GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

S5 - Installation and Conversion

Nikola Przyplata Section 5 Englisch 5,0Durchschnittliche Bewertung 5,0 von 5 (1 Bewertung) 5 Karten

Karten in diesem Stapel (5)

  1. 1Installation and conversion5this sees the system put into its working environment o be used by the client and involves conversion of any existing systems that will be superseded by the new solution and linking to any other systems with which it needs to operate.
  2. 2What happens at this stage?the system documentation will be presented to the client at this stage including the operational user guide and technical documentation that may be needed for future maintenance
  3. 3What happens at this stage? 2most of the training of users will need to take place, although some prior training may have happened in a stimulated environment. Developers are likely to remain on site until they know the new solution is fully functional and operating correctly before the solution is handed over to the client.
  4. 4Deliverables-fully functional solution, signed off by the client
    -full documentation including user guide and technical documentation
  5. 5—

Informationen

Beschreibung
Section 5 Karteikarten am S5 - Installation and Conversion, erstellt von Nikola Przyplata am 05/03/2018.
Erstellt von
Nikola Przyplata
Aufrufe
19
Bewertung
Durchschnittliche Bewertung 5,0 von 5 (1 Bewertung)

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck