ASAP 8 Methodology Technical Solution Management Work Stream Quiz

Description

Diploma ASA380 - ASAP Implementation Methodology Quiz on ASAP 8 Methodology Technical Solution Management Work Stream Quiz , created by kim.t.dowling on 16/03/2016.
kim.t.dowling
Quiz by kim.t.dowling, updated more than 1 year ago
kim.t.dowling
Created by kim.t.dowling about 9 years ago
44
1
1 2 3 4 5 (0)

Resource summary

Question 1

Question
The SAP Going Live Check is split into two sections: Analysis and Verification. What are the recommendations regarding delivery of these sessions? (More than one answer is correct. Please choose the correct answers.)
Answer
  • All sessions should be delivered before the project go-live.
  • All sessions should be delivered after the project go-live.
  • Going Live Analysis is conducted at minimum four weeks before the project go-live, during the realisation phase.
  • Going Live Verification is scheduled after the start of production, during the Go Live Support phase.
  • All sessions are delivered by certified consultants from SAP Active Global Support through a remote connection.

Question 2

Question
Which are the deliverables of the Technical Solution Management work stream in the Realisation phase?
Answer
  • Define General Settings and Master Data.
  • Quality Assurance Environment (QAS).
  • Technical Solution Design.
  • Technical Operations and Handover Plan.
  • SAP Going Live Check,

Question 3

Question
What is the purpose of the Technical Solution Management work stream in the project preparation phase? (One answer)
Answer
  • To define General Settings and Master Data for the project.
  • To deliver QA and Production environments and finalize the development of the operations handbook.
  • To define and develop the Organisational and Production Support Readiness Check
  • To start preparation of essential technical and infrastructure deliverables that support the initial project planning of an SAP implementation project.
  • To prepare a strategy to hand off operations of the solution landscape to the post-production support organisation.

Question 4

Question
Which are the tasks of the deliverable 'Development Environment (DEV)' in the Blueprint phase? (More than one answer is correct. Please choose the correct answers.)
Answer
  • Execute Technical Installation of SAP Products for DEV
  • Create master data in DEV environment - Master Data #1 - n
  • Conduct Design Review Service
  • Perform Manual Configuration in DEV
  • Import Configuration and Development Objects to QAS

Question 5

Question
Which transaction code in SAP Solution Manager is used to set up project documentation standards? (One answer)
Answer
  • SOLAR01
  • RMMAIN
  • SOLAR02
  • SOLAR_PROJECT_ADMIN
  • SOLAR_LEARNING_MAP
Show full summary Hide full summary

0 comments

There are no comments, be the first and leave one below:

Similar

Geography Coastal Zones Flashcards
Zakiya Tabassum
Principles of basic electrical circuits
Vito Martino
Biology- Genes and Variation
Laura Perry
How does Shakespeare present villainy in Macbeth?
maxine.canvin
GCSE REVISION TIMETABLE
TheJileyProducti
IB Biology Topic 4 Genetics (SL)
R S
Mind Maps with GoConqr
Elysa Din
Forms of Business Ownership Quiz
Noah Swanson
1PR101 2.test - Část 10.
Nikola Truong
CST Module 6a
Jane Foltz