First (ADSE I) [Quiz 3]

Description

SOFTWARE QUALITY + SOFTWARE CONSTRUCTION + SOFTWARE PROCESS MEASUREMENT
Muhammad Aqib
Quiz by Muhammad Aqib, updated more than 1 year ago
Muhammad Aqib
Created by Muhammad Aqib almost 5 years ago
402
0

Resource summary

Question 1

Question
What are the different quality standards?
Answer
  • SMDL
  • TickIT
  • SLOI
  • CMMI

Question 2

Question
What are tools which Quality objective can be met?
Answer
  • TQM
  • PCDQ
  • TSM
  • PDCA

Question 3

Question
Which one is not SQM process?
Answer
  • Verification process
  • Software life cycle process
  • Review process
  • Quality assurance process

Question 4

Question
Finding area of a program not exercised by a set of test cases is called__________
Answer
  • Defect Resolution
  • Coverage Analysis
  • Risk Management
  • Test Management

Question 5

Question
Checking Quality of software in both simulated and live environments is known as
Answer
  • Checking
  • Usability
  • Validity
  • Validation

Question 6

Question
The static system model exploit which type of relationship
Answer
  • Activity cost
  • Quality cost
  • Time cost
  • None of the above

Question 7

Question
Variation in debugging:coding ability has been reported to
Answer
  • 1:5
  • 1:8
  • 1:10
  • 1:2

Question 8

Question
Defects caught internally deal by discarding or repairing the defective items called
Answer
  • appraisal cost
  • internal failure cost
  • prevention cost
  • external failure cost

Question 9

Question
Coding and testing is done in following manner
Answer
  • cross_functional
  • ad_hoc
  • Bottom-up
  • Top-down

Question 10

Question
The largest percentage of total life cycle software cost is
Answer
  • Design cost
  • Coding cost
  • Maintenance cost
  • Testing cost

Question 11

Question
Construction produces high volume of
Answer
  • Configuration items
  • Design
  • Process

Question 12

Question
The fundamentals of software construction include:
Answer
  • Minimizing complexity
  • Anticipating change
  • Constructing for verification
  • Standards in construction
  • All of the above

Question 13

Question
Standards which directly affect construction issues include
Answer
  • Programming Languages
  • Unified Modeling Language
  • Mainframe
  • All of the above

Question 14

Question
We should construct software that allows bugs to be easily found and fixed.
Answer
  • True
  • False

Question 15

Question
Do Anticipation of change affect software construction.
Answer
  • True
  • False

Question 16

Question
Construction depends on which of the following:
Answer
  • degree of the life cycle model used
  • degree of designing process

Question 17

Question
System testing is done by
Answer
  • QA engineers
  • Developers
  • Quality Manager

Question 18

Question
Unit testing is done by
Answer
  • QA engineers
  • Developer
  • Quality Manager

Question 19

Question
Which of the following are Integration strategies
Answer
  • Big bang, top-down and bottom-up
  • Continuous integration
  • All of the above

Question 20

Question
The important decisions are taken during which of the following phases
Answer
  • Coding phase
  • Testing phase
  • requirements analysis and design

Question 21

Question
The AIS cycle allows for multiple iterations
Answer
  • True
  • False

Question 22

Question
There are _____ general architectures for assessment model
Answer
  • 2
  • 3
  • 4
  • 5

Question 23

Question
Model building includes only calibration
Answer
  • True
  • False

Question 24

Question
Software product measurement includes
Answer
  • size
  • structure
  • both a and b
  • only a
  • only b

Question 25

Question
Measurement is used to identify strength and weakness of processes
Answer
  • True
  • False

Question 26

Question
The personal software process is a part of
Answer
  • process model
  • experimental technique
  • analytical technique
  • benchmarking

Question 27

Question
Process measurement technique are classified into 3 types
Answer
  • True
  • False

Question 28

Question
Minimum requirement in CBA-IPI assessment method does not include data validation and collection
Answer
  • True
  • False

Question 29

Question
In staged process assessment model risk analysis forms which stage
Answer
  • 3
  • 4
  • 5
  • 6

Question 30

Question
The last stage in automation tools is
Answer
  • mockup
  • create
  • stage and test
  • release
Show full summary Hide full summary

Similar

Important (ADSE I)
Muhammad Aqib
First (ADSE I) [Quiz 1]
Muhammad Aqib
Second (ADSE I) [Quiz]
Muhammad Aqib
Silas Marner notes
mehxinee
Themes in Macbeth
annasc0tt
Religious Studies- Marriage and the family
Emma Samieh-Tucker
How to revise
KimberleyC
Perimeter Check-up
whitbyd
English Basic Grammar
tvazacconcia
GCSE Computer Science (AQA)
Wolfie Ruth
CSA (115) ⊙ IITU 2017
Zhandos Ainabek