Questão 1
Questão
Overhead cranes with more than one hoisting unit shall have....
Questão 2
Questão
What is the purpose of the "E' (emergency) stop on an overhead crane?
Responda
-
Removes power to hoists only
-
removes power to entire bridge
-
removes power to trolley only
-
removes power to entire crane
Questão 3
Questão
how often does OSHA require a wire rope inspection?
Responda
-
once a shift
-
once a week
-
once a month
-
once a quarter
Questão 4
Questão
Most loads should be rigged to within how many degrees of level?
Questão 5
Questão
According to ASME B30.2, what is the safety factor for rigging?
Responda
-
3 to 1
-
4 to 1
-
5 to 1
-
6 to 1
Questão 6
Questão
According to OSHA frequent inspections shall be performed
Responda
-
monthly to annually
-
daily to monthly
-
hourly to daily
-
daily to weekly
Questão 7
Questão
According to ASME B 30.2 a frequent inspection must be performed by a
Responda
-
competent person
-
designated person
-
qualified person
-
authorized person
Questão 8
Questão
According to ASME B30.2, the maximum twist of the hook can't exceed ?
Responda
-
25 degrees
-
10 degrees
-
15 degrees
-
20 degrees
Questão 9
Questão
When inspecting electrical contacts, what are the signs they are bad?
Responda
-
pitted or burned
-
discolored
-
springs are taut
-
makes sparks
Questão 10
Questão
According to ASME B30.2, what type of fire extinguisher is required for overhead cranes?
Questão 11
Questão
Before leaving an overhead crane unattended, attached loads should be ?
Questão 12
Questão
Before using your hand to steady any load, you should?
Questão 13
Questão
According to OSHA, the rated capacity of all overhead cranes shall be
Responda
-
clearly marked on the side of the crane
-
filed in supervisors office
-
clearly marked on shipping papers
-
filed in crane owners office
Questão 14
Questão
When attaching spreaders to any load, you must keep in mind that,
Responda
-
the higher the spreader angle the greater the tension
-
the lower the spreader angle the lesser the tension
-
the higher the spreader angle the tension will remain the same
-
the lower the spreader angle the greater the tension
Questão 15
Questão
By order of hitch strength, which is correct?
Responda
-
choker, basket, vertical
-
basket, choker, vertical
-
basket, vertical, choker
-
vertical, basket, choker
Questão 16
Questão
According to OSHA, the maximum hook throat opening must not exceed
Responda
-
5% of its original size
-
10% of its original size
-
15% of its original size
-
20% of its original size
Questão 17
Questão
According to OSHA, how many wraps must be left on a hoist drum of an overhead crane with the hook at its lowest position?
Responda
-
1 wrap
-
2 wraps
-
3 wraps
-
4 wraps
Questão 18
Questão
The upper limit switch of all overhead cranes shall be tested every
Questão 19
Questão
Vertical movement of an overhead crane is controlled by the
Responda
-
trolley controller
-
hoist controller
-
bridge controller
-
travel controller
Questão 20
Questão
A swinging load should be controlled by the ?
Responda
-
bridge and trolley controller
-
trolley and hoist controller
-
bridge and hoist controller
-
limit switch and hoist controller
Questão 21
Questão
What should be the first step in a daily inspection of an overhead crane?
Questão 22
Questão
What should be done with an unbalanced load?
Responda
-
lower load to floor
-
sound safety device
-
increase operating speed
-
reduce operating speed
Questão 23
Questão
When making a lift, where should the load block be positioned?
Responda
-
horizontal to the load attachment points
-
horizontal to the center of gravity
-
vertically over the load's center of gravity
-
vertically over the load
Questão 24
Questão
When energizing the crane, the controller should be in what position?
Responda
-
hoisting
-
lowering
-
trolley
-
neutral
Questão 25
Questão
According to A.S.M.E., warning signals shall be given when
Questão 26
Questão
According to A.S.M.E. B30.1, an overhead crane equipped with a lower limit device can have how many wraps left on the drum at its lowest point
Questão 27
Questão
According to OSHA, the proper time to check the hoist brake is
Responda
-
before making a lift
-
during an inspection
-
during the first lift
-
lowering the first lift
Questão 28
Questão
In the event of an emergency, who may give the stop signal?
Responda
-
foreman
-
supervisor
-
anyone
-
safety officer
Questão 29
Questão
According to ASME B30.2, before lifting a load the hoist ropes will be free of kinks and
Questão 30
Questão
The purpose of the upper limit switch is to
Responda
-
limit bridge travel
-
limit trolley travel
-
limit hoist travel
-
limit upper span
Questão 31
Questão
According to OSHA, the operator shall not hoist loads above
Responda
-
open areas
-
personnel
-
equipment
-
walkways
Questão 32
Questão
Where should the hook block be positioned for shutdown?
Questão 33
Questão
Whose responsibility is it to select the proper rigging equipment
Responda
-
supervisor
-
plant manager
-
plant safety
-
operator
Questão 34
Questão
Before making a lift the operator must first determine
Responda
-
placement of rigging
-
weight of load
-
placement of tag line
-
attachment points
Questão 35
Questão
a wire rope designated as 6 X 19 has
Questão 36
Questão
What is the safe working load of a wire rope defined as ?
Responda
-
breaking strength times safety factor
-
breaking strength divided by safety factor
-
breaking strength plus safety factor
-
breaking strength subtracted from safety factor
Questão 37
Questão
The vertical movement of an overhead crane is controlled by the
Questão 38
Questão
swinging loads can be controlled by the use of the
Responda
-
bridge or trolley controls
-
bridge or hoist controls
-
trolley or hoist controls
-
limit switch and hoist controls
Questão 39
Questão
first step in daily inspection would be to check
Responda
-
catwalk area and guardrails
-
crane cab and trolley brakes
-
controller position in neutral
-
main switch locked in off position
Questão 40
Questão
If the load does not balance properly after being raised what steps should be taken
Questão 41
Questão
When making a lift what position should the trolley be in?
Responda
-
vertical to the load
-
horizontal to the load
-
depends on load location
-
makes no difference
Questão 42
Questão
What position should all controllers be in when energizing
Responda
-
the raised postion
-
the lowered position
-
either raised or lowered
-
either neutral or off
Questão 43
Questão
ASME B.30.2 states that the minimum number of wraps one the hoisting drum should never be less than _______ unless a lower limit device is provided
Responda
-
1 wrap
-
2 wraps
-
3 wraps
-
4 wraps
Questão 44
Questão
Before leaving a crane cab unattended any attached load shall be
Responda
-
suspended
-
vertical
-
horizontal
-
landed
Questão 45
Questão
What is the purpose of the upper limit switch? (the only one required by OSHA)
Questão 46
Questão
When any machinery or apparatus is found to be defective or inoperative on the crane the person discovering this condition should
Questão 47
Questão
When loss of power occurs the crane operator should
Responda
-
wait for power to be restored
-
install larger fuses
-
put controllers in the off position
-
attempt to locate the problem
Questão 48
Questão
A floor weight limitation is posted at 700 pounds per square foot maximum. Before lowering a load down onto this floor that is calculated at 900 pounds per square foot. What must be done?
Responda
-
lower the load at slower rate
-
install cribbing to increase surface bearing area
-
install cribbing to decrease surface bearing area
-
install cribbing to maintain the same amount of surface bearing area
Questão 49
Questão
The term lay length when referring to wire rope if equal to
Questão 50
Questão
According to OSHA rated capacity rigging charts will aid you when ?
Responda
-
determining the weight of the load
-
determining the load's center of gravity
-
determining the rigging equipment manufacturer date
-
determining if the rigging equipment meets all criteria establish by law
Questão 51
Questão
If possible always try to keep horizontal sling angles
Responda
-
less than 30 degrees
-
greater than 30 degrees
-
less than 60 degrees
-
greater than 60 degrees