GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

SV&V vocab week 2

Kevin Muncie Englisch 18 Karten

Karten in diesem Stapel (18)

  1. 1sqaA systems process that evaluates processes and products with emphasis on monitoring processes to ensure the quality of the delivered product; ensures compliance to standards and procedures
  2. 2Role of the SQA group1 Prepares an sqa plan for a project
    2 Participates in the development of the projects software process description
    3 Reviews software Engineering activities to verify compliance with the defined software process
    4 Audits designated software work products to verify compliance with these defined as part of the software process
    5 Ensures that deviations in software work and work products are documented and handled according to a procedure
    6 Records any noncompliance and reports to senior managment
  3. 3Time to marketthe cycle time between product conception and product fulfillment
  4. 4Time to profitthe time from when a product is released to the break even point
  5. 5time to market approachQuality of product frequnetly suffers
    higher maintenance and support costs
    unhappy customers
    Break-even point occurs later
  6. 6Time to profit approachThe quality of the product is usually better
    Lower maintenance and support cost
    Happier customers
    Break-even point occurs sooner
  7. 7Cost quality measureUsed for convencing managment that it is more cost effective to spend time and effort on defect detection and preention related activities than on defect removal activities
  8. 8Six-SigmaIs a quality managment program that measures and improves a company's operational performance by identifying and correcting defects in its processes and product
  9. 9Shewhart cyclePlan
    Do
    Check
    Apply
  10. 10S/W development process normally containsPurpose
    Activities
    Deliverables
    Tools
    Exit Criteria
    Metrics
  11. 11RTMRequirements Traceability Matrix
  12. 12SRSSoftware Requirements Specification
  13. 13V&VVerification and Validation
  14. 14SCMSoftware Configuration Managment
  15. 15SPRSoftware Problem Report
  16. 16SDDSoftware Design Description
  17. 17SDPSoftware Development Plan
  18. 18SQASoftware Quality Assurance

Informationen

Beschreibung
lijgi;erasgh
Erstellt von
Kevin Muncie
Aufrufe
12
Tags
sv&v
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck