  1. 1Which of the following combinations correctly describes a valid approach to component testing:

    i) Functional testing of the component in isolation.
    ii) Structure-based testing of the code without recording incidents.
    iii) Automated tests that are run until the component passes.
    iv) Functional testing of the interfaces between modules.
    1. AA. i and ii.
    2. BB. I, ii and iii
    3. CC. iii.
    4. DD. ii and iv
  2. 2Which of the following is a KEY test control task?
    1. AA. Initiating corrective actions
    2. BB. Determining the scope
    3. CC. Implementing the test policy
    4. DD. Scheduling test implementation
  3. 3What is the name of a skeletal implementation of a software component that is used for testing?
    1. AA. Use case
    2. BB. Domain
    3. CC. Driver
    4. DD. Stub
  4. 4Which is the best definition of complete testing:
    1. AA. You have discovered every bug in the program.
    2. BB. You have tested every statement, branch, and combination of branches in the program.
    3. CC. You have completed every test in the test plan.
    4. DD. You have reached the scheduled ship date.
  5. 5Complete statement and branch coverage means:
    1. AA. That you have tested every statement in the program.
    2. BB. That you have tested every statement and every branch in the program.
    3. CC. That you have tested every IF statement in the program.
    4. DD. That you have tested every combination of values of IF statements in the program
  6. 6There are several risks of managing your project's schedule with a statistical reliability model. These include (choose one or more of the following):
    1. AA. Testers spend more energy early in the product trying to find bugs than preparing to do the rest of the project's work more efficiently
    2. BB. Managers might not realize that the testing effort is ineffective, late in the project, because they expect a low rate of bug finding, so the low rate achieved doesn't alarm them.
    3. CC. It can increase the end-of-project pressure on testers to not find bugs, or to not report bugs.
    4. DD. All of the above
  7. 7Typical defects that are easier to find in reviews than in dynamic testing are:
    1. AA. Deviations from standards,
    2. BB. Requirement defects,
    3. CC. Design defects,
    4. DD. Insufficient maintainability and incorrect interface specifications.
    5. EE. All of the above.
  8. 8Reviews, static analysis and dynamic testing have the same objective
    1. AA. Identifying defects.
    2. BB. Fixing defects.
    3. CC. A. and B
    4. DD. None of the above
  9. 9What techniques would be MOST appropriate if the specifications are outdated?
    1. AA. Structure-based and experienced-based techniques
    2. BB. Black-box and specification-based techniques
    3. CC. Specification-based and structure-based techniques
    4. DD. Structure-based technique and exhaustive testing
  10. 10Measurement dysfunction is a problem because:
    1. AA. Even though the numbers you look at appear better, to achieve these numbers, people are doing other aspects of their work much less well.
    2. BB. We don't know how to measure a variable (our measurement is dysfunctional) and so we don't know how to interpret the result.
    3. CC. You are measuring the wrong thing and thus reaching the wrong conclusions.
    4. DD. All of the above.

Informationen

Beschreibung
Quiz am 40 Questions Quiz 2 (41-80), erstellt von Daniel Neag am 03/12/2017.
Sprache
English
Aufrufe
57
Schlagwörter
foundation
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck