Questão 1

Questão
What constitutes the largest use of energy in buildings in the United States?
Responda
  • Space cooling
  • Space heating
  • Electric lighting
  • Water heating

Questão 2

Questão
Green building emphasizes using what type of design process?
Responda
  • Linear
  • Multistage
  • Integrative
  • Tiered

Questão 3

Questão
What are the three dimensions of sustainability often described as the triple bottom line or the three-legged stool?
Responda
  • Economic prosperity, environmental stewardship, and social responsibility
  • Economic theory, cultural agendas, and global variety
  • Energy efficiency, water efficiency, and indoor environmental quality
  • Government standards, building codes, and building practices

Questão 4

Questão
Life-cycle assessment is used to determine the ___?
Responda
  • Balance of natural cycles such as the hydrologic cycle
  • Environmental aspects and potential impacts of a given product
  • Life span of a building and its components
  • Environmental systems affected over the life of a building

Questão 5

Questão
When is the best time to incorporate an integrative approach for a building project
Responda
  • Predesign
  • Schematic design
  • Design development
  • Construction documents
  • Construction

Questão 6

Questão
Credit weightings are based on ___?
Responda
  • Relative costs and benefits of each credit
  • Environmental impacts and human benefits
  • Carbon footprint and embodied energy
  • Expected environmental performance

Questão 7

Questão
Implementation of green building strategies such as daylighting, passive cooling, high-efficiency mechanical systems, and stack ventilation contributes to what type of cost savings?
Responda
  • Reduced first costs
  • Reduced maintenance costs
  • Reduced life-cycle costs
  • Reduced end-of-life costs
  • Reduced imminent costs

Questão 8

Questão
The installation of low-flow faucet aerators at hand washing stations will result in which of the following? (Choose two)
Responda
  • Reduced hours of occupancy
  • Reduced energy use
  • Reduced water use
  • Increased occupant productivity
  • Reduced stormwater runoff

Questão 9

Questão
How many levels of LEED Professional Accreditation are available?
Responda
  • 6
  • 4
  • 1
  • 3

Questão 10

Questão
Which of the following is a primary responsibility of the U.S. Green Building Council?
Responda
  • Developing the LEED Professional Accreditation exams
  • Administering LEED project reviews and certification processes
  • Establishing continuing education requirements for LEED Accredited Professionals
  • Providing and developing LEED-based education and research programs

Questão 11

Questão
A development company is designing a seven-story, 100,000-square-foot condominium building. The developers will be responsible for completing the interior finishes, but will not be supplying furniture or appliances. What LEED rating system would be most relevant for this project type?
Responda
  • LEED for New Construction and Major Renovation
  • LEED for Homes
  • LEED for Commercial Interiors
  • LEED for Core & Shell

Questão 12

Questão
The carbon overlay in LEED is used for what purpose?
Responda
  • To prioritize the relative impact of credits on greenhouse gas emissions
  • To identify the major contributors to environmental degradation
  • To quantify the relative impact of different energy efficiency measures
  • To rank the feasibility of various green building strategies

Questão 13

Questão
What is the procedure required to achieve LEED certification?
Responda
  • Register a project with GBCI, pay applicable review fees, and submit documentation
  • Retain a LEED professional, register the project, and pay applicable fees
  • Submit documentation, obtain a preliminary rating, and pay applicable certification fees.
  • Register the project with GBCI, demonstrate environmental innovation, and pay applicable fees.

Questão 14

Questão
What is the earliest point at which a LEED for Schools project can be certified?
Responda
  • After one year of occupancy and after all commissioning activities are complete
  • After the project team has registered and submitted all project specifications
  • After final punch-list items are complete and all review fees are paid
  • After building completion and once all submittals and clarifications are reviewed

Questão 15

Questão
The licensed-professional exemption is used by a project team to do what?
Responda
  • Achieve continuing education credit for primary team members.
  • Capture federally available tax credits for the project.
  • Bypass otherwise required submittals.
  • Streamline the permitting process in many jurisdictions.

Questão 16

Questão
A team is unclear whether a proposed project strategy will achieve a specific LEED credit the team is pursuing. The team decides it should submit a Credit Interpretation Request (CIR). Prior to submitting the CIR for review, which strategies should the project team consider (select three)?
Responda
  • Review the credit intent and self evaluate whether the strategy meets that intent.
  • Contact LEED customer service to determine whether the CIR is likely to be successful.
  • Review past CIRs to see whether this issue has been addressed in the past.
  • Consult the appropriate LEED reference guide for a more detailed explanation.
  • Contact its local chapter to receive a preliminary ruling.
  • Identify other issues to address within the CIR.

Questão 17

Questão
What metric is the best indicator of transportation impacts associated with a building project?
Responda
  • Street grid density
  • Availability of public transportation
  • Vehicle miles traveled
  • Parking capacity

Questão 18

Questão
Decreasing impervious surfaces on a project site will ___?
Responda
  • Decrease percolation rates
  • Reduce potable water usage
  • Reduce stormwater runoff
  • Eliminate sewage piping

Questão 19

Questão
What is acknowledged as one of the greatest threats to surface-water quality?
Responda
  • Draining of local aquifers
  • Recreational boating
  • Rainwater harvesting
  • Nonpoint-source pollution

Questão 20

Questão
A project that specifies exterior surfaces with high solar reflectance index (SRI) values is contributing to which environmental benefit?
Responda
  • Reduced heat island effect
  • Support for renewable energy
  • Protection of the dark-sky initiative
  • Improved stormwater quality

Questão 21

Questão
A project is in the pre-design phase and the site has already been selected. The team wants to increase the open space on the project site. Which strategies should it consider (select two)?
Responda
  • Increase the floor-to-area ratio of the building.
  • Implement a construction activity pollution plan.
  • Use pervious paving materials for the parking area.
  • Locate parking underground.
  • Select drought-tolerant plantings.

Questão 22

Questão
An industrial facility is located in an area with no public transportation. In which ways can the project team reduce the project’s transportation impact (select two)?
Responda
  • Provide a carpooling incentive to building occupants.
  • Upgrade the company cars to hybrids.
  • Install solar panels to power parking lot lighting.
  • Provide occupants a fuel subsidy.

Questão 23

Questão
A project adjacent to protected forestland that is home to a variety of plant and animal life wants to reduce the impact of its site lighting. To achieve this, the project team installs exterior lighting that ___?
Responda
  • Provides for tasteful, decorative appearance.
  • Reduces the need for night-time security.
  • Adequately illuminates the night sky.
  • Does not trespass onto adjacent properties.

Questão 24

Questão
Prior to final selection of the project site, the owner and design team should confirm that the site is ___?
Responda
  • Compliant with the green design criteria
  • Compliant with the sustainable building codes
  • Previously undeveloped
  • Removed from other development

Questão 25

Questão
What is the primary standard used to establish the baseline case for indoor water use?
Responda
  • The Clean Water Act
  • Energy Policy Act of 1992
  • ASHRAE Standard 90.1
  • National Environmental Policy Act

Questão 26

Questão
What is reduced when a project uses reclaimed water in its cooling towers?
Responda
  • Potable water use
  • Process water use
  • Indoor plumbing water use
  • Nonpotable water use
  • Irrigation water use

Questão 27

Questão
How can potable water use for irrigation be reduced or eliminated (select two)?
Responda
  • Install submeters
  • Select locally adapted plants
  • Increase the coverage of turf grass
  • Use organic fertilizers
  • Select noninvasive plants

Questão 28

Questão
Wastewater from toilets and urinals is known as ___?
Responda
  • Brownwater
  • Potable water
  • Blackwater
  • Graywater
  • Drinking water

Questão 29

Questão
Nonpotable water is typically suitable for which of the following uses (select two)?
Responda
  • Ice making
  • Drinking
  • Showers
  • Toilet flushing
  • Irrigation

Questão 30

Questão
What is the baseline water use for water closets?
Responda
  • 0.8 gallons per flush
  • 1.0 gallons per flush
  • 1.6 gallons per flush
  • 3.2 gallons per flush

Questão 31

Questão
Municipally supplied reclaimed water is considered ____?
Responda
  • Free water
  • Nonpotable water
  • Process water
  • Blackwater

Questão 32

Questão
Process water use can be reduced by ____? (Choose two)
Responda
  • Installing submeters
  • Installing low-flow showerheads
  • Using high-efficiency irrigation technologies
  • Using ENERGY STAR-certified clothes washers

Questão 33

Questão
What is the first step a project team should consider when trying to save energy?
Responda
  • Use on-site renewable energy.
  • Reduce energy demand.
  • Adopt energy efficiency measures.
  • Install submetering equipment.

Questão 34

Questão
What strategy is being used for a project design that orients windows to allow the building to be warm in the winter, stay cool in the summer, and capture daylight?
Responda
  • High-performance mechanical systems
  • Efficiencies of scale
  • Energy simulation modeling
  • Passive design concepts

Questão 35

Questão
To what do renewable energy certificates (RECs) refer?
Responda
  • On-site photovoltaic systems
  • Off-site renewable energy purchases
  • Market-generated wind power
  • Stock in utility providers

Questão 36

Questão
One of the most cost-effective ways to ensure optimal ongoing energy performance is to ___?
Responda
  • Commission building systems
  • Upgrade mechanical systems
  • Install renewable energy systems
  • Maintain trees and landscaping features

Questão 37

Questão
Refrigerants are necessary as part of the refrigeration cycle often used to cool buildings. However, the benefits of their use should be considered against their potential for adverse environmental impacts. These direct impacts are quantified by which metrics? (Choose two)
Responda
  • Global warming potential
  • Energy use potential
  • Ozone depletion potential
  • Soil contamination potential
  • Air pollution potential

Questão 38

Questão
A project team is selecting the HVAC system for the tenant space. Which primary factors should be considered to minimize the environmental impact of the system (select two)?
Responda
  • First cost
  • Expected life
  • Energy performance
  • Lead time

Questão 39

Questão
Energy use associated with office equipment, kitchen cooking, and escalators is known as ___?
Responda
  • Regulated energy
  • Exempt energy
  • Process energy
  • Secondary energy

Questão 40

Questão
Which are considered renewable energy sources (select two)?
Responda
  • Nuclear
  • Solar
  • Wave
  • Natural gas

Questão 41

Questão
How many years can an agricultural product grown or be raised to be considered as rapidly renewable by LEED?
Responda
  • 5
  • 10
  • 15
  • 20

Questão 42

Questão
What is the first step in a successful waste management policy?
Responda
  • Recycle all possible construction materials.
  • Reuse existing materials.
  • Reduce the total quantity of waste.
  • Specify recyclable materials.
  • Determine the embodied energy of the product.

Questão 43

Questão
A project generates 100 tons of waste throughout construction. 50 tons are collected on-site and sent to a sorting facility with a facility-wide diversion rate of 60%. 40 tons are separated on-site and sent directly to recyclers. The final 10 tons are incinerated off-site. What percentage of waste does LEED consider to have been recycled?
Responda
  • 40%
  • 50%
  • 70%
  • 80%

Questão 44

Questão
According to the EPA, what percentage of solid waste is currently recycled in the United States?
Responda
  • 11%
  • 32%
  • 51%
  • 72%

Questão 45

Questão
A building material that is made from recycled soda bottles contains ___?
Responda
  • Post-industrial recycled content
  • Post-consumer recycled content
  • Pre-consumer recycled content
  • Pre-fabricated recycled content

Questão 46

Questão
LEED defines regional materials as originating within ___?
Responda
  • 50 miles of the project site
  • 250 miles of the project site
  • 500 miles of the project site
  • 750 miles of the project site

Questão 47

Questão
Ongoing consumables are consumed during which of the following?
Responda
  • Design only
  • Construction only
  • Occupancy only
  • Both construction and operation
  • Construction and at the building’s end of life

Questão 48

Questão
Which environmentally preferable attributes of materials does LEED recognize (select three)?
Responda
  • Are harvested and manufactured regionally
  • Contain recycled content
  • Are sourced from developing countries
  • Are salvaged
  • Offer future customization options

Questão 49

Questão
According to the Environmental Protection Agency, what percentage of time do Americans spend indoors?
Responda
  • 75%
  • 65%
  • 90%
  • 50%

Questão 50

Questão
Thermal comfort is typically attributed to what environmental factors?
Responda
  • Temperature, humidity, and air speed
  • Ventilation, temperature, and daylight
  • Humidity, ventilation, and controllability
  • Density, temperature, and solar heat gain

Questão 51

Questão
The abbreviation VOC refers to ____?
Responda
  • Volatile organic compounds
  • Variable operating conditions
  • Variable ozone contaminants
  • Versatile organized composites

Questão 52

Questão
Which strategy supports improved indoor air quality?
Responda
  • Eliminate refrigerants with ozone-depleting potential.
  • Avoid the use of products with high carbon dioxide concentrations.
  • Use filters with a low minimum efficiency reporting value (MERV) rating.
  • Use materials with recycled content.
  • Use advance framing techniques.
  • Design systems to deliver ample outside air.

Questão 53

Questão
A school project in predesign would like to incorporate building strategies to maximize student learning. Which strategies should be considered to achieve this goal (select two)?
Responda
  • Install individual thermal comfort controls in offices.
  • Incorporate daylight into classrooms.
  • Reduce the energy use of the building below the baseline standard.
  • Consider acoustical issues in core learning spaces.

Questão 54

Questão
An operable window is considered what kind of control?
Responda
  • Lighting control
  • Thermal comfort control
  • Acoustical control
  • Environmental tobacco smoke control

Questão 55

Questão
Demand-controlled ventilation is typically adjusted in response to ___?
Responda
  • A time schedule
  • Occupant requests to the building operator
  • Carbon dioxide concentrations
  • VOC concentrations

Questão 56

Questão
In addition to prohibiting smoking within the building, where is it also important to prohibit smoking to reduce occupant exposure to harmful airborne chemicals (select two)?
Responda
  • In covered parking spaces
  • Near building entrances
  • Adjacent to building air intakes
  • In wooded areas

Questão 57

Questão
An Innovation in Design credit for exemplary performance would be available for ___?
Responda
  • Implementing a comprehensive green building education program
  • Significantly diverting construction waste beyond the requirement of 75%
  • Achieving carbon neutrality
  • Providing 75% more spaces with daylighting
  • Developing a green housekeeping policy

Questão 58

Questão
Projects can identify which credits have regional priority by ____?
Responda
  • Checking the USGBC website
  • Researching locally pertinent environmental issues
  • Submitting a Credit Interpretation Request (CIR)
  • Calculating the net environmental impact

Questão 59

Questão
An Innovation in Design credit for innovative strategies is likely available for projects that ___?
Responda
  • Issue a press release to announce their LEED project registration.
  • Include two LEED Accredited Professionals on the project team.
  • Develop an educational outreach program.
  • Plan to enroll the project in LEED for Existing Buildings: Operations and Maintenance.

Questão 60

Questão
A project team is considering pursuing an Innovation in Design credit for a strategy that will require a large capital expense. The team decides that it will implement the strategy only if the strategy will be eligible for an Innovation in Design credit. What steps should the team take to determine whether its strategy will be eligible for the credit?
Responda
  • Research existing CIRs to see whether the strategy has been previously addressed.
  • Calculate the strategy’s overall environmental impact and self-evaluate whether it is significant.
  • Draft a compelling narrative for the LEED submittal.
  • Check the LEED rating system.

Semelhante

As 22 consagradas leis do Marketing
Cristiano Bertul
Tecnologia na Sala de Aula
Alessandra S.
Processo de Cicatrização
Letícia Silva
Simulado Espanhol
Marina Faria
Guia para usar GoConqr
GoConqr suporte .
Gestão de Pessoas: 6 dicas para ser mais eficiente
Liliane Tubino
Sala de Aula Invertida
GoConqr suporte .
A CIVILIZAÇÃO ROMANA
Lucas Villar
Músculos e ossos - Nível fácil
Daniel Pereira
5 passos para organizar e monitorar o desempenho nos estudos
Alessandra S.
Escala de Coma de Glasgow
Vanessa Palauro