damimgd2u
Quiz por , criado more than 1 year ago

Project Mngt Chapter 5 Test Questions

11752
0
0
damimgd2u
Criado por damimgd2u aproximadamente 8 anos atrás
Fechar

Project Mngt Chapter 5

Questão 1 de 60

1

Scope management is the function controlling a project in terms of its goals and objectives during the execution phase.

Selecione uma das seguintes:

  • T/F

  • Answer: FALSE

Explicação

Questão 2 de 60

1

The statement of work is a detailed narrative description of the work required for a project.

Selecione uma das seguintes:

  • T/F

  • Answer: TRUE

Explicação

Questão 3 de 60

1

A comprehensive statement of work includes an estimate of time and costs, resource requirements, and the scope of the work to be performed.

Selecione uma das seguintes:

  • T/F

  • Answer: TRUE

Explicação

Questão 4 de 60

1

Until a project has gone through work breakdown structure, it is impossible to determine the relationships among the constituent activities.

Selecione uma das seguintes:

  • T/F

  • Answer: TRUE

Explicação

Questão 5 de 60

1

The scope baseline is a document that provides a summary description of each reporting relationship along with a schedule for meetings and reports.

Selecione uma das seguintes:

  • T/F

  • Answer: FALSE

Explicação

Questão 6 de 60

1

A work package may be composed of one or more subdeliverables.

Selecione uma das seguintes:

  • T/F

  • Answer: FALSE

Explicação

Questão 7 de 60

1

A work package may consist of more than one milestone.

Selecione uma das seguintes:

  • T/F

  • Answer: TRUE

Explicação

Questão 8 de 60

1

Work authorization functions as the formal "It's OK to begin work," on the project.

Selecione uma das seguintes:

  • T/F

  • Answer: TRUE

Explicação

Questão 9 de 60

1

The terms lump-sum contract and turnkey contract are interchangeable.

Selecione uma das seguintes:

  • T/F

  • Answer: TRUE

Explicação

Questão 10 de 60

1

A lump-sum contract requires the customer to pay for the full delivered price of the project before any work is done.

Selecione uma das seguintes:

  • T/F

  • Answer: FALSE

Explicação

Questão 11 de 60

1

Which statement about scope management is best?
A) Scope management must take place during the conceptual development, full definition, execution, and termination phases.
B) Project goals don't matter in scope management as long as the budget is not exceeded.
C) Scope management is accomplished in a single step by any one project team member.
D) Scope management can begin once a project hits operational level.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 12 de 60

1

The Scope Management chapter begins and ends with the quote, "It's a dream until you write it down. Then it's…"
A) "… etched in stone."
B) "… a scope statement."
C) "… a documented dream."
D) "… a goal."

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 13 de 60

1

Scope management for a project begins with:
A) a work package.
B) an organization breakdown structure.
C) a statement of goals.
D) a configuration statement.

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 14 de 60

1

Restrictions that affect project development are:
A) problems.
B) constraints.
C) stop-limits.
D) limitations.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 15 de 60

1

The cat-skinning project management team considers the many ways to accomplish their objective before settling on one technique as part of their:
A) information gathering step.
B) need statement step.
C) project objectives step.
D) alternative analysis step.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 16 de 60

1

There were conceivably an infinite number of courses he could take during his final semester, but since he worked 8-5, Jake needed to take night classes. He also needed to ensure that the class was offered at the Edmond campus rather than Midwest City, so he could get home in time for his favorite programs. This whittled down the list of possibilities to Systems Analysis Design and Differential Equations. "Neither of these courses is very attractive. I may have to rethink my priorities," Jake wondered aloud. "The work schedule and wrestling schedule are significant:
A) scope statements."
B) alternatives."
C) constraints."
D) goals."

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 17 de 60

1

Conceptual development for a project concludes with:
A) project objectives.
B) alternative analysis.
C) project delivery.
D) team dissolution.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 18 de 60

1

One consequence of conceptual development that proceeds with a problem that is poorly understood is:
A) problem restatement.
B) cost overruns.
C) problem clarification.
D) task confusion.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 19 de 60

1

Which statement about conceptual development is best?
A) A project goal of "significantly increase computer performance" is better than "improve processing speed 20%" because the team may exceed 20%.
B) It is vital that a best approach to solving a problem be locked in as soon as possible to save analysis time downstream.
C) Conceptual development begins with the process of reducing the project's overall complexity to a more basic level.
D) Project goals should be optimistic to the point of excess.

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 20 de 60

1

The statement of work should contain:
A) information on the key objectives for the project.
B) a brief and general description of the work to be performed.
C) expected project outcomes.
D) All of these are elements of a statement of work.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 21 de 60

1

A statement of work identifies:
A) a need.
B) a project organization.
C) members of the project team.
D) alternatives.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 22 de 60

1

Which of these is NOT a typical element of a statement of work?
A) introduction and background
B) a list of activities needed to complete the project
C) technical description of the project
D) timeline and milestones

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 23 de 60

1

The description and scope section of a statement of work would contain statements regarding:
A) environmental risks.
B) termination of project information.
C) expected benefits.
D) major milestones.

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 24 de 60

1

Expected commitments from other departments in support of the project would most likely be detailed in the:
A) approach section of the SOW.
B) risks and concerns section of the SOW.
C) acceptance criteria section of the SOW.
D) resource requirements section of the SOW.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 25 de 60

1

A testing plan would be outlined in which section of a statement of work?
A) acceptance criteria
B) risks and concerns
C) description and scope
D) approach

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 26 de 60

1

Any measurable, tangible, verifiable outcome, result, or item that must be produced to complete a project or part of a project is a:
A) product.
B) deliverable.
C) tangible.
D) work product.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 27 de 60

1

Which of the following is NOT a project goal criteria?
A) cost
B) schedule
C) team membership
D) review and approval gates

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 28 de 60

1

The organizational structure for the project team, including policies and procedures, is the:
A) work breakdown structure.
B) rules statement.
C) scope statement.
D) management plan.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 29 de 60

1

Which of these scope statement steps creates the all-important bureaucracy for a project?
A) the management plan
B) the work breakdown structure
C) the scope baseline
D) the project goal criteria

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 30 de 60

1

The mountaineers all agreed that their quest to build a bridge between the two peaks of Mount Kilimanjaro was a noble one, but they had no idea how long it would take to complete until they finished their:
A) project goal criteria.
B) work breakdown structure.
C) scope baseline.
D) management plan.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 31 de 60

1

The new Magic Pan coming soon to your area usually serves 20,000 customers in the first year of operation. Construction plans include site selection, foundation, framing, finishing, egg-laying, and chicken acquisition. The scope statement step that determines relationships among these steps, e.g. does the chicken acquisition come before the egg laying, etc., is the:
A) project goal criteria.
B) management plan.
C) work breakdown structure.
D) scope baseline

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 32 de 60

1

Budget and schedule information for each activity in a project is contained in the:
A) project goal criteria.
B) management plan.
C) work breakdown structure.
D) scope baseline.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 33 de 60

1

The final step in the process of systematically laying out all pre-work information is the creation of the:
A) scope baseline.
B) work breakdown structure.
C) management plan.
D) project goal criteria.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 34 de 60

1

The PMBoK definition stating, "a process that sets a project's scope by breaking down its overall mission into a cohesive set of synchronous, increasingly specific tasks," is for the:
A) project plan.
B) work breakdown structure.
C) deliverable statement.
D) scope expansion.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 35 de 60

1

What are work breakdown structure elements that must be completed to conclude the project deliverables?
A) activities
B) tasks
C) work packages
D) milestones

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 36 de 60

1

The lowest level in work breakdown structure contains the:
A) atoms.
B) activities.
C) finite elements.
D) work packages.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 37 de 60

1

The highest level of work breakdown structure is the:
A) project.
B) deliverable.
C) subdeliverable.
D) work package.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 38 de 60

1

The second level in work breakdown structure contains the:
A) projects.
B) deliverables.
C) subdeliverables.
D) work packages.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 39 de 60

1

In order to allocate costs more precisely, a company will assign:
A) bar codes to each activity.
B) activity codes to each subdeliverable.
C) WBS codes to each activity.
D) level 4 codes to each package element.

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 40 de 60

1

Which of these statements about subdeliverables is best?
A) Subdeliverables have durations of their own.
B) Subdeliverables consume resources.
C) Subdeliverables have direct assignable costs.
D) Subdeliverables summarize the outcomes of work packages.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 41 de 60

1

The costs attached to subdeliverables:
A) are the summary of the work packages that support it.
B) are called phantom costs.
C) should be subtracted directly from deliverable costs.
D) are not recoverable unless explicitly stated in the work breakdown structure.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 42 de 60

1

When a supporting document functions as a project control device throughout the project's development, it is not prepared in advance:
A) due to time constraints.
B) as it is a dynamic document.
C) since micromanaging can occur.
D) because control devices are left to project completion.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 43 de 60

1

When work is organized into cost control accounts:
A) the work no longer needs to be tracked by the project manager.
B) the subdeliverables become cost centers instead of profit centers for the project.
C) these are assigned to the units performing project activities.
D) these budgets can then be assigned back to the project manager's department.

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 44 de 60

1

Organizational breakdown structure (OBS) allows companies to:
A) assign the duties of tracking costs to the customer's accounting function.
B) circumvent the onerous task of work breakdown structure.
C) issue a preliminary TPS report.
D) define the work to be accomplished.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 45 de 60

1

A project manager can identify personnel who will be directly responsible for each task in the project's development by using a(n):
A) responsibility assignment matrix.
B) milestone designation chart.
C) Merrill report.
D) work package report.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 46 de 60

1

Project team members can identify who should be notified of task completion status by checking the:
A) control account.
B) linear responsibility chart.
C) statement of work.
D) monthly joint review report.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 47 de 60

1

The step that reflects the formal "go ahead" given to the project to commence once the scope definition, planning documents, and other contractual documents have been prepared and approved is the:
A) go ahead.
B) send off.
C) work authorization.
D) work release.

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 48 de 60

1

In the case of projects developed for external clients, work authorization typically addresses:
A) budget linkage.
B) audit trail establishment.
C) resource requirements.
D) contractual obligations.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 49 de 60

1

All projects are promised in terms of the specific functionality or performance criteria they will meet. The key feature of the contractual documentation that specifies this functionality or criteria is the:
A) contractual requirements.
B) valid consideration.
C) contracted terms.
D) contractual performance.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 50 de 60

1

The exchange that is specified by the contractual documentation documents is:
A) the terms.
B) valid consideration.
C) reciprocity.
D) fair and unencumbered.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 51 de 60

1

The section of the contractual documentation that identifies what are the excusable delays, allowable costs, and criteria for inspection is called the:
A) bylaws.
B) amendments.
C) contracted terms.
D) dissolution factors.

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 52 de 60

1

A project management firm that promises to do everything for a major project and hand over a fully functional, ready-to-use deliverable is performing under a(n):
A) umbrella contract.
B) all-inclusive contract.
C) cost-plus contract.
D) turnkey contract.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 53 de 60

1

Which pair of statements is best?
A) Cost-plus contracts are prone to budget overruns while turnkey contracts are typically underbid by the contractor.
B) Cost-plus contracts are prone to a budget surplus while turnkey contracts are typically underbid by the contractor.
C) Cost-plus contracts are prone to a budget surplus while turnkey contracts are typically overbid by the contractor.
D) Cost-plus contracts are prone to budget overruns while turnkey contracts are typically overbid by the contractor.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 54 de 60

1

Your professor moonlights to make ends meet during the summer months and has a knack for painting houses. You agree to pay $500 over whatever the materials and equipment rental cost for the job and delight in sipping lemonade in the shade watching your poor professor perform under a(n):
A) cost-plus contract.
B) lump-sum contract.
C) time and material contract.
D) fixed wage contract.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 55 de 60

1

The reporting frequency, report recipients, and content required during project execution is laid out by:
A) the organizational breakdown structure.
B) scope reporting.
C) the information system architecture.
D) a need-to-know basis.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 56 de 60

1

Updates on how the project is performing against milestones can be accomplished by issuing a report containing:
A) S-curves.
B) schedule status.
C) earned value.
D) technical performance.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação

Questão 57 de 60

1

An earned value report shows:
A) how much money has actually been spent so far on the project.
B) slippages in performance measures for the work product.
C) the budgeted value of work performed.
D) slippages in time against planned measures.

Selecione uma das seguintes:

  • M/C

  • Answer: C

Explicação

Questão 58 de 60

1

An S-curve report does NOT contain information on:
A) time.
B) cost.
C) budget.
D) quality.

Selecione uma das seguintes:

  • M/C

  • Answer: D

Explicação

Questão 59 de 60

1

Procedures that monitor emerging project scope against the original baseline scope are called:
A) configuration control.
B) design control.
C) trend monitoring.
D) document control.

Selecione uma das seguintes:

  • M/C

  • Answer: A

Explicação

Questão 60 de 60

1

A young professor becomes obsessed with the latest release of Halo and completely loses sight of his research commitment to his colleagues, falling hopelessly behind schedule and consuming 80% of the department's computing budget. Addictive behavior notwithstanding, this sad tale would never have happened had:
A) configuration controls been established.
B) trend monitoring been regularly performed.
C) design controls been appropriately deployed.
D) document control been conducted assiduously.

Selecione uma das seguintes:

  • M/C

  • Answer: B

Explicação