SCP110 BIM 7B

Descrição

Quiz sobre SCP110 BIM 7B, criado por Stanley Chia em 21-03-2016.
Stanley Chia
Quiz por Stanley Chia, atualizado more than 1 year ago
Stanley Chia
Criado por Stanley Chia mais de 10 anos atrás
295
4

Resumo de Recurso

Questão 1

Questão
Suggested BIM uses for tender phase (for contractor) are:
Responda
  • Cost Estimation

  • Site Planning (Logistic Planning)

Questão 2

Questão
Suggested BIM uses for Pre-Construction phase (for contractor) are:
Responda
  • Reviewing Consultant Models

  • Model-based Project Planning and Scheduling

Questão 3

Questão
Suggested BIM uses for Construction phase (for contractor) are:
Responda
  • Construction Coordination

  • Modelling and Shop Drawings

  • Sequence Complex Construction
  • Setting Out and Verification on Site
  • Prefabrication
 Proposal
  • As-Built models

  • Model for Facility Management

Questão 4

Questão
The contractor use site model to
Responda
  • Model the site topography
  • Add hoardings along the boundary 
with site access (gates)
  • Plan and model construction access and 
pedestrian access inside the site
  • Model the site offices, storage areas and utilities
  • Plan the vehicle movements and mobile crane movements
  • Plan locations of Tower Cranes

Questão 5

Questão
Once the site plan model is developed, the main contractor could communicate the site plan to his sub-contractors/workers using: 3D model walk-through 4D simulations or animation videos
Responda
  • True
  • False