  1. 1The term ______ describes a product produced as part of a project. a. variance b. scope c. deliverable d. work packagec. deliverable
  2. 2Scope refers to: a. each level of work that is outlined in a work breakdown structure. b. the end product created as part of a project that is delivered to the client. c. tasks that are decomposed into smaller tasks in a work breakdown structure. d. the work involved in creating the products and the processes used to create them.d. the work involved in creating the products and the processes used to create them.
  3. 3_____ involves defining and documenting the features and functions of the products produced during the project as well as the processes used for creating them. a. Collecting requirements b. Defining scope c. Controlling scope d. Validating scopea. Collecting requirements
  4. 4_____ involves reviewing the project charter, requirements documents, and organizational process assets to create a scope statement, adding more information as requirements are developed and change requests are approved. a. Creating scope b. Defining scope c. Controlling scope d. Validating scopeb. Defining scope
  5. 5_____ involves formalizing acceptance of the project deliverables and during this phase the key project stakeholders, such as the customer and sponsor for the project, inspect and then formally accept the deliverables. a. Creating scope b. Defining scope c. Controlling scope d. Validating scoped. Validating scope
  6. 6Creating the WBS is a subprocess associated with the _____ process in project scope management. a. planning b. monitoring and controlling c. closing d. executinga. planning
  7. 7The ______ documents how project needs will be analyzed, documented, and managed. a. requirements traceability matrix b. requirements management plan c. WBS d. project scope statementb. requirements management plan
  8. 8Generating ideas by comparing specific project practices or product characteristics to those of other projects or products inside or outside the performing organization is known as _____. a. variance b. benchmarking c. prototyping d. decompositionb. benchmarking
  9. 9A(n) _____ is a table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed. a. requirements traceability matrix b. Gantt chart c. state transition table d. entity-attribute-value modela. requirements traceability matrix
  10. 10A(n) _____ is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project. a. project charter b. business case c. project scope statement d. work breakdown structured. work breakdown structure
  11. 11The main technique used in creating a WBS is _____, which involves subdividing project deliverables into smaller pieces. a. conglomeration b. accumulation c. decomposition d. catalyzationc. decomposition
  12. 12A(n) ____ is a task at the lowest level of the WBS. a. variance b. objective c. deliverable d. work packaged. work package
  13. 13The _____ should list and describe all of the deliverables required for the project. a. project charter b. scope statement c. WBS d. Gantt chartb. scope statement
  14. 14In the _____approach for constructing a WBS, you use a similar project’s WBS as a starting point. a. top-down b. bottom-up c. mind-mapping d. analogyd. analogy
  15. 15The _____ approach for constructing a WBS involves refining the work into greater and greater levels of detail. a. analogy b. bottom-up c. top-down d. mind mappingc. top-down
  16. 16The _____ approach for constructing a WBS starts with the largest items of the project and breaks them into subordinate items. a. analogy b. bottom-up c. top-down d. mind mappingc. top-down
  17. 17The _____ technique for creating a WBS uses branches radiating from a core idea to structure thoughts and ideas instead of writing down tasks in a list or immediately trying to create a structure for tasks. a. analogy b. bottom-up c. top-down d. mind mappingd. mind mapping
  18. 18In the _____ approach, team members first identify as many specific tasks related to the project as possible and then aggregate the specific tasks and organize them into summary activities, or higher levels in the WBS. a. analogy b. bottom-up c. top-down d. mind mappingb. bottom-up
  19. 19Mind mapping can be used for developing WBSs using a. the analogy approach only b. the bottom-up or analogy approach c. the top-down or bottom-up approach d. any approachc. the top-down or bottom-up approach
  20. 20Which of the following is recommended for the creation of a good WBS? a. Any WBS item should be the responsibility of all the people working on it. b. A unit of work should appear at only one place in the WBS. c. Each WBS item should be created assuming that the requirements are inflexible. d. The work content of a WBS item is independent of the WBS items below it.b. A unit of work should appear at only one place in the WBS.
  21. 21Scope creep refers to: a. the tendency for project scope to keep getting bigger and bigger. b. subdividing project deliverables into smaller pieces. c. the approved project scope statement and its associated WBS. d. a task at the lowest level of the WBS.a. the tendency for project scope to keep getting bigger and bigger.
  22. 22_____ involves formal acceptance of the completed project scope by the stakeholders. a. Scope validation b. Scope planning c. Scope control d. Scope baselinea. Scope validation
  23. 23_____ refers to the difference between planned and actual performance. a. Decomposition b. Variance c. Scope validation d. Scope creepb. Variance
  24. 24_____ refers to the process of developing a working replica of the system or some aspect of the system. a. Prototyping b. Variance c. Decomposition d. Use case modelinga. Prototyping
  25. 25_____ is a process for identifying and modeling business events, who initiated them, and how the system should respond to them. a. Prototyping b. JAD c. RAD d. Use case modelingd. Use case modeling
  26. 26_____ uses highly organized and intensive workshops to bring together project stakeholders—the sponsor, users, business analysts, programmers, and so on—to jointly define and design information systems. a. Prototyping b. JAD c. RAD d. Use case modelingb. JAD
  27. 27Scope refers to all the work involved in creating the products of the project and the processes used to create them. a. True b. FalseTrue
  28. 28Deliverables are only product-related, such as a piece of hardware or software. a. True b. FalseFalse
  29. 29Project scope management includes the processes involved in defining and controlling what is or is not included in a project. a. True b. FalseTrue
  30. 30The scope management plan can be informal and broad or formal and detailed, based on the needs of the project. a. True b. FalseTrue
  31. 31The project’s size, complexity, importance, and other factors do not affect how much effort is spent on collecting requirements for scope planning. a. True b. FalseFalse
  32. 32Information from the project charter provides a basis for further defining the project scope. a. True b. FalseTrue
  33. 33Project scope statements must include the project boundaries, constraints, and assumptions. a. True b. FalseFalse
  34. 34The scope of a project is clear and specific from the start. a. True b. FalseFalse
  35. 35Many information technology projects also require detailed functional and design specifications for developing software, which also should be referenced in the detailed scope statement. a. True b. FalseTrue
  36. 36The project scope statement should reference supporting documents, such as product specifications that will affect what products are produced or purchased, or corporate policies, which might affect how products or services are produced. a. True b. FalseTrue
  37. 37The project scope statement, stakeholder requirements documentation, and organizational process assets are the primary inputs for creating a WBS. a. True b. FalseTrue
  38. 38The scope baseline in a WBS consists of the requirements documentation and enterprise environmental factors. a. True b. FalseFalse
  39. 39The WBS is organized solely around project phases. a. True b. Falseb. False
  40. 40. A work package represents one component of the product that the project aims to deliver. a. True b. Falseb. False
  41. 41A work package must always represent less than 80 hours of work. a. True b. FalseFalse
  42. 42Given the project management software that is available, it is relatively easy to create a good WBS. a. True b. FalseFalse
  43. 43The tasks in a WBS must be developed as a sequential list of steps. a. True b. Falseb. False
  44. 44The executing tasks of the WBS remain constant from project to project. a. True b. Falseb. False
  45. 45Many organizations provide different guidelines and templates for developing WBSs. a. True b. FalseTRUE
  46. 46Mind mapping allows people to write and even draw pictures of ideas in a nonlinear format. a. True b. FalseTRUE
  47. 47The format of the WBS dictionary is essentially the same for all projects. a. True b. FalseFALSE
  48. 48A unit of work should appear at only one place in the WBS. a. True b. FalseTRUE
  49. 49Scope creep if not managed well can lead to the failure of information technology projects. a. True b. FalseTRUE

Informationen

Beschreibung
CIS 4375 Karteikarten am Chapter 5: Project Scope Management, erstellt von Technology Technology am 17/09/2018.
Aufrufe
17
Bewertung

Mehr zu Project Scope Management

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck