Karteikarten
Project Scope Management (Week 10)
Karten in diesem Stapel (23)
- 1What is Scope?Scope refers to all work involved in creating the products of the project & processes undertaken to make them
- 2What is a deliverable?A product that is a result of a project. It can consist of
* Hardware
*Software
*Planning Docs
*meeting minutes - 3What does Scope Management do?It tells us what processes are used to control and define what is and what isn't in scope
- 4How is Scope planned?It is done through gathering requirements
- 5How is Scope Defined?By reviewing :
* project charter
* Requirements Documents
*Organizational processes to create Scope - 6Why is a Work Breakdown Structure made?It is made to subdivide the major project deliverables into smaller and more manageable components
- 7What is a Work package?It is the lowest level of detail in a WBS. It is also considered to be more than 80hrs of work
- 8What are outputs from Scope management1. Scope Management Plan
2. Requirements Management Plan
3.Requirements Documentation
4. Requirements Traceability Matrix
5. Project Scope Statement
6. Project Documents Updates
7. Scope Baseline, Project Documents - 9What are the two important Outputs from Scope ManagementScope Management Plan
Requirements Management Plan - 10What does a requirements management plant show?It documents how project requirements will be analyzed, documented and managed
- 11What are the categories of a requirements documents?*Functional
*Service
*Performance
*Quality
*Training requirements - 12What does a requirements management plan describe?It describes how a project is
Analyzed
Documented
Managed - 13What does a requirements traceability matrix showRequirements
Attributes of requirement
Status of requirements - 14What are some inputs for preparing a scope statement?Project Charter
Requirement Doc
Org. Processes - 15What is a WBS?A work breakdown structure is a deliverable oriented grouping of work in a project that helps define the total scope
- 16What is a Work Package*A task at the lowest level of the WBS
- 17What are approaches to developing a WBS?Analogy approach
Top-Down Approach
Bottom up approach
Mind mapping - 18What is a WBS dictionary?WBS Dictionary is a document that describes detailed information about each WBS item
- 19What does the work content of a WBS item consist of?It is the sum of all of the WBS items below it
- 20What happens in scope verification?It is when there is a formal acceptance of the completed project scope by stakeholders
- 21What is variance in controlling scope?Difference between planned and actual performance
- 22What is the goal of scope control?Influence factors that cause scope changes
use integrated change control
manage changes on occurences - 23**What are the main processes of Scope management1. Defining Scope Management
2. Collecting Requirements
3. Defining Scope
4. Creating WBS
5. Verify Scope
6. Control Scope