4.7 Cogeneration Systems and Operation

Description

power engineering 3b2 Quiz on 4.7 Cogeneration Systems and Operation, created by TRAVIS CANNING on 29/02/2016.
TRAVIS CANNING
Quiz by TRAVIS CANNING, updated more than 1 year ago
TRAVIS CANNING
Created by TRAVIS CANNING about 8 years ago
65
1

Resource summary

Question 1

Question
The benefits of a combined-cycle with a single shaft gas/steam turbine arrangement are: 1. High level of thermal efficiency 2. Low capital cost 3. Fast start-up and shut down 4. Short construction time 5. Low maintenance cost
Answer
  • 1,2,3
  • 1,2,4
  • 1,3,4
  • 1,2,3,4
  • 1,2,3,4,5

Question 2

Question
_________ is well known for its contribution to the greenhouse effect
Answer
  • C4H8
  • CO
  • CO3
  • CO2
  • CH3

Question 3

Question
In a cogeneration system the thermal load can be controlled by which two of the following strategies 1. Fixed production of a minimum thermal energy 2. Varying requirements for thermal energy 3. Base loaded for maximum thermal energy 4. Topping for minimum thermal energy
Answer
  • 1,2
  • 2,3
  • 1,3
  • 2,4
  • 1,4

Question 4

Question
Which of these cogeneration systems does the following description best describe? "The compressor driven by the gas turbine supplies pressurized combustion air to mix with fuel and burned in the boiler. The steam produced by the boiler is used to drive a steam turbine that is connected to an electrical generator. The exhaust gases from the boiler are then fed to the gas turbine which is connected to a second electrical generator. "
Answer
  • Back Pressure Turbine
  • Waste Heat
  • Gas Turbine
  • Combined-cycle Steam/ Gas Turbine
  • Combined-cycle Gas/ Steam Turbine

Question 5

Question
When additional thermal energy is required in a cogeneration system, a _____ is often used
Answer
  • HRSG
  • Gas Turbine
  • Boiler
  • Duct Burner
  • Unit Heater

Question 6

Question
HRWH stands for
Answer
  • Heat Recovery Waste Heater
  • Heat Recovery Water Hydro treater
  • Heat Recovery Water Heater
  • Heat Recovery Waste Hydrotreater
  • Heat Recovery Warming Heater

Question 7

Question
A _____ system has the electrical supply from the utility grid fixed and the cogeneration system looks after changing electrical requirements.
Answer
  • Home based
  • Base Loaded
  • Set electrical demand
  • Constant based
  • Demand based

Question 8

Question
The primary purpose of cogeneration is to:
Answer
  • Reduce the equipment cost
  • Increase the life span of equipment
  • Reduce the prices of natural gas
  • Reduce staffing cost
  • Reduce energy costs

Question 9

Question
In order to counter the corrosive nature of the condensate produced from burning fuel with high sulphur content, a _____ heat exchanger is installed in the condensing heat recovery systems.
Answer
  • Plastic Lined
  • Mild Steel
  • High carbon steel
  • High alloy steel
  • Stainless steel

Question 10

Question
During low thermal requirement periods of a cogeneration system a diverter valve is used to direct the:
Answer
  • Exhaust gases from the HRSG to the atmosphere
  • Thermal energy from the duct burner to the atmosphere
  • Excess electrical energy to another utility grid
  • Thermal energy from the gas turbine to the duct burner
  • Exhaust gases from the gas turbine to the atmosphere
Show full summary Hide full summary

Similar

Nouns & Definite Articles Notes
Selam H
AS Psychology - Research Methods
kirstygribbin
Cognitive Psychology Key Terms
Veleka Georgieva
AQA GCSE Physics Unit 2.2
Matthew T
History- Home Front WW1
jessmitchell
GCSE Chemistry C4 (OCR)
Usman Rauf
GCSE Maths Conversions
EmilieT
GCSE Maths: Understanding Pythagoras' Theorem
Micheal Heffernan
Using GoConqr to study geography
Sarah Egan
1PR101 2.test - Část 16.
Nikola Truong
An Inspector Calls - Quotes and Context
James Holder