens to the PIRs?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • If no consumption parameters are maintained, the system will check the consumption parameters in the MRP group assigned to the material.

  • The customer requirements will consume the PIRs first in the past and then switch to future.

  • The customer requirements won't consume PIRs.

  • If no consumption parameters are maintained, then the default setting is backwards consumption for 999 days.

Explicação

Questão 26 de 78

1

What does a line hierarchy in repetitive manufacturing represent?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • A production line with a parallel sequence in the routing

  • A production line with an alternative sequence in the routing

  • A production line with prioritized alternative work centers

  • A production line with more than one work center

Explicação

Questão 27 de 78

1

The production order default storage location for components can be defined in which of the following master data objects?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Location field maintained in the work center

  • Routing, in the component allocation

  • Material master of components

  • BOM item details

Explicação

Questão 28 de 78

1

Capacity planning is available in which of the following areas?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Plaint maintenance and customer service

  • Sales and distribution

  • Project systems

  • Materials management

  • Quality management

Explicação

Questão 29 de 78

1

You want to use capacity availability checks for production orders. Which settings have to be made for this?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • An overall profile must be assigned in the checking control.

  • The PRT Availability Check must be set in the checking control.

  • The Relevant for Finite Scheduling indicator must be set.

  • A checking rule must be assigned in the checking control.

Explicação

Questão 30 de 78

1

The __________ is the highest hierarchical level in the SAP S/4HANA application.
Please choose the correct answer

Selecione uma ou mais das seguintes:

  • Storage location

  • Client

  • Plant

  • Company code

Explicação

Questão 31 de 78

1

How many variants can be created for a variant BOM?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Up to 1,000

  • Based on the number of components in the variant BOM

  • 99

  • 1

Explicação

Questão 32 de 78

1

What is the purpose of a reporting point confirmation in repetitive manufacturing?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • To provide timely updates of inventory management for the staged components

  • To determine the work in progress along the production line

  • To stage different components for a production line simultaneously

  • To reduce the total production lead time for along production line

Explicação

Questão 33 de 78

1

What are typical characteristics of make-to-stock production?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Sales order specific procurement

  • Sales order specific stock

  • Unrestricted use stock

  • Planned independent requirements for a finished product trigger its production

Explicação

Questão 34 de 78

1

Which methods can you use achieve a feasible production planning case of capacity constraints?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Execute a new production planning run.

  • Reduce the planning window.

  • Select an alternative mode on a resource.

  • Form optimal sequences to reduce setup times.

  • Adjust the available capacity.

Explicação

Questão 35 de 78

1

Which of the following statements describe the Monitor Work Center Schedules app?
There are 2 correct answers too this question.

Selecione uma ou mais das seguintes:

  • It is a tool for dispatching, rescheduling, or deallocating several bottleneck operations on pacemaker work centers simultaneously in a graphical chart.

  • It is a tool for dispatching, rescheduling, or deallocating operations not only on pacemaker works centers but on all work centers in a defined area of responsibility.

  • It is a tool for dispatching, rescheduling, or deallocating individual bottleneck operations on pacemaker work centers in a graphical chart.

  • It is a tool to analyze the schedule of operations in a graphical chart.

Explicação

Questão 36 de 78

1

What is a typical transportation processing SAP Transportation Management?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting

  • Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting

  • Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting

  • Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting

Explicação

Questão 37 de 78

1

In comparison between classic MRP and MRP Live, which planning mode is removed in MRP Live?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Delete and Recreate Planning Data

  • Adapt Planning Data (Normal Mode)

  • Reexplode BOM and Routing

Explicação

Questão 38 de 78

1

Where do you maintain the duration of a production operation?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Routing

  • Bill of material (BOM)

  • Work instructions

  • Material master

Explicação

Questão 39 de 78

1

What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Source determination for external procurement

  • Calculation of inventory buffer size

  • Long-term production planning

  • Optimization of the production plan

Explicação

Questão 40 de 78

1

For what production type are production orders used?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Period and quantity-oriented production

  • Discrete manufacturing processes

  • Replenishment controlled by control cycles

  • Process manufacturing processes

Explicação

Questão 41 de 78

1

Which of the following production types is based on control cycles?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Kanban

  • Discrete Industries

  • Period and quantity-oriented production

  • Process Industries

Explicação

Questão 42 de 78

1

An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Plant Data

  • MRP Group

  • MRP Profile

  • MRP Controller

Explicação

Questão 43 de 78

1

What does the Material Requirements Planning run trigger?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • The creation of planned requirements

  • The creation of planned independent requirements

  • The creation of planned orders

  • The creation of production orders

Explicação

Questão 44 de 78

1

Which of the following statements are true for make-to-order production?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Planning assemblies can be combined with the Make-to-Order concept.

  • Sales orders are fulfilled by anonymous warehouse stock.

  • Planned independent requirements always trigger final assembly.

  • Sales orders always trigger production.

Explicação

Questão 45 de 78

1

With reference to MTO planning strategies, which of the following statements are correct?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Both A and B are correct.

  • Only answer A is correct.

  • MTO strategies should always be combined with lot-size key EX (lot-for-lot).

  • Rounding values should not be used.

Explicação

Questão 46 de 78

1

In the Schedule Production app, which settings can you make in the planning strategy?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Planning mode (bucket/sequence)

  • Direction (forward/backward)

  • Scheduling control (finite/infinite)

  • Finiteness level (0...1)

  • Fixed pegging (on/off)

Explicação

Questão 47 de 78

1

Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • MRP Live can plan materials with recursive BOMs

  • MRP Live can priorities demand from sales orders

  • MRP Live can propose alternative solutions

  • MRP Live can create production orders automatically

Explicação

Questão 48 de 78

1

Which of following can be created or changed by the PP-DS planning runs automatically or manually?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Purchase requisitions

  • Purchase orders

  • Stock transfer reservations

  • Quality management inspections lots

  • Plant maintenance orders

Explicação

Questão 49 de 78

1

Which of the following functions can be performed when the production order has the status “Created” (CRTD)?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • A user trigger material availability check via mass processing (transaction COHV)

  • A user trigger printing of shop floor paper manually (transaction CO02).

  • A user can trigger material staging via mass processing (transaction COHV).

  • A user can schedule a background job to release production orders (transaction COOIS).

Explicação

Questão 50 de 78

1

Where can you find the latest in version of the Simplification List for SAP S/4HANA?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • SAP Support Portal

  • SAP Help Portal

  • SAP Best Practices Explorer

  • SAP Solution Manager 7.2

Explicação

Questão 51 de 78

1

Which time elements are part of a routing operation?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Queue time

  • Float before production

  • Wait time

  • Pick/pack time

  • Move time

Explicação

Questão 52 de 78

1

What do you need to consider when working with material master numbering in SAP S/4HANA?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Material numbering is defined cross-client.

  • The maximum material number length is 18 for external numbers and 18 for internal numbers.

  • The maximum material length is 40 for external numbers and 18 for internal numbers.

  • Material numbering is defined at client level.

Explicação

Questão 53 de 78

1

In which of the following can you find the main items and tasks of PP/DS planning?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Demand forecasting

  • Cross-location, period-based planning

  • Location-related capacity planning

  • Location-related material requirements planning

Explicação

Questão 54 de 78

1

A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • They can be used for manufacturing with collective orders.

  • They can be created automatically during month end process.

  • They can be used for repetitive manufacturing.

  • They can be applied to make-to-stock production order.

Explicação

Questão 55 de 78

1

What are the options for transferring data to SAP S/4HANA with the SAP S/4HANA Migration Cockpit?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • XML files

  • Temporary tables

  • Staging tables

  • CSV files

Explicação

Questão 56 de 78

1

In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • The presence of firmed planned orders

  • The presence of production orders

  • The viability of the proposed solution

  • The priority of the proposed solution

Explicação

Questão 57 de 78

1

What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Building Blocks

  • Process Flows

  • Test Scripts

  • Solution Package

  • Scope Items

Explicação

Questão 58 de 78

1

Which statement is correct? If you want to perform capacity planning for planned orders, then execute the MRP Live run with:
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Basic date scheduling

  • Lead-time scheduling

  • Finite scheduling

  • Midpoint scheduling

Explicação

Questão 59 de 78

1

Which statements are correct with reference to BOMs?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • The BOM status shows which application areas the BOM can be used in.

  • Net ID should be checked if the component is the same as the higher-level assembly.

  • The system will assign a low-level code for each material in the BOM structure.

  • Phantom assemblies will have the technical type P.

Explicação

Questão 60 de 78

1

When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • High product complexity

  • Low product complexity

  • High product stability

  • Low product stability

Explicação

Questão 61 de 78

1

What is the purpose of collective orders?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • To post production costs on a cost collector instead of the production order

  • To manage production orders for an entire finished production multiple levels

  • To combine order management of co-products and by-products with the main product

  • To post any component withdrawals single back flush with order confirmation

Explicação

Questão 62 de 78

1

When you define the process instruction category, you have to assign a process instruction type to enable the system to process the data accordingly.What are the different process instruction types available?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Process groups

  • Dynamic function calls

  • Universal

  • Calculations

Explicação

Questão 63 de 78

1

Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • BOM status

  • Validity dates

  • Work center hierarchy

  • Task list group number

  • Lot sizes

Explicação

Questão 64 de 78

1

What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • The work center has several individual capacities.

  • Alternative resources are fully occupied.

  • The Change Planning Direct on indicator is set.

  • The planning strategy is infinite.

Explicação

Questão 65 de 78

1

Which SAP solutions can be used for forecasting in Supply Chain Planning?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Integrated Business Planning (IBP)

  • Capacity Requirements Planning (CRP)

  • Material Requirements Planning (MRP)

  • Supply Chain Management (SCM)

Explicação

Questão 66 de 78

1

Which of the following are master data objects for kanban?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Production supply area (PSA)

  • Control cycle

  • Storage location

  • Product cost collector (PCC)

Explicação

Questão 67 de 78

1

Which unit of measure is the stock keeping unit?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Unit of issue

  • Order unit

  • Sales unit

  • Base unit of measure

Explicação

Questão 68 de 78

1

Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Elimination of customer master tables

  • Elimination of output condition tables

  • Elimination of document index tables

  • Elimination of status tables

  • Elimination of LIS tables for rebates

Explicação

Questão 69 de 78

1

What does forecasting in the demand planning cycle include?
There are 3 correct answers to this question.

Selecione uma ou mais das seguintes:

  • One-off events

  • Past quotation quantities

  • Past procurement quantities

  • Past sales order quantities

  • Market intelligence

Explicação

Questão 70 de 78

1

What are the requirements for working with a co-product?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • The indicator in the material MRP data

  • The indicator in the material BOM header

  • The indicator in the routing header

  • The indicator in the material BOM item

Explicação

Questão 71 de 78

1

A configurable material is a material for which different variants are possible. Identify all the planning strategies for configurable materials.
Please select all the correct answers that apply.

Selecione uma ou mais das seguintes:

  • Planning variants with a planning material (Strategy 65)

  • MTO production for material variants (Strategy 26)

  • MTO production with configuration (Strategy 25)

  • Planning variants without final assembly (Strategy 55)

Explicação

Questão 72 de 78

1

Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability.
Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • The checking rule from the business application

  • The ATP category for restricted-use stock

  • The checking group from the material master

  • The checking control for the order type

Explicação

Questão 73 de 78

1

What is the sequence of the five steps of Demand-Driven Replenishment in SAP S/4HANA?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Analytics, buffer positioning, buffer sizing, replenishment planning, replenishment execution

  • Analytics, replenishment planning, replenishment execution, buffer positioning, buffer sizing

  • Analytics, buffer positioning, replenishment planning, replenishment execution, buffer sizing

  • Analytics, buffer positioning, replenishment planning, buffer sizing, replenishment execution

Explicação

Questão 74 de 78

1

When do you maintain the work center that represents the production line for repetitive manufacturing?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Routing

  • Production version

  • Production cost collector

  • Repetitive manufacturing profile

Explicação

Questão 75 de 78

1

You want to create a production order from a planned order. What methods could you use?
There are 2 correct answers to this question.

Selecione uma ou mais das seguintes:

  • Order release

  • Individual conversion

  • Partial conversion

  • Full conversion

Explicação

Questão 76 de 78

1

What does it mean for the production planner when MRP works with infinite capacities?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • MRP creates capacity requirements only if the work center has sufficient capacity.

  • MRP creates capacity requirements without checking the capacity of a work center.

  • MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

  • MRP assigns capacity requirements automatically after the last scheduled order on a work center.

Explicação

Questão 77 de 78

1

The production is based on the forecast for finished product, and the stock is expected to be available in inventory before the customer order. You want to quickly react to the customer requirement by increasing the production.
Which planning strategy should be selected?
Please choose the correct answer.

Selecione uma ou mais das seguintes:

  • Planning strategy 70: Planning at assembly level

  • Planning strategy 50: Planning without final assembly

  • Planning strategy 40: Planning with final assembly

  • Planning strategy 20: Make-to-order production

Explicação

Questão 78 de 78

1

Which are the possible restrictions of MRP Live?
There are 2 correct answers too this question.

Selecione uma ou mais das seguintes:

  • Using the Advanced planning flag enables select materials in embedded PPDS to be treated separately in MRP Live on SAP HANA.

  • Time-phased planning isn't yet supported in MRP Live on SAP HANA.

  • Production version only considers the first BOM alternatives for planning in MRP Live on SAP HANA.

  • Configurable materials aren't supported in MRP Live on SAP HANA.

Explicação