Karteikarten
B101 Contracts
Karten in diesem Stapel (198)
- 1Owners anticipated design and construction milestone dates- Design phase milestone
- Construction commencement milestone
- Substantial complettion date - 2who intends the following procurement of services & delivery methods for the projectThe owner
- 3The Owner and Architect shall use or incorporate AIA E204 ( Sustainable Project Exhibits) into the AgreementIf the Onwer identifies a Sustainable objective
- 4Who reviews Architect's Submital to OwnerOwners Representative
- 5Geotechnical Engineer and Civil Engineer are consultants retained by theOwner
- 6Structural Engineer Mechnical Engineer Electrical Engineer are all consultants retained by theArchitect
under Basic Services - 7Owner and Architect may rely on the Initial Information butboth Owner and Architect know the initial information might change
so adjustment can be done to the Architect's Schedule, services, compensation
Owner's budget, anticipated design and construction milestone - 8What AIA document shall be used to transmit, develop, document, exchange and establish, digital dataE203 (Building Information Modelling & Digital Data Exhibit)
must be agreed upon by both the Owner and Architect - 9What is the Prerequisite for E203G202 -Project BIM Protocol Form
- 10Who provides professional services as set forth by B101 AgreementArchitect
- 11The Architect shall perform its services consistent with the professional skill and care ordinarily provided byarchitects practicing in the same or similar locality under same and similar circumstances
- 12The Architect can work expeditiously butconsisitent with professional skill & care & in orderly progress of project
- 13The Architect shall identify a representative authorized toact on his behalf with respect to the project
- 14The Architect shall not collect or accept any compromising employment that would reasonably affect architects professional judgement with respect to the given projectexcept with owners knowledge or consent
- 15types of insurance the Architect should maintain until termination of agreement- commercial general liability
+
- automobile liability
= (UMBERLLA LIABILITY INSURANCE)
- workers compensation
- employee liability
- professional liability - 16What happens when you add any insurance to the normal insurance maintianedThe Owner shall pay the Architect
- 17The Architect shall include the Owner as additional insured whenusing
- primary (commerical general liabilty & autombile liabilty) or
- excess ( umberlla liability) policies - 18Certificate of insurance to the owner is provided by ?The Architect
- 19prompt written notice to the Owner when an error is discovered is provided byThe Architect
- 20Schedule of performance to the Owner is submitted by ...The Architect
- 21Schedule of performance includes...- anticipated dates for construction commencement
- substantial completion of work
- allowances for period of time used for owners review, owners consultant and approval of submission by AHJ over the project - 22Architect or Owner can not exceed schedule of perfomance once approved except for a ...reasonable cause
- 23government authorities are contacted to approve the Construction Documents & entities providing utility services to the project...by Architect
- 24Applicable design requirements imposed by govt. authorities and entities are responded to by the....Architect
- 25Program, laws, regulations, codes applicable to Architects services are reviewed...by the Architect
- 26Preliminary evaluation of owner's program, schedule, budget for cost of work, project site, proposed procurement & delivery method to ascertain requirement of the project are prepared...by the Architect
- 27owner reaches an understanding about project requirements with...the Architect
- 28alternative design & construction approaches to the owner after presenting his preliminary evaluation are discussed with...the Architect
- 29Preliminary design illustrating scale & relationship of project components are prepared by Architect...for the Owners approval
- 30after Pre-design, Schematic Design documents are prepared by Architect...for the Owners approval
- 31Schematic Design includes:- site plan
- preliminary building plan, section, elevations
- study model
- preliminary selection of major building systems & construction materials shall be noted on drawing and described in writing
- Perspective sketches
- digital representation - 32alternative materials, systems, equipment in developing the design project that is consistent with budget and cost of work, schedule shall be considered by...the Architect
- 33An estimate of "Cost of work" shall by submitted to the Owner by...the Architect
- 34schematic design document is submitted to the owner for approval by...the Architect
- 35after owners approval of Schematic design, owner authorize Design Development Design Development Documents includes:- plans, elevations, sections
- typical construction details
- diagramtic layout of building systems
- outline specification ( identify materials& systems & establish the quality levels) - 36in Design developmemt An update is done to the estimate of Cost of Work by...the Architect
- 37design development document is submitted to the owner for approval & advise owner of any adjustemtn to the cost estimate by...the Architect
- 38after owner approves the design development docs, Owner authoriz the construction documents Construction documents includes:Plans and Specification in Details
- 39in order to properly perform the work; additional information is required by the contractor as acknowledged by the...Owner and Architect
- 40additional information required by the contractor to properly perform the work includes;- shop drawings
- product data
- samples
and other similar submittals which the Architect shall review - 41design requirments from governmentaal authority having jursidiction shall be incorporated by...the Architect
- 42During Construction Documents, the Architect assist the Owner with...- form of agreement between the Owner and Contractor
- Conditions of the Contract for Construction ( general, supplementary & other conditions)
- procurment information that describes the time, place & conditions of bidding, including bidding proposal forms. - 43project manuel are compiled by... Project manuel includes:the Architect
- conditions of the contract for construction
- specifications
- may include bidding requirements and sample forms - 44Cost estimate of work in all phases are updated by...the Architect
- 45A list of prospective contractors are established by the owner with assist from...the Architect
- 46obtaining either competitive bids or negotiated proposal by owner with assist from...the Architect
- 47confirming responsiveness of bids or proposals by owner with assist from...The Architect
- 48determining the successful bid or proposal by the owner with assist from...the Architect
- 49Awarding & preparing contracts for constructions by the Owner with assist from...the Architect
- 50compeitive bidding Bidding Documents includes;- bidding requirments
- proposed contract documents - 51Owners does the bidding of project with assist from the Architect through:- facilitating the distribution of bidding documents to prospective bidders
- organizing & conducting pre-bid conference
- preparing responses to questions from prospective bidders : providing clarifications & interpretations of bidding documents in the form of ADDENDA
- Organizing & conducting the opening of the bids & subsequently documenting & distributing the bidding results as directed by the Owner - 52If the bidding documents permits substitutions ; Only upon the Owner written Authorization shall the...Architect consider request for substitutions & prepare & distribute ADDENDA identifying approved substitutions to all prospective bidders ; as an additional service
- 53Negotiated Proposal Proposal Documents includes:- proposal requirements
- proposed contact documents - 54Owners does the obtaining of proposals with assist from the Architect through:- facilitating the distribution of proposal documents to prospective contractors and rquesting their return upon completion of negotiation process
- organizing & participating in selection interviews with prospective contractors
- preparing responses to questions from prospective contractors : providing clarifications & interpretations of proposal documents in the form of ADDENDA
- Participating in the Negotiation with prospective contractors & subsequently preparing a summary report of negotiation results as directed by the Owner - 55If the proposal documents permits substitutions ; Only upon the Owner written Authorization shall the...Architect consider request for substitutions & prepare & distribute ADDENDA identifying approved substitutions to all prospective contractors ; as an additional service
- 56Construction Phases Services Architects Services under the B101 agreement shall not be affected by the Owner & Contractor modifications of A201...unless the Owner and Architect amend B101 agreement
- 57Adminstration of the Contract as set forth in A201 shall be delivered by...the Architect
- 58During Construction Phase services, the Architect shall consult and advise the...Owner
- 59Only to the extent agreed in the B101 agreement, the Architect shall have authority to act on behlaf of the...Owner
- 60Contractors failure to perform the work in accordance to A201 ( Contract Doc) is not the responsiblity of the...Architect
- 61Contractors acts & omisssions in performing portions of the work is not the responsibility of the...Architect
- 62Architects responsibility to provide construction phase services starts with...- award of the contract for construction
- ends on the date the Architect issues final certificate of payment - 63Architect shall visit the sit at intervals appropriate to the stage of construction, so as to...- check progress
- qualify of the work completed
- determine workis performeed in accordance to contract documents - 64exhausive or continous on site inspections to check quality or quantity of work is not the responsibility of the..Architect
- 65Architect shall report to the owner...- known deviation from the contract documents
- known deviation from the construction schedules submitted by Contractor
- defects & deficiences observed in the work - 66Work that doesnt confrom to the contract documents can be rejected by the...Architect
; because he has the authority to do so
but this authority does not give a duty or responsibilty from Architect to Contractors, subs, suppliers, agents - 67inspection and testing of the work in accordance to the contract document can be required...by the Architect
; because he has the authority to do so
but this authority does not give a duty or responsibilty from Architect to Contractors, subs, suppliers, agents - 68Interpretation and decision on matters concerning the performance of the contract documents shall be decided bythe Architect only on written request of either the Contractor` or Owner.
- 69Architects response to Owners or Contractors written request shall be made in writing withinreasonable time limit/promptness
- 70Any or all Architects interpretation & decisions shall beconsistent with the intent of contract documents and shall be in writting form or drawings
- 71Any or all Architects interpretation & decisions shall besure to secure faithful performance by Owner & Contractor
- 72Any or all Architects interpretation & decisions made in good faiththe architect isn't liable for such interpretation and decisions
- 73Any or all Architects interpretation & decisions by the Architect concerning aesthetics isfinal and must be consisent with contract documents
- 74Issuance of certificates for payments in given amounts that as been reviewed and certified and are due to the contractor shall be by theArchitect
- 75Architects review of amounts due to contractor shall be based on- evaluation of the work for comformance to contract documents
- initial completion
- results of previously carried out tests & inspections
- corrections of minor deviations from the contract documents prior to completion
- specified qualification expressed by the Architect. - 76issuance of certificate for payment is not a representation that the Architect as- made exhaustive or continous on site inspection to check quality & quantity of the Work
- reviewed construction means, methods, techniques, sequence, procedures
- reviewed copies of requisitions received from subcontractors $ supplies $ other data requested by the Owner to substantiate the contractors right to payment
- ascertained how or for what purpose the contractor as used money previously paid on account of the contract sum. - 77a record of the application & certificate for payment shall be maintained byThe architect
- 78contsruction and contractor submittal schedules shall be reviewed and not delayed or witheld approval by theArchitect
- 79sufficient time by to adequtely review submittals shall be awarded to the professional judgement of theArchitect
- 80the review of submittals by Architects is forMerely checking conformance to the information given and design concept expressed in the contract documents and NOT to check for accuracy or dimensions, quantities & installation or performace of equipments or systems which are the Contractors rresponsiblities
- 81The approval of a specific item by an Architect is notApproval of the whole assembly in which the item is a component.
- 82A Professional seal and signature must be present on any submittal submitted by the Contractor for review by theArchitect
- 83Review and Responding to RFI about the Contract Documents shall be carried out bythe Architect
- 84the requirements for RFI shall be set forth in the Contract Documents by theArchitect
- 85RFI about the contract documents to be reviewed and responded to by the Architect includes...- Specific Drawings
- Specifications in need of Clarificiations & nature of clarification requested - 86Responses to RFI by the Architect shall be made inwriting
- 87Supplemental drawings & specifications can sometimes be prepared and issued in response to RFI by theArchitect
- 88A record of submittals & copies of submittals supplied by contractors in accordance with the requirements of the Contract Documents shall be maintained by theArchitect
- 89minor deviation (doesnt involve adjustement to contract sum and contract time)- carried out by Architect
- 90construction change directive to be signed by the Owner and Architect but- prepared by the Architect
- 91Change Orders to be signed by all 3 parties but- prepared by the Architect
- 92inspections shall be conducted to determine date or dates of substantial completion and date of final completion by theArchitect
- 93issuance of certificate of substantial completion shall be by theArchitect
- 94any document received from the contractor shall be forwarded to the Owner for Owners review, records, written narratives by theArchitect
- 95a final ceritificate for payment shall be issued by the Architect based upon final inspection, indicating...to the best of Architects knowledge, information and belief the work complies with the requirments of contract documents
- 96in order to verify the list submitted by the contractor for completion or correction of the work, an inspection shall be conducted by theArchitect with the Owner
- 97After substantial completion as been achieved, the Owner shall be reminded of balance of Contract sum to be paid to the Contractor for final completion or correction of the workwho reminds the owner?
the Architect - 98Architect forwards to the Owner what he receives from the contractor: which includes...- consent of surety or sureties, if any related to the partial release of retainage or to the making of final payment
- affidavits, receipts, release and waviers of lien or bond indemifying the Owner against lie - 99Architect shall meet with the Owner to review the facility operation & performace without any compensation to the Architect. this is meeting is done...- upon the request of the owner
- prior to the expiration of 1 year from date of substantial completion. - 100supplemwental services - programming, multiple preliminary design, site evaluation & planning, development of bim for post construction use, civil engineering, interior design, detailed cost estimating, conformed documents for constrution ("issued for construction" document), as designed record drawings, as constructed record drawings (as-built drawings), Tenant related services, Telecommunications/data designcommissioning, security evaluation & planning, multiple bid packages, FF & E, Measured drawings, existing facilities survey, BIM management, Landscape design, value analysis, on site project representation, post occupany evaluation, facility support services, Architects co-ordination of owners consultants, fast track design, sustainable project services, Historic preservation, other services by speciality consulatants.
- 101Conformed Drawings: Issued for construction by the Project Engineer (PE) incorporating all changes to drawings via addenda during the bid period.As-designed Record Drawings are the record of everything the Architect designed for the Project, and include the original Construction Documents plus all addenda, Architect's Supplemental Instructions, Change Orders, Construction Change Directives and minor changes in the work.
- 102if the owner wants to carry out sustainable objective, the owner shall compensate the Architect because thats a supplemental service by using the the E204 as an attachment to the B101AgreementE204 - Sustainable Projects Exhibits
- 103additional services can be provided by the Architect after execution of the B101 Agreement without disproving...the B101 Basic services agreement.
- 104the Architect shall not proceed with additonal services without receiving a written authorization from theOwner
- 105architect must always notify with reasonable promptness & explain the facts & circumstances giving use to the need for additonal services from theOwner
- 106what type of services is neccessitated by a change in the intial information,previous instructions, approval given by the owner or material change in the projects size, quality complexity, owners budget, schedule, procurement or delivery methodall these are additonal services
- 107what type of services is neccessitated by the enactment of revision of codesadditional sevice
- 108Its an additional service when changing & editing of previously prepared instrument of services...- Instrument of services are contrary to applicable AHJ prior to issuance of building permits
- Instrument of Services are contrary to approved standard of care - 109When limits are reached for specified site visits by Architect during construction... The Architect shall notify the...Owner
- 110When limits are reached for specified inspection for any portion of the work to determine substantial completion in accordance with Contract docs... The Architect shall notify the...Owner
- 111When limits are reached for specified inspection for any portion of the work to determine final inspection... The Architect shall notify the...Owner
- 112Construction phase services provided more than 60 days after- date of substantial completion of the work
- the initial date of substantial completion identified in the A201 agreement between Owner & Contractor whichever is earlier
* shall be compensated as an additional service - 113The architect shall be compensated as additional services ; by the extention of the Architects services...if services covered in B101 agreement have not been completed within specified months of the date of the B101 agreement, without no fault of the architect.
- 114Owners Responsiblities includes establishing- budget of cost of work
- other costs needed
- reasonable contigencies related to all of these costs - 115The Owner shall update the budget throughout the duration of the project until...final completion if the budget increase or decreases
- 116The Owner shall notify the architect about updates to the budget, then Owner and Architect agree and the Architect carries out changes in...Scope and Quality
- 117Decisions and approvals to the Architects submittalls are provided by the...Owner
- 118Owner shall provide the supplemental services designated as Owners responsibilities ; if owner identify sustainable objectiveOwner shall fulfill this using E204 - Sustainable Project Exhibit attached to B101 agreement
- 119The services of the Owners consultants and services of the Architect shall be coordinated by theOwner
- 120The Owner shall provide scope of services in the Contracts between Owner & Owners consultants upon request of the...Architect
- 121If the Architect request services of consultants as required for the Scope of the Project , then The Owner shall either provide the services of consultants other than those designated as the responsibility of the Architect in Basic Services of B101 Agreement OR...Authorize the Architect to provide them as an additional service
- 122The consultants and Contractor of the owner shall maintain insurance including Professional liability insurance as required by the...Owner
- 123Tests, inspections, reports by law or Contract Documents such as Structural, Mechanical, Chemical test, test for air, water pollution test, test for hazardous materials shall be provided by theOwner
- 124All legal, insurance and accounting services iincluding auditing services at any time of the project to meet owners need & interest shall be provided by theOwner
- 125Prompt written notice to the Architect if owner becomes aware of any faults or defect in the project, including errors, omissions, inconsistences with Architects instruments of service shall be provided by theOwner
- 126Owners communication by & with the Architects Consultants shall be through theArchitect
- 127The Owner shall notify the architect of Any substance of direct communication...between the owner and contractor relating to the project
- 128The owner shall include the architect in all communication between the Owner and contractor concerning...the architects service or professional responsibilities
- 129If the Architect request information from the owner to evaluate, give notice or enforce lien rights within 15 days of a written notice from the Archiect, the information shall be provided by theOwner
- 130Duties & responsibilities set forth in the B101 agreement shall be coordinated with that of the A201 Contract for construction before executing the contract for construction by theOwner
- 131a copy of the executed agreement between the owner and contractor i.e A101 and a copy of the general conditions for the contract for construction i.e A201 shall be provided to the Architect by theOwner
- 132access shall be granted the Architect to the project site prior to commenencement of the work and the contractor shall be obligated to provide the Architect access to the work whenever it is in preparation or progress via theOwner
- 133the total cost to the owner to construct all elements of the project designed or specified by the Architect including the contractors general conditions cost, overhead and profits is calledCost of the Work
- 134the reasonable value of labor, materials and equipments donated to or by the owner is calledCost of the Work
- 135Cost of the Work does not include compensation for the ...Architect
- 136Cost of the Work does not also include...cost of land
right of way
financing
contigences for changes in work
other cost that are responsibility of owner - 137Owners budget of Cost of the work is provided in the initial information and adjusted throughout the...Project phases
- 138Evaulation of owners budget of Cost of the Work are prepared by theArchitect to represent the Architects judgement as a design professional
- 139Preliminary estimate of the cost of work are prepared by theArchitect to represent the Architects judgement as a design professional
- 140Updated estimate of cost of work is prepared by theArchitect to represent the Architects judgement as a design professional
- 141the Architect is permitted to include contigencies for - design - bidding - price escalation when preparing...estimates of the Cost of Work
- 142the Architect is permitted to include contigencies for - design - bidding - price escalation when preparing estimates of the Cost of Workto determine what materials, equipments, component systems and type of construction are to be included in the contract Docs.
- 143the Architect is permitted to include contigencies for - design - bidding - price escalation when preparing estimates of the Cost of Workto recommend reasonable adjustment in the program & scope of the project
- 144the Architect is permitted to include contigencies for - design - bidding - price escalation when preparing estimates of the Cost of Workto include design alternates as many be neccessary to adjust the estimated cost of the work to meet owners budget
- 145its a supplemental service for the Architect to provide detailed Cost estimate as required by theOwner
- 146If the procurement phase has not commenced after 90 days of the Architect submitting the Construction Documents to the Owner and at no fault of the Architect, then the Owners budget of the Cost of Work shall by adjusted to reflect changes in the general levels of prices in the...applicable construction market
- 147the Architect can reccomend to Owner adjustment in the - Project scope - Project quality - Prooject budget ; when the Architects estimate is greater than ...Owners Budget for Cost of Work
- 148the Owner shall to give written approval of an increase in the budget, If...Owners Budget for Cost of Work exceeds loweest bona fid bid or negotiated proposal at the Construction
document phase - 149the Owner shall authorize rebidding or renegotiation of the project within reasonable time, If...Owners Budget for Cost of Work exceeds loweest bona fid bid or negotiated proposal at the Construction
document phase - 150the Owner shall terminate project, If...Owners Budget for Cost of Work exceeds loweest bona fid bid or negotiated proposal at the Construction
document phase - 151the Owner shall in consultation with the Architect, revise the Project program, scope, qquality, If...Owners Budget for Cost of Work exceeds loweest bona fid bid or negotiated proposal at the Construction
document phase - 152In sending the instruments of services, Architect and Owner warrants that the sending party as permission to...send such information for use of project
- 153A non-exclusive license is granted to the Owner by the Architect to use the Architects Instruments of services solely & exclusively for the purpose of constructing, using, maintaining, adding to the project provided that the Owner...substantially performs its obligations under the B101 agreement including prompt payment of all sums due.
- 154A non - exclusive license from the Architects consultants for their IoS consistent with the agreement shall be obtained by theArchitect
- 155The license granted to the Owner by the Architect shall be terminated if the..Architect rightfully terminates the B101 agreement.
- 156The Owner releases the Architect and Architects Consultants from all claims and causes of action arising from the ..Owner using thr Architects Instruments of Services without retaining the authors that created them
- 157the owner agrees to indemify & hold harmless the Architect & Architects consultants from all costs and expenses by any 3rd party that uses the Instruments of Services arising from the...Owner using thr Architects Instruments of Services without retaining the authors that created them
- 158if the Owner rightfully terminates the B101 Agreementall the above shall not apply
- 159the owner and architect commence all claims and causes of action against the other and arising out of B101 agreement whether in contract or tort in accordance with the...requirement of the binding dispute resolution methid selected in the B101 agreemtn & within the period specified in the B101 agreement by applicable law, but in any case not more than 10 years from substantial completion
- 160the owner & architect shall waive all claims & causes of action not commenced in accordance to therequirement of the binding dispute resolution methid selected in the B101 agreemtn & within the period specified in the B101 agreement by applicable law, but in any case not more than 10 years from substantial completion
- 161to the extent damages are covered by the property insurance, the Owner and architect waive all rights against each other & against the contractors, consultants, agents & employees of others for damages except...such rights as they may have to the proceeds of such insurance as set forth in AIA Document A201–2017, General Conditions of the Contract for Construction.
- 162the Owner and architect waive consequential damages for claims, disputes or other matters in question arising out of or relating to the B101 agreementThis mutual waiver is applicable, without limitation, to all consequential damages due to either party’s termination of this Agreement, except as specifically provided in Section 9.7.
- 163Many construction agreements, including the AIA documents, includea waiver of consequential damages.
- 164Owners Failure to make payments to the Architect is called- substantial nonperfomance
- and cause for termination
or Cause for suspension of performance of services of B101 agreement - 165Architect shall give 7 days written notice to the Owner before suspending...services
- 166Architect is not liable for any delay or damages to the Owner caused due to suspensionof services
- 167Owner must pay the Architect all sums due prior to suspension & any expenses incurred in the interruption & resumption of the Architects services before resuming..services
- 168before resuming servicesthe Architects fee
architect time schedule shall be adjusted - 169The Architect shall be compensated for services performed prior to Owners suspension of theProject
- 170the Architect shall be compensated for expenses incurred in the interruption & resumption of the Architects services whenproject resumes
- 171The Architect is allowed to terminate the B101 agreement by giving 7 days written notice, If...the owner decides to suspend the project for more tha 90 DAYS for reasons not the fault of the Architect
- 172either the Owner or Architect may terminate the B101 agreement upon 7 DAYS written notice, If...both the Architect or Owner fails substantially to perform in accordance with the terms of the B101 agreement through no fualt of the person initiating the termination.
- 173the Owner may as well terminate the B101 agreement for no reason than owners convience by giving 7 DAYS written notice to theArchitect
- 174after the owner terminates the B101 agreement, the owner may compensate the Architect for cost attributable toConsultant services
- 175If owner terminates B101 agreement for convenience and Architect terminates B01 agreement due to owner suspending project for over 90 DAYS, then Owner must pay...Termination fee & Licensing Fee if Owner still wants to m,ake use of Architects Instruments of Services.
- 176Except otherwise stated, this B101 agreement shall terminate...1 year from date of substantial completion
- 177Terms in B101 agreement shall have the same meanings as those inA201
- 178If a lender agrees to assume the Owners right & obligations under B101 Agreement, including any payment due to the Architect by the OwnerOwner may assign B101 Agreement to the lender who is providing finacing the project.
- 179Neither the owner or architect may assign B101 agreement to a lender or 3rd party without the written consent of theOwner or Architect
- 180the proposed language of any certificates shall be submitted to the Architect for review atleast 14 DAYS before required dates of execution, if the owner request the Architect to execute certificates.The same applies to Consent required to facilitate assignment to Lenders
- 181anything that requires knowledge, services, responsibilities relating to certificates & consent beyond the scope of the B101 agreement, the Architect shouldn't be reuired todo them
- 182Nothing in B101 agreement shall create a contractual relationship with a 3rd party against either theowner & Architect
- 183Owner shall compensate the Architect for Basic services using- Stipulated sum
- % basis of Construction sum - 184If compensation is on a % basis - progress payment for each phase of the basic services shall be calculated by...multiplying the % identified by the owners most recent budget of the cost of work
- 185compensations in previous progress payment shall not be adjusted based onsubsequent updates to the budget of cost of work
- 186whether or not the construction phase is commenced.Architect shall be entited to compensation in acccordance with B101 agreement for all services performed.
- 187Hourly billing rates for architects & consultants are adjusted in accordance with...Architect & Architects consultants normal review practices
- 188expenses incurred by the Architect and the Architect's consultants directly related to the Project are calledReimbursable Expenses - are in addition to basic and additional services
- 189reimbursable expenses includes :- transporation & authorized out of town travels and subsistence
- Long distance services, dedicated data & communication services
- permitting & other fees required by AHJ over the project
- printing
-postage - 190reimbursable expenses includes :- expenses for overtime work authorized by owner
- rendering
- all taxes levied on professional services
- site office expenses
- regisration fees charged to certifying authority
- Owners request for insurance coverage beyond what is maintained by the Architects consultants - 191for reimbursable expenses the compensation shall be the expense incurred by the Architect & the Architects Consultant plus% of the expenses incurred
- 192An intial payment to the Architect shall be made upon execution of B101 agreement and this minimum payment under B101 agreement it shall be credited to the...Owners account account in the final invoice
- 193in the case of sustainability certification, the architects payment o the certifying authority shall be credited to the...Owners account at the time the expense is incurred.
- 194Unless otherwise agreed on ; Payment for services shall be made monthly in proportion toservices performed
- 195Payments are due & payable uponpresentation of
Architects invoice - 196Amounts unpaid @ specified day after the invoice date shallbear interest rate or at a legal prevailing rate from time to time at the principal place of business of the Architect
- 197records of reimbursable expenses - refer to expenses pertaining to supplemental & additional services & services performed on the basis of hourly rates shall be available to theOwner at mutually
convenient times - 198Scope of the Agreement includesB101
E203 - BIM & Digital data exhibit
Exhibits - E204 - Sustainable Project Exhibit