English project

Description

final
cesar augusto vesga chaparro
Slide Set by cesar augusto vesga chaparro, updated more than 1 year ago
cesar augusto vesga chaparro
Created by cesar augusto vesga chaparro almost 7 years ago
3
0

Resource summary

Slide 1

    What is it? It is an element of maritime monitoring, in real time for the surveillance of any body of water.   What is it made of? The maritime station has a flotation system made of fiberglass and resin, also has a self-supporting tower made of stainless steel to minimize corrosion, in this tower are an array of batteries that power the electrical devices of the Marine monitoring station these batteries are charged by solar panels. The maritime monitoring station has two dome type cameras (IP), communication of the submarine station with its ground control center will be done with a radio link with AC technology, In addition the submarine station will have a system of sensors for the measurement of water control.
    Submarine station
    Caption: : The sea eye

Slide 2

        Goals? One of the objectives is the tourist promotion of Santa Marta beaches, in addition to this monitoring, the certification of the different beaches is sought, also the observation of marine fauna, plowing of the sea floor and recovery of species, How does it work? The maritime station will issue videos and data on water quality. These will be sent by means of a radio link to the center or station on the ground for further study and dissemination. A website will be deployed showing sampling data that Be collected in addition to videos showing what state the beaches are. Because our project is important? Its economic support is important as this project will achieve specific objectives that are desired in Santa Marta are, promote tourism and wildlife preservation by means of monitoring and control of bathers, area of movement of boats and areas fishing.
    Submarine station

Slide 3

    Goals? One of the objectives is the tourist promotion of Santa Marta beaches, in addition to this monitoring, the certification of the different beaches is sought, also the observation of marine fauna, plowing of the sea floor and recovery of species, How does it work? The maritime station will issue videos and data on water quality. These will be sent by means of a radio link to the center or station on the ground for further study and dissemination. A website will be deployed showing sampling data that Be collected in addition to videos showing what state the beaches are. Because our project is important? Its economic support is important as this project will achieve specific objectives that are desired in Santa Marta are, promote tourism and wildlife preservation by means of monitoring and control of bathers, area of movement of boats and areas fishing.
    Submarine station
    Caption: : The sea eye
Show full summary Hide full summary

Similar

¿Cómo de bien recuerdas «Los Futbolísimos 8: El misterio del Circo del Fuego»?
Ana Fernandez
Análisis entre TRABAJO EN EQUIPO Y EQUIPO DE TRABAJO
dayitabell
Exposiciones: Datos y calendario
Antigua Muñoz luque
TRABAJO EN EQUIPO & LIDERAZGO.
Kelly Peña
¿Cómo de bien recuerdas «La aventura de los Balbuena y el último caballero»?
Ana Fernandez
MARCO CONCEPTUAL PARA EL TRABAJO EN EQUIPO
julian esteban herrera gallego
Competencias laborales
Juan Manzu
Análisis de Roles de Trabajo en equipo
hebebome
Dinámica del mercado financiero internacional
Ruth Mery
DESARROLLO ORGANIZACIONAL
ochored1604
SEMEJANZAS ENTRE TRABAJO EN EQUIPO Y EQUIPO DE TRABAJO
Melissa Buitrón