ASAP 8 Methodology Test Management Work Stream Quiz

kim.t.dowling 7 Fragen

Quiz starten

Fragen in diesem Quiz (7)

  1. 1Which of the following are SAP Testing Tools?
    1. ASAP Solution Manager Test Workbench.
    2. BSAP Quality Center by HP.
    3. CSAP Data Volume Management Cockpit
    4. DSAP Performance Stress Testing (SAP PST).
    5. ESAP Test Acceleration and Optimization (SAP TAO).
  2. 2Which of the following tasks are part of the Approved Technical System Test deliverable in the Final Preparation phase ?

    (More than one answer is correct. Please choose the correct answers.)
    1. AFinal Integration test.
    2. BExecute Technical System Tests.
    3. CGoing Live Check..
    4. DTest of the individual interface programs.
    5. EObtain System Test Results Sign-off
  3. 3Which of the following statements about User Acceptance testing is true?

    (More than one answer is correct. Please choose the correct answers.)
    1. AThe main objective of the Organisational Change Management work stream is to achieve a successful User acceptance testing.
    2. BThe emphasis of User acceptance testing is to demonstrate that the system user roles and authorisations have been configured correctly.
    3. CUser acceptance testing is the last test cycle of an SAP solution implementation, occurs at the end of the realisation phase subsequent to integration testing cycles and aims at ensuring that the system has been tested thoroughly by the project team and is ready to be released to the end-user community.
    4. DUser acceptance testing means that all test cases have to be approved and signed by the key users for the related business processes.
    5. EUser acceptance testing is the first test cycle of an SAP solution implementation, to make sure the users have the first say in how the user front end is designed.
  4. 4Testing is an integral part of building and deploying a fully functional and stable system in a timely manner. Which are the two general test categories that need to be addressed?

    (One answer)
    1. AUnit Testing and Integration Testing
    2. BBusiness Process Testing and Business Scenario Testing
    3. CFunctional Testing and Data Load Testing
    4. DFunctional Testing and Performance Testing
    5. EBusiness Process Testing and Performance Testing
  5. 5Which are testing-focusing accelerators provided in ASAP?

    (More than one answer is correct. Please choose the correct answers.)
    1. ATest Case Template
    2. BFunctional Testing Close Template
    3. CFunctional Specification Template
    4. DFinal Configuration Plan
    5. EPerformance Test Plan Template
  6. 6Which of the following test types is performed in the production environment?

    (One answer)
    1. AFunctional testing
    2. BRegression testing
    3. CPerformance testing
    4. DData Conversion simulation
  7. 7In Realisation, during baseline and final configuration, the project team needs to test chains of transactions that represent business processes and scenarios. What do you call the test that is focused on multiple transactions within one defined business scenario?
    1. ARegression Test
    2. BPerformance Test
    3. CStress Test
    4. DString Test

Informationen

Beschreibung
Diploma ASA380 - ASAP Implementation Methodology Quiz am ASAP 8 Methodology Test Management Work Stream Quiz , erstellt von kim.t.dowling am 16/03/2016.
Sprache
English
Aufrufe
65
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck