Flussdiagramm
Ohne Titel
Inhalt des Flussdiagramms
START
1. Set up a multi-functional group
2. Review and confirm the flow chart
3. Review and confirm special characteristics
4. Review and confirm the control method
5. Review the sampling method
6. Verify the effectiveness of the measurement system
7. Confirm the person in charge
8. Confirm the escalation process
9. Write control plan draft
10. Review and modification
11. Control the implementation in the mid- to long-run
END