Contract Practice Cards

Fred Fulford T17 Contract Practice chartership Englisch 12 Karten

Karten in diesem Stapel (12)

  1. 1What is your understanding of a contract?A legally binding document between two parties which is created by offer and acceptance, resulting in a contractual agreement.
  2. 2How can a contract be executed?Underhand - limitation of 6 years
    As a deed - limitation of 12 years
  3. 3What documents form a contract?Preliminaries
    Contract particulars
    Pricing document
    Drawings and specification
    Contract amendments
  4. 4How do you negotiate a final account?Discuss final account position with team
    Analysis any variations or changes
    Gather all relevant information in order to prepare for agreement or negotiation
  5. 5What is retention?Set out in the contract particulars, it is monies retained to the employer on each valuation, as a security for the works to be complete on time and to the required standard. Half released at PC and rest after defects liability.
  6. 6Can you name the sections of a JCT contract?Definitions
    Carrying out the works
    Control of the works
    Payment
    Change
    Insurance
    Third party rights
    Termination
    Dispute
  7. 7Where is retention mentioned in the contract?Included in the contract particulars
  8. 8How do you determine the amount of retention? What can be put in place instead of retention?Normally around 3-5% and is to be agreed with the contractor.
    A retention bond can be put in place if retention is not agreed.
  9. 9What is a retention bond?Instead of monies being help back from the contractor on each valuation, the same amount is paid to the employer from the bond in the event of the works not being completed as per the contract.
  10. 10What are the different types of bond?Retention bond
    On demand bond
    Advanced payment bond
    Performance bond
  11. 11What is included in the preliminaries?A document that describes the project for pricing.
    General summary
    method statement
    Pre-construciton information
    planning & site conditions
    statutory approvals
    insurance and bonds
    SWMP
    management of works
    Day works and PS's
  12. 12What are some of the relevant events?Instructions
    Variations
    Deferment of access to the site
    Compliance with instructions for antiquities
    Suspend of works by contractors due to late payment by employer
    Any impediment by employer or team

Informationen

Beschreibung
chartership T17 Contract Practice Karteikarten am Contract Practice Cards, erstellt von Fred Fulford am 01/11/2015.
Erstellt von
Fred Fulford
Aufrufe
2
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck