Overhead cranes with more than one hoisting unit shall have....
Question 2
Question
What is the purpose of the "E' (emergency) stop on an overhead crane?
Answer
-
Removes power to hoists only
-
removes power to entire bridge
-
removes power to trolley only
-
removes power to entire crane
Question 3
Question
how often does OSHA require a wire rope inspection?
Answer
-
once a shift
-
once a week
-
once a month
-
once a quarter
Question 4
Question
Most loads should be rigged to within how many degrees of level?
Question 5
Question
According to ASME B30.2, what is the safety factor for rigging?
Answer
-
3 to 1
-
4 to 1
-
5 to 1
-
6 to 1
Question 6
Question
According to OSHA frequent inspections shall be performed
Answer
-
monthly to annually
-
daily to monthly
-
hourly to daily
-
daily to weekly
Question 7
Question
According to ASME B 30.2 a frequent inspection must be performed by a
Answer
-
competent person
-
designated person
-
qualified person
-
authorized person
Question 8
Question
According to ASME B30.2, the maximum twist of the hook can't exceed ?
Answer
-
25 degrees
-
10 degrees
-
15 degrees
-
20 degrees
Question 9
Question
When inspecting electrical contacts, what are the signs they are bad?
Answer
-
pitted or burned
-
discolored
-
springs are taut
-
makes sparks
Question 10
Question
According to ASME B30.2, what type of fire extinguisher is required for overhead cranes?
Question 11
Question
Before leaving an overhead crane unattended, attached loads should be ?
Question 12
Question
Before using your hand to steady any load, you should?
Question 13
Question
According to OSHA, the rated capacity of all overhead cranes shall be
Answer
-
clearly marked on the side of the crane
-
filed in supervisors office
-
clearly marked on shipping papers
-
filed in crane owners office
Question 14
Question
When attaching spreaders to any load, you must keep in mind that,
Answer
-
the higher the spreader angle the greater the tension
-
the lower the spreader angle the lesser the tension
-
the higher the spreader angle the tension will remain the same
-
the lower the spreader angle the greater the tension
Question 15
Question
By order of hitch strength, which is correct?
Answer
-
choker, basket, vertical
-
basket, choker, vertical
-
basket, vertical, choker
-
vertical, basket, choker
Question 16
Question
According to OSHA, the maximum hook throat opening must not exceed
Answer
-
5% of its original size
-
10% of its original size
-
15% of its original size
-
20% of its original size
Question 17
Question
According to OSHA, how many wraps must be left on a hoist drum of an overhead crane with the hook at its lowest position?
Answer
-
1 wrap
-
2 wraps
-
3 wraps
-
4 wraps
Question 18
Question
The upper limit switch of all overhead cranes shall be tested every
Question 19
Question
Vertical movement of an overhead crane is controlled by the
Answer
-
trolley controller
-
hoist controller
-
bridge controller
-
travel controller
Question 20
Question
A swinging load should be controlled by the ?
Answer
-
bridge and trolley controller
-
trolley and hoist controller
-
bridge and hoist controller
-
limit switch and hoist controller
Question 21
Question
What should be the first step in a daily inspection of an overhead crane?
Question 22
Question
What should be done with an unbalanced load?
Answer
-
lower load to floor
-
sound safety device
-
increase operating speed
-
reduce operating speed
Question 23
Question
When making a lift, where should the load block be positioned?
Answer
-
horizontal to the load attachment points
-
horizontal to the center of gravity
-
vertically over the load's center of gravity
-
vertically over the load
Question 24
Question
When energizing the crane, the controller should be in what position?
Answer
-
hoisting
-
lowering
-
trolley
-
neutral
Question 25
Question
According to A.S.M.E., warning signals shall be given when
Question 26
Question
According to A.S.M.E. B30.1, an overhead crane equipped with a lower limit device can have how many wraps left on the drum at its lowest point
Question 27
Question
According to OSHA, the proper time to check the hoist brake is
Answer
-
before making a lift
-
during an inspection
-
during the first lift
-
lowering the first lift
Question 28
Question
In the event of an emergency, who may give the stop signal?
Answer
-
foreman
-
supervisor
-
anyone
-
safety officer
Question 29
Question
According to ASME B30.2, before lifting a load the hoist ropes will be free of kinks and
Question 30
Question
The purpose of the upper limit switch is to
Answer
-
limit bridge travel
-
limit trolley travel
-
limit hoist travel
-
limit upper span
Question 31
Question
According to OSHA, the operator shall not hoist loads above
Answer
-
open areas
-
personnel
-
equipment
-
walkways
Question 32
Question
Where should the hook block be positioned for shutdown?
Question 33
Question
Whose responsibility is it to select the proper rigging equipment
Answer
-
supervisor
-
plant manager
-
plant safety
-
operator
Question 34
Question
Before making a lift the operator must first determine
Answer
-
placement of rigging
-
weight of load
-
placement of tag line
-
attachment points
Question 35
Question
a wire rope designated as 6 X 19 has
Question 36
Question
What is the safe working load of a wire rope defined as ?
Answer
-
breaking strength times safety factor
-
breaking strength divided by safety factor
-
breaking strength plus safety factor
-
breaking strength subtracted from safety factor
Question 37
Question
The vertical movement of an overhead crane is controlled by the
Question 38
Question
swinging loads can be controlled by the use of the
Answer
-
bridge or trolley controls
-
bridge or hoist controls
-
trolley or hoist controls
-
limit switch and hoist controls
Question 39
Question
first step in daily inspection would be to check
Answer
-
catwalk area and guardrails
-
crane cab and trolley brakes
-
controller position in neutral
-
main switch locked in off position
Question 40
Question
If the load does not balance properly after being raised what steps should be taken
Question 41
Question
When making a lift what position should the trolley be in?
Answer
-
vertical to the load
-
horizontal to the load
-
depends on load location
-
makes no difference
Question 42
Question
What position should all controllers be in when energizing
Answer
-
the raised postion
-
the lowered position
-
either raised or lowered
-
either neutral or off
Question 43
Question
ASME B.30.2 states that the minimum number of wraps one the hoisting drum should never be less than _______ unless a lower limit device is provided
Answer
-
1 wrap
-
2 wraps
-
3 wraps
-
4 wraps
Question 44
Question
Before leaving a crane cab unattended any attached load shall be
Answer
-
suspended
-
vertical
-
horizontal
-
landed
Question 45
Question
What is the purpose of the upper limit switch? (the only one required by OSHA)
Question 46
Question
When any machinery or apparatus is found to be defective or inoperative on the crane the person discovering this condition should
Question 47
Question
When loss of power occurs the crane operator should
Answer
-
wait for power to be restored
-
install larger fuses
-
put controllers in the off position
-
attempt to locate the problem
Question 48
Question
A floor weight limitation is posted at 700 pounds per square foot maximum. Before lowering a load down onto this floor that is calculated at 900 pounds per square foot. What must be done?
Answer
-
lower the load at slower rate
-
install cribbing to increase surface bearing area
-
install cribbing to decrease surface bearing area
-
install cribbing to maintain the same amount of surface bearing area
Question 49
Question
The term lay length when referring to wire rope if equal to
Question 50
Question
According to OSHA rated capacity rigging charts will aid you when ?
Answer
-
determining the weight of the load
-
determining the load's center of gravity
-
determining the rigging equipment manufacturer date
-
determining if the rigging equipment meets all criteria establish by law
Question 51
Question
If possible always try to keep horizontal sling angles
Answer
-
less than 30 degrees
-
greater than 30 degrees
-
less than 60 degrees
-
greater than 60 degrees